X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176042415002

Well Details

Well ID: 1176042415002
Loading map...
Location: 00/15-24-117-04W6/2
Location Alias: 00/15-24-17-04 W6M
Location Alias 2: 00/15-24-117-04 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 04
Section: 24
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 15-24-117-4
Operator Name: Paramount Resources Ltd.
License Number: 0151902
License Date: 1992-03-03
License Status: Abandoned
Spud Date: 1992-11-18
Final Drill Date: 1992-11-27
Well Total Depth: 1473.00 m
Surface Hole Latitude: 59.182923
Surface Hole Longitude: -118.525657

For data sources see[1][2]

Well History

Date Event
1992-03-03 Obtained License
1992-11-18 Surface Casing Operation Performed
1992-11-24 Well Log Performed
1992-11-25 Intermediate Casing Operation Performed
1992-11-27 Finished Drilling
1992-11-27 Lost Circulation Occurred
1992-11-27 Well Log Performed
1992-11-27 Well Mode changed to Drilled and Cased
1992-11-28 Liner Casing Operation Performed
1992-11-29 Rig Released
1992-11-29 Well Log Performed
1992-12-04 Well Log Performed
1992-12-05 Perforation Treatment Performed - Jet Perforation
1992-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-07-23 Well Log Performed
2008-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-24 Plug Back Performed
2008-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-07-25 Perforation Treatment Performed - Jet Perforation
2008-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-30 Plug Back Performed
2008-07-30 Well Mode changed to Abandoned Zone
2008-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-02 Perforation Treatment Performed - Jet Perforation
2008-08-02 Plug Back Performed
2008-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-05 Perforation Treatment Performed - Remedial Casing
2008-08-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-12-05 Perforation 1427.00 1429.00 13
2008-08-02 Perforation 593.00 594.00 17
2008-08-02 Packing Device Capped w/Cement 1232.00 1240.00 0
2008-08-05 Remedial Casing Cementing 593.00 594.00 0
2008-08-05 Packing Device Capped w/Cement 564.00 584.00 0
1992-12-05 Perforation 1430.00 1431.00 13
1992-12-06 Acid Treatment 1427.00 1431.00 0
2008-07-24 Packing Device Capped w/Cement 1409.00 1417.00 0
2008-07-25 Perforation 1307.00 1310.00 13
2008-07-25 Acid Treatment 1307.00 1310.00 0
2008-07-25 Perforation 1251.00 1253.00 13
2008-07-26 Acid Treatment 1251.00 1253.00 0
2008-07-30 Packing Device Capped w/Cement 1269.00 1302.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1992-11-27 Lost Circulation 1473.00 1473.00

For data sources see[5]

References