If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1176042903003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.186251,"lon":-118.648709,"icon":""}]} |
| Location: 00/03-29-117-04W6/3 | |
| Location Alias: 00/03-29-17-04 W6M | |
| Location Alias 2: 00/03-29-117-04 W6/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 117 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 29 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL ZAMA 3-29-117-4 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0180014 | |
| License Date: 1995-08-16 | |
| License Status: Abandoned | |
| Spud Date: 1995-09-12 | |
| Final Drill Date: 1995-09-20 | |
| Well Total Depth: 1600.00 m | |
| Surface Hole Latitude: 59.186251 | |
| Surface Hole Longitude: -118.648709 |
| Date | Event |
|---|---|
| 1995-08-16 | Obtained License |
| 1995-09-14 | Direction Drilling Operation Performed - Horizontal |
| 1995-09-20 | Finished Drilling |
| 1995-09-20 | Perforation Treatment Performed - Open-Hole Completion |
| 1995-09-20 | Well Mode changed to Drilled and Cased |
| 1995-09-21 | Rig Released |
| 1995-09-29 | Well Began Production |
| 1995-09-29 | Well Fluid changed to Crude Oil |
| 1995-09-29 | Well Mode changed to Pumping |
| 1995-10-10 | Well Log Performed |
| 2010-10-31 | Well Fluid changed to Crude Oil |
| 2010-10-31 | Well Mode changed to Suspended |
| 2010-11-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-11-16 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-16 | Plug Back Performed |
| 2010-11-16 | Well Fluid changed to Crude Oil |
| 2010-11-16 | Well Mode changed to Abandoned Zone |
| 2010-11-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-11-17 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-17 | Perforation Treatment Performed - Remedial Casing |
| 2010-11-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-11-18 | Perforation Treatment Performed - Remedial Casing |
| 2010-11-24 | Well Abandoned |
| 2010-11-24 | Well Fluid changed to Crude Oil |
| 2010-11-24 | Well Mode changed to Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1995-09-14 | 1446.60 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1995-09-20 | Open Hole/Barefoot Completion | 1445.00 | 1600.00 | 0 |
| 2010-11-16 | Packing Device Capped w/Cement | 1426.00 | 1436.00 | 0 |
| 2010-11-16 | Perforation | 632.50 | 633.50 | 17 |
| 2010-11-17 | Remedial Casing Cementing | 632.50 | 633.50 | 0 |
| 2010-11-17 | Packing Device Capped w/Cement | 615.00 | 625.00 | 0 |
| 2010-11-17 | Perforation | 284.00 | 285.00 | 17 |
| 2010-11-18 | Remedial Casing Cementing | 284.00 | 285.00 | 0 |
| 2010-11-18 | Packing Device Capped w/Cement | 269.80 | 279.40 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1995 | 456 | 0.0 | 0.0 | 0.0 |
| 1996 | 737 | 0.0 | 0.0 | 0.0 |
For data sources see[6]