X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176051002003

Well Details

Well ID: 1176051002003
Loading map...
Location: 00/02-10-117-05W6/3
Location Alias: 00/02-10-17-05 W6M
Location Alias 2: 00/02-10-117-05 W6/03
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 05
Section: 10
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 2-10-117-5
Operator Name: Paramount Resources Ltd.
License Number: 0031322
License Date: 1966-11-21
License Status: Abandoned
Spud Date: 1966-11-25
Final Drill Date: 1967-01-05
Well Total Depth: 1644.70 m
Surface Hole Latitude: 59.142790
Surface Hole Longitude: -118.751994

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-11-21 Obtained License
1966-11-25 Direction Drilling Operation Performed - 98
1966-12-13 Drill Stem Test Performed
1966-12-15 Drill Stem Test Performed
1967-01-05 Finished Drilling
1967-01-05 Well Mode changed to Drilled and Cased
1967-01-06 Drill Stem Test Performed
1967-01-09 Liner Casing Operation Performed
1967-01-20 Perforation Treatment Performed - Jet Perforation
1967-01-20 Well Log Performed
1967-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-22 Perforation Treatment Performed - Acid Wash - No Pressure
1967-01-24 Perforation Treatment Performed - Cement Squeeze
1967-01-25 Perforation Treatment Performed - Jet Perforation
1967-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-29 Perforation Treatment Performed - Jet Perforation
1967-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-30 Perforation Treatment Performed - Jet Perforation
1967-02-01 Perforation Treatment Performed - Cement Squeeze
1967-02-04 Perforation Treatment Performed - Jet Perforation
1967-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-09-08 Perforation Treatment Performed - Jet Perforation
1970-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-12-16 Perforation Treatment Performed - Jet Perforation
1994-03-21 Well Log Performed
1994-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-22 Plug Back Performed
1994-05-07 Perforation Treatment Performed - Cement Squeeze
1994-05-09 Perforation Treatment Performed - Jet Perforation
1994-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-29 Well Log Performed
1997-07-01 Well Log Performed
1997-07-02 Perforation Treatment Performed - Jet Perforation
1997-07-02 Perforation Treatment Performed - Remedial Casing
1997-07-02 Well Log Performed
2001-07-25 Well Log Performed
2001-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-26 Plug Back Performed
2001-07-26 Well Log Performed
2001-07-28 Perforation Treatment Performed - Jet Perforation
2001-07-28 Well Log Performed
2001-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-31 Perforation Treatment Performed - Jet Perforation
2001-07-31 Well Log Performed
2001-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-29 Well Began Production
2001-08-29 Well Fluid changed to Gas
2001-08-29 Well Mode changed to Flowing
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Suspended
2016-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-09-08 Plug Back Performed
2016-09-08 Well Fluid changed to Gas
2016-09-08 Well Mode changed to Abandoned Zone
2016-09-09 Well Log Performed
2016-09-10 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2016-09-10 Plug Back Performed
2016-09-10 Well Log Performed
2016-09-11 Well Log Performed
2016-09-12 Perforation Treatment Performed - Jet Perforation
2016-09-12 Well Log Performed
2016-09-13 Well Log Performed
2016-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-09-15 Perforation Treatment Performed - Remedial Casing
2016-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-09-16 Perforation Treatment Performed - Jet Perforation
2016-09-16 Well Log Performed
2016-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-09-17 Well Log Performed
2016-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-09-19 Perforation Treatment Performed - Jet Perforation
2016-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-09-21 Perforation Treatment Performed - Jet Perforation
2016-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-09-22 Perforation Treatment Performed - Remedial Casing
2016-11-16 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1966-11-25 740.70 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-01-20 Perforation 1530.40 1530.70 3
1967-01-30 Acid Treatment 1554.50 1557.50 0
1967-02-01 Cement Squeeze 1539.50 1557.50 0
1967-02-04 Perforation 1517.90 1533.10 3
1967-02-06 Acid Treatment 1517.90 1533.10 0
1970-09-08 Perforation 1578.30 1583.70 13
1970-09-09 Acid Treatment 1578.30 1583.70 0
1970-12-16 Perforation 1477.10 1484.40 7
1994-03-22 Packing Device Capped w/Cement 1501.90 1509.90 0
1994-05-07 Cement Squeeze 1477.10 1484.40 0
1994-05-09 Perforation 1451.50 1453.00 13
1967-01-22 Acid Wash 1530.40 1530.70 0
1994-05-09 Perforation 1454.50 1456.50 13
1994-05-10 Acid Treatment 1451.50 1456.50 0
1997-07-02 Perforation 555.00 556.00 13
1997-07-02 Remedial Casing Cementing 555.00 556.00 0
2001-07-26 Packing Device Capped w/Cement 1432.00 1440.00 0
2001-07-28 Perforation 1336.90 1339.90 13
2001-07-28 Perforation 1345.90 1349.70 13
2001-07-28 Perforation 1350.80 1353.80 13
2001-07-28 Perforation 1356.90 1360.90 13
2001-07-29 Acid Treatment 1336.90 1360.90 0
1967-01-22 Acid Treatment 1530.40 1530.70 0
2001-07-31 Perforation 1286.90 1288.70 13
2001-07-31 Perforation 1293.60 1296.60 13
2001-08-01 Acid Treatment 1286.90 1296.60 0
2016-09-08 Packing Device Capped w/Cement 1323.00 1331.50 0
2016-09-10 Packing Dev Cpd w/Res-Gyp Cem 1299.80 1302.80 0
2016-09-12 Perforation 639.00 640.00 99
2016-09-15 Packing Device Capped w/Cement 618.00 632.00 0
2016-09-15 Remedial Casing Cementing 639.00 640.00 0
2016-09-16 Perforation 555.00 556.00 99
2016-09-16 Packing Device Capped w/Cement 537.80 546.00 0
1967-01-24 Cement Squeeze 1530.40 1530.70 0
2016-09-16 Perforation 286.00 287.00 99
2016-09-17 Acid Treatment 286.00 287.00 0
2016-09-18 Acid Treatment 286.00 287.00 0
2016-09-19 Perforation 280.00 281.00 99
2016-09-19 Acid Treatment 280.00 281.00 0
2016-09-20 Packing Device Capped w/Cement 248.50 285.00 0
2016-09-21 Perforation 245.00 246.00 17
2016-09-22 Remedial Casing Cementing 245.00 246.00 0
2016-09-22 Packing Device Capped w/Cement 227.00 237.00 0
1967-01-25 Perforation 1539.50 1539.80 3
1967-01-26 Acid Treatment 1539.50 1539.80 0
1967-01-29 Perforation 1552.30 1554.50 7
1967-01-29 Acid Treatment 1552.30 1554.50 0
1967-01-30 Perforation 1554.50 1557.50 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2684 0.0 0.0 0.0
2002 8575 0.0 0.0 0.0
2003 7539 0.0 0.0 0.0
2004 7971 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-11-17 No Incident Encountered 0.00 0.00

For data sources see[7]

References