X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176050902000

Well Details

Well ID: 1176050902000
Loading map...
Location: 00/02-09-117-05W6/0
Location Alias: 00/02-09-17-05 W6M
Location Alias 2: 00/02-09-117-05 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 05
Section: 09
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 2-9-117-5
Operator Name: Paramount Resources Ltd.
License Number: 0031927
License Date: 1967-01-07
License Status: Suspension
Spud Date: 1967-03-10
Final Drill Date: 1967-04-14
Well Total Depth: 1595.90 m
Surface Hole Latitude: 59.141742
Surface Hole Longitude: -118.780798

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-01-07 Obtained License
1967-04-01 Drill Stem Test Performed
1967-04-02 Production Casing Operation Performed
1967-04-14 Drill Stem Test Performed
1967-04-14 Finished Drilling
1967-04-14 Well Mode changed to Drilled and Cased
1967-04-16 Drill Stem Test Performed
1967-04-19 Drill Stem Test Performed
1967-04-20 Perforation Treatment Performed - Open-Hole Completion
1967-04-25 Well Began Production
1967-04-25 Well Fluid changed to Crude Oil
1967-04-25 Well Mode changed to Flowing
1967-06-29 Well Log Performed
1967-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1967-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-18 Well Fluid changed to Crude Oil
1967-08-18 Well Log Performed
1967-08-18 Well Mode changed to Pumping
1970-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-12-09 Perforation Treatment Performed - Open-Hole Completion
1974-06-06 Well Fluid changed to Crude Oil
1974-06-06 Well Mode changed to Pumping
1992-10-01 Well Fluid changed to Crude Oil
1992-10-01 Well Mode changed to Suspended
1993-04-01 Well Fluid changed to Crude Oil
1993-04-01 Well Mode changed to Pumping
2003-07-31 Liner Casing Operation Performed
2003-07-31 Perforation Treatment Performed - Cement Squeeze
2003-07-31 Perforation Treatment Performed - Open-Hole Completion
2003-08-10 Well Log Performed
2010-12-01 Well Fluid changed to Crude Oil
2010-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-04-20 Open Hole/Barefoot Completion 1408.20 1595.90 0
2003-07-31 Open Hole/Barefoot Completion 1525.10 1595.90 0
1967-07-11 Packing Device Capped w/Cement 1559.10 1563.60 0
1967-07-12 Acid Treatment 1510.30 1516.40 0
1967-07-13 Acid Treatment 1521.00 1527.00 0
1967-07-13 Acid Treatment 1482.90 1488.90 0
1967-07-14 Acid Treatment 1472.20 1478.30 0
1970-12-09 Open Hole/Barefoot Completion 1408.20 1595.90 0
1970-12-09 Acid Treatment 1408.20 1595.90 0
2003-07-31 Cement Squeeze 1408.20 1525.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 2418 0.0 0.0 0.0
1968 3950 0.0 0.0 0.0
1969 2350 0.0 0.0 0.0
1970 2455 0.0 0.0 0.0
1972 4199 0.0 0.0 0.0
1973 4257 0.0 0.0 0.0
1974 4618 0.0 0.0 0.0
1975 6367 0.0 0.0 0.0
1976 6199 0.0 0.0 0.0
1977 7101 0.0 0.0 0.0
1978 7807 0.0 0.0 0.0
1979 8261 0.0 0.0 0.0
1980 8450 0.0 0.0 0.0
1981 8497 0.0 0.0 0.0
1982 8711 0.0 0.0 0.0
1983 8172 0.0 0.0 0.0
1984 8130 0.0 0.0 0.0
1985 8446 0.0 0.0 0.0
1986 8330 0.0 0.0 0.0
1987 8559 0.0 0.0 0.0
1988 4990 0.0 0.0 0.0
1989 7000 0.0 0.0 0.0
1990 6466 0.0 0.0 0.0
1991 4815 0.0 0.0 0.0
1992 1874 0.0 0.0 0.0
1993 6299 0.0 0.0 0.0
1994 8548 0.0 0.0 0.0
1995 8111 0.0 0.0 0.0

For data sources see[5]

References