X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176043412002

Well Details

Well ID: 1176043412002
Loading map...
Location: 00/12-34-117-04W6/2
Location Alias: 00/12-34-17-04 W6M
Location Alias 2: 00/12-34-117-04 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 04
Section: 34
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 12-34-117-4
Operator Name: Paramount Resources Ltd.
License Number: 0032815
License Date: 1967-09-26
License Status: Abandoned
Spud Date: 1967-10-01
Final Drill Date: 1967-10-17
Well Total Depth: 1496.60 m
Surface Hole Latitude: 59.206231
Surface Hole Longitude: -118.593951

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-09-26 Obtained License
1967-10-12 Well Log Performed
1967-10-17 Finished Drilling
1967-10-17 Well Mode changed to Drilled and Cased
1967-10-18 Well Log Performed
1967-10-19 Drill Stem Test Performed
1967-10-20 Liner Casing Operation Performed
1967-10-25 Perforation Treatment Performed - Jet Perforation
1967-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-02-22 Perforation Treatment Performed - Jet Perforation
1968-02-22 Well Log Performed
1968-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-24 Perforation Treatment Performed - Cement Squeeze
1986-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-25 Perforation Treatment Performed - Jet Perforation
1986-03-25 Well Log Performed
1994-09-30 Well Log Performed
1994-10-01 Perforation Treatment Performed - Jet Perforation
1994-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-05 Well Log Performed
1994-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-06 Plug Back Performed
1994-10-06 Well Log Performed
1997-12-04 Perforation Treatment Performed - Jet Perforation
1997-12-04 Well Log Performed
1997-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-04-10 Well Began Production
1998-04-10 Well Fluid changed to Gas
1998-04-10 Well Mode changed to Flowing
2002-02-08 Perforation Treatment Performed - Jet Perforation
2002-02-08 Well Log Performed
2002-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-12 Well Fluid changed to Gas
2002-02-12 Well Mode changed to Suspended
2002-05-05 Well Fluid changed to Gas
2002-05-05 Well Mode changed to Flowing
2002-07-29 Well Fluid changed to Gas
2002-07-29 Well Mode changed to Suspended
2002-09-08 Well Fluid changed to Gas
2002-09-08 Well Mode changed to Flowing
2004-03-11 Well Fluid changed to Gas
2004-03-11 Well Mode changed to Flowing
2009-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-18 Well Log Performed
2009-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-19 Plug Back Performed
2009-03-19 Well Log Performed
2009-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-20 Plug Back Performed
2009-03-20 Well Fluid changed to Gas
2009-03-20 Well Log Performed
2009-03-20 Well Mode changed to Abandoned Zone
2009-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-21 Perforation Treatment Performed - Jet Perforation
2009-03-21 Perforation Treatment Performed - Remedial Casing
2009-03-21 Well Log Performed
2009-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-22 Perforation Treatment Performed - Jet Perforation
2009-03-22 Perforation Treatment Performed - Remedial Casing
2009-03-29 Well Abandoned
2009-03-29 Well Fluid changed to Gas
2009-03-29 Well Mode changed to Abandoned
2009-03-30 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-10-25 Perforation 1446.60 1448.40 7
1994-10-01 Perforation 1474.00 1476.00 13
1994-10-01 Perforation 1467.50 1469.50 13
1994-10-01 Perforation 1449.50 1452.00 13
1994-10-02 Acid Treatment 1449.50 1484.50 0
1994-10-03 Acid Treatment 1449.50 1484.50 0
1994-10-06 Packing Device Capped w/Cement 1432.00 1440.00 0
1997-12-04 Perforation 1331.30 1332.50 14
1997-12-04 Perforation 1333.80 1335.00 14
1997-12-04 Perforation 1338.60 1341.70 14
1997-12-05 Acid Treatment 1331.30 1341.70 0
1967-10-25 Perforation 1450.20 1451.50 7
2002-02-08 Perforation 1279.00 1281.00 13
2002-02-09 Acid Treatment 1279.00 1281.00 0
2009-03-18 Packing Device Capped w/Cement 1350.70 1393.50 0
2009-03-19 Packing Device Capped w/Cement 1315.00 1323.00 0
2009-03-20 Packing Device Capped w/Cement 1265.00 1273.00 0
2009-03-21 Perforation 631.00 632.00 17
2009-03-21 Remedial Casing Cementing 631.00 632.00 0
2009-03-21 Packing Device Capped w/Cement 612.00 629.00 0
2009-03-22 Perforation 284.00 285.00 17
2009-03-22 Remedial Casing Cementing 284.00 285.00 0
1967-10-26 Acid Treatment 1446.60 1451.50 0
2009-03-22 Packing Device Capped w/Cement 244.00 280.00 0
1968-02-22 Perforation 1456.90 1460.00 7
1968-03-16 Acid Treatment 1456.90 1460.00 0
1986-03-24 Cement Squeeze 1446.60 1460.00 0
1986-03-25 Perforation 1446.10 1448.80 13
1986-03-25 Acid Treatment 1446.10 1448.80 0
1994-10-01 Perforation 1483.00 1484.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 6067 0.0 0.0 0.0
1999 8159 0.0 0.0 0.0
2000 8759 0.0 0.0 0.0
2001 8436 0.0 0.0 0.0
2002 5595 0.0 0.0 0.0
2003 7294 0.0 0.0 0.0
2004 1439 0.0 0.0 0.0

For data sources see[5]

References