X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176042612002

Well Details

Well ID: 1176042612002
Loading map...
Location: 00/12-26-117-04W6/2
Location Alias: 00/12-26-17-04 W6M
Location Alias 2: 00/12-26-117-04 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 04
Section: 26
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 12-26-117-4
Operator Name: Paramount Resources Ltd.
License Number: 0031582
License Date: 1967-01-10
License Status: Abandoned
Spud Date: 1967-01-11
Final Drill Date: 1967-02-08
Well Total Depth: 1603.20 m
Surface Hole Latitude: 59.192387
Surface Hole Longitude: -118.565435

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-01-10 Obtained License
1967-01-29 Drill Stem Test Performed
1967-02-06 Drill Stem Test Performed
1967-02-08 Finished Drilling
1967-02-10 Production Casing Operation Performed
1967-02-26 Perforation Treatment Performed - Jet Perforation
1968-06-08 Perforation Treatment Performed - Cement Squeeze
1968-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-06-10 Perforation Treatment Performed - Jet Perforation
1968-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-13 Well Log Performed
1982-02-15 Well Log Performed
1982-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-20 Perforation Treatment Performed - Jet Perforation
1982-03-30 Well Mode changed to Drilled and Cased
1982-05-28 Well Began Production
1982-05-28 Well Fluid changed to Gas
1982-05-28 Well Mode changed to Flowing
1985-07-21 Perforation Treatment Performed - Cement Squeeze
1985-07-21 Well Log Performed
1985-07-26 Well Log Performed
1991-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-09-06 Plug Back Performed
1991-09-06 Well Fluid changed to Gas
1991-09-06 Well Mode changed to Abandoned Zone
1991-09-07 Perforation Treatment Performed - Jet Perforation
1995-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-12 Plug Back Performed
1995-01-14 Perforation Treatment Performed - Cement Plug
2011-07-18 Well Log Performed
2011-07-19 Well Log Performed
2011-07-20 Perforation Treatment Performed - Jet Perforation
2011-07-27 Well Log Performed
2011-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-29 Perforation Treatment Performed - Remedial Casing
2011-07-29 Well Log Performed
2011-07-30 Perforation Treatment Performed - Jet Perforation
2011-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-31 Perforation Treatment Performed - Remedial Casing
2011-08-01 Well Log Performed
2011-08-02 Perforation Treatment Performed - Jet Perforation
2011-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-03 Perforation Treatment Performed - Remedial Casing
2011-08-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-02-26 Perforation 1435.30 1436.20 10
1968-06-13 Acid Treatment 1435.60 1447.80 0
1982-02-18 Packing Device Capped w/Cement 1361.00 1365.00 0
1982-02-20 Perforation 1314.00 1314.90 7
1982-02-20 Perforation 1316.60 1318.30 7
1982-02-20 Perforation 1319.20 1322.20 7
1982-02-20 Perforation 1327.00 1328.90 7
1982-02-20 Perforation 1330.70 1334.40 7
1985-07-21 Cement Squeeze 1327.00 1334.40 0
1991-09-06 Packing Device Capped w/Cement 1292.00 1300.00 0
1991-09-07 Perforation 1265.50 1268.00 13
1967-02-26 Perforation 1438.40 1439.60 10
1995-01-12 Packing Device Capped w/Cement 1252.00 1260.00 0
1995-01-14 Cement Plug 468.00 1030.00 0
2011-07-20 Perforation 264.00 265.00 17
2011-07-29 Remedial Casing Cementing 264.00 265.00 0
2011-07-29 Packing Device Capped w/Cement 252.00 260.00 0
2011-07-30 Perforation 233.00 234.00 17
2011-07-31 Remedial Casing Cementing 233.00 234.00 0
2011-07-31 Packing Device Capped w/Cement 214.00 226.00 0
2011-08-02 Perforation 196.00 197.00 17
2011-08-03 Remedial Casing Cementing 196.00 197.00 0
1967-02-26 Perforation 1440.80 1447.20 10
2011-08-03 Packing Device Capped w/Cement 184.00 194.00 0
1968-06-08 Cement Squeeze 1435.30 1447.20 0
1968-06-10 Perforation 1435.60 1436.50 10
1968-06-10 Perforation 1439.00 1440.20 10
1968-06-10 Perforation 1441.70 1444.80 10
1968-06-10 Perforation 1446.60 1447.80 10
1968-06-10 Acid Treatment 1435.60 1447.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1763 0.0 0.0 0.0
1983 1453 0.0 0.0 0.0
1984 984 0.0 0.0 0.0
1985 2201 0.0 0.0 0.0
1986 6071 0.0 0.0 0.0
1987 4647 0.0 0.0 0.0
1988 1704 0.0 0.0 0.0
1989 105 0.0 0.0 0.0
1990 1710 0.0 0.0 0.0

For data sources see[5]

References