X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176052502002

Well Details

Well ID: 1176052502002
Loading map...
Location: 00/02-25-117-05W6/2
Location Alias: 00/02-25-17-05 W6M
Location Alias 2: 00/02-25-117-05 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 05
Section: 25
County/Municipality: Mackenzie County
Well Name: ACL MU ZAMA 2-25-117-5
Operator Name: Paramount Resources Ltd.
License Number: 0032650
License Date: 1967-08-23
License Status: Abandoned
Spud Date: 1967-08-29
Final Drill Date: 1967-09-26
Well Total Depth: 1670.30 m
Surface Hole Latitude: 59.186741
Surface Hole Longitude: -118.693779

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-08-23 Obtained License
1967-09-09 Drill Stem Test Performed
1967-09-14 Drill Stem Test Performed
1967-09-20 Drill Stem Test Performed
1967-09-21 Drill Stem Test Performed
1967-09-23 Drill Stem Test Performed
1967-09-26 Finished Drilling
1967-09-26 Well Mode changed to Drilled and Cased
1967-09-27 Drill Stem Test Performed
1967-09-28 Drill Stem Test Performed
1967-09-29 Liner Casing Operation Performed
1967-10-18 Perforation Treatment Performed - Jet Perforation
1967-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-10-28 Well Began Production
1967-10-28 Well Fluid changed to Crude Oil
1967-10-28 Well Mode changed to Flowing
1968-02-11 Well Fluid changed to Crude Oil
1968-02-11 Well Mode changed to Pumping
1980-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-31 Well Fluid changed to Crude Oil
1984-10-31 Well Mode changed to Suspended
1997-01-21 Well Log Performed
1997-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-22 Plug Back Performed
1997-01-22 Well Fluid changed to Crude Oil
1997-01-22 Well Log Performed
1997-01-22 Well Mode changed to Abandoned Zone
1997-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-23 Perforation Treatment Performed - Jet Perforation
2000-08-19 Perforation Treatment Performed - Jet Perforation
2000-08-19 Well Log Performed
2000-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-31 Perforation Treatment Performed - Cement Squeeze
2010-01-31 Plug Back Performed
2010-02-13 Perforation Treatment Performed - Jet Perforation
2010-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-16 Perforation Treatment Performed - Cement Squeeze
2010-02-16 Plug Back Performed
2010-02-18 Perforation Treatment Performed - Cement Plug
2010-02-18 Plug Back Performed
2010-02-18 Well Log Performed
2010-02-19 Perforation Treatment Performed - Jet Perforation
2010-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-20 Perforation Treatment Performed - Remedial Casing
2010-02-20 Well Log Performed
2010-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-21 Perforation Treatment Performed - Jet Perforation
2010-02-21 Perforation Treatment Performed - Remedial Casing
2010-03-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-10-18 Perforation 1545.30 1548.40 10
1997-01-23 Perforation 1323.40 1324.90 13
1997-01-23 Perforation 1327.70 1329.20 13
1997-01-23 Perforation 1329.80 1330.80 13
1997-01-23 Perforation 1334.10 1336.80 13
1997-01-23 Acid Treatment 1319.70 1336.80 0
2000-08-19 Perforation 1370.40 1372.40 17
2000-08-19 Perforation 1373.60 1375.60 17
2000-08-19 Perforation 1376.50 1377.50 17
2000-08-19 Perforation 1378.50 1380.50 17
2000-08-19 Perforation 1383.50 1385.50 17
1967-10-18 Perforation 1538.60 1543.50 10
2000-08-25 Acid Treatment 1370.40 1385.50 0
2010-01-31 Cement Squeeze 1370.40 1385.50 0
2010-01-31 Cement Squeeze 1319.70 1336.80 0
2010-02-13 Perforation 1524.90 1526.70 10
2010-02-13 Perforation 1497.20 1499.30 10
2010-02-13 Perforation 1545.30 1548.40 10
2010-02-13 Perforation 1538.60 1543.50 10
2010-02-14 Packing Device Capped w/Cement 1328.00 1488.50 0
2010-02-16 Cement Squeeze 1538.60 1548.40 0
2010-02-16 Cement Squeeze 1497.20 1526.70 0
1967-10-18 Perforation 1524.90 1526.70 10
2010-02-18 Cement Plug 1298.60 1328.00 0
2010-02-19 Perforation 653.50 654.50 17
2010-02-20 Remedial Casing Cementing 653.50 654.50 0
2010-02-20 Packing Device Capped w/Cement 632.00 651.90 0
2010-02-21 Remedial Casing Cementing 302.50 303.50 0
2010-02-21 Packing Device Capped w/Cement 279.00 300.00 0
2010-02-21 Perforation 302.50 303.50 17
1967-10-18 Perforation 1497.20 1499.30 10
1967-10-20 Acid Treatment 1497.20 1548.40 0
1967-10-21 Acid Treatment 1538.60 1548.40 0
1980-06-27 Acid Treatment 1538.60 1548.40 0
1997-01-22 Packing Device Capped w/Cement 1486.60 1494.50 0
1997-01-23 Perforation 1319.70 1321.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 460 0.0 0.0 0.0
1968 3106 0.0 0.0 0.0
1969 514 0.0 0.0 0.0
1970 1298 0.0 0.0 0.0
1971 826 0.0 0.0 0.0
1972 1568 0.0 0.0 0.0
1973 2561 0.0 0.0 0.0
1974 1426 0.0 0.0 0.0
1975 1704 0.0 0.0 0.0
1976 1718 0.0 0.0 0.0
1977 3256 0.0 0.0 0.0
1978 3702 0.0 0.0 0.0
1979 3406 0.0 0.0 0.0
1980 3442 0.0 0.0 0.0
1981 3018 0.0 0.0 0.0
1982 3419 0.0 0.0 0.0
1983 6139 0.0 0.0 0.0
1984 6066 0.0 0.0 0.0

For data sources see[5]

References