X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176042508000

Well Details

Well ID: 1176042508000
Loading map...
Location: 00/08-25-117-04W6/0
Location Alias: 00/08-25-17-04 W6M
Location Alias 2: 00/08-25-117-04 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 04
Section: 25
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 8-25-117-4
Operator Name: Paramount Resources Ltd.
License Number: 0125093
License Date: 1986-12-15
License Status: Abandoned
Spud Date: 1986-12-28
Final Drill Date: 1987-01-15
Well Total Depth: 1565.00 m
Surface Hole Latitude: 59.190026
Surface Hole Longitude: -118.517704

For data sources see[1][2]

Well History

Date Event
1986-12-15 Obtained License
1986-12-30 Surface Casing Operation Performed
1987-01-05 Well Log Performed
1987-01-06 Well Log Performed
1987-01-07 Intermediate Casing Operation Performed
1987-01-09 Lost Circulation Occurred
1987-01-10 Lost Circulation Occurred
1987-01-15 Finished Drilling
1987-01-15 Well Mode changed to Drilled and Cased
1987-01-16 Well Log Performed
1987-01-17 Well Log Performed
1987-01-18 Liner Casing Operation Performed
1987-01-19 Rig Released
1987-03-24 Perforation Treatment Performed - Jet Perforation
1987-03-24 Well Log Performed
1987-06-20 Well Began Production
1987-06-20 Well Fluid changed to Crude Oil
1987-06-20 Well Mode changed to Flowing
1988-08-18 Well Fluid changed to Crude Oil
1988-08-18 Well Mode changed to Pumping
1989-10-18 Well Log Performed
1989-10-19 Perforation Treatment Performed - Jet Perforation
1989-10-19 Well Log Performed
1989-10-20 Well Log Performed
1989-10-22 Perforation Treatment Performed - Jet Perforation
1989-10-22 Well Fluid changed to Crude Oil
1989-10-22 Well Mode changed to Pumping
1990-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-27 Plug Back Performed
1994-05-27 Well Fluid changed to Crude Oil
1994-05-27 Well Mode changed to Abandoned Zone
1994-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-28 Plug Back Performed
1994-05-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-03-24 Perforation 1486.00 1490.00 13
1989-10-19 Perforation 1494.00 1495.00 19
1989-10-22 Perforation 1446.00 1448.00 13
1989-10-22 Perforation 1452.50 1454.00 13
1989-10-22 Perforation 1456.50 1458.00 13
1990-05-11 Acid Treatment 1486.00 1495.00 0
1994-05-27 Packing Device Capped w/Cement 1476.00 1484.00 0
1994-05-28 Packing Device Capped w/Cement 1436.00 1444.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 4214 0.0 0.0 0.0
1988 7875 0.0 0.0 0.0
1989 4039 0.0 0.0 0.0
1990 332 0.0 0.0 0.0
1991 1138 0.0 0.0 0.0
1992 956 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-01-09 Lost Circulation 1246.90 1246.90
1987-01-10 Lost Circulation 1338.00 1447.00

For data sources see[6]

References