X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176042202022

Well Details

Well ID: 1176042202022
Loading map...
Location: 02/02-22-117-04W6/2
Location Alias: 02/02-22-17-04 W6M
Location Alias 2: 02/02-22-117-04 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 04
Section: 22
County/Municipality: Mackenzie County
Well Name: ACL 102 KR ZAMA 2-22-117-4
Operator Name: Paramount Resources Ltd.
License Number: 0104364
License Date: 1983-11-28
License Status: Suspension
Spud Date: 1983-12-05
Final Drill Date: 1983-12-28
Well Total Depth: 1595.00 m
Surface Hole Latitude: 59.172085
Surface Hole Longitude: -118.579309

For data sources see[1][2]

Well History

Date Event
1983-11-28 Obtained License
1983-12-17 Well Log Performed
1983-12-22 Drill Stem Test Performed
1983-12-23 Drill Stem Test Performed
1983-12-26 Lost Circulation Occurred
1983-12-28 Finished Drilling
1983-12-28 Well Mode changed to Drilled and Cased
1983-12-29 Well Log Performed
1983-12-30 Kick Occurred
1983-12-31 Lost Circulation Occurred
1984-01-03 Liner Casing Operation Performed
1984-02-11 Well Log Performed
1984-02-12 Perforation Treatment Performed - Jet Perforation
1984-02-12 Well Log Performed
1985-05-24 Perforation Treatment Performed - Jet Perforation
1985-05-24 Well Log Performed
1988-04-07 Perforation Treatment Performed - Jet Perforation
1988-04-07 Well Log Performed
1988-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-24 Perforation Treatment Performed - Jet Perforation
1991-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-26 Perforation Treatment Performed - Cement Squeeze
1991-09-22 Perforation Treatment Performed - Jet Perforation
1991-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-23 Perforation Treatment Performed - Cement Squeeze
1996-11-19 Perforation Treatment Performed - Jet Perforation
1996-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-21 Perforation Treatment Performed - Cement Squeeze
1996-11-23 Perforation Treatment Performed - Cement Squeeze
1996-11-28 Well Log Performed
1996-12-01 Perforation Treatment Performed - Jet Perforation
1996-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-11 Well Log Performed
2000-01-12 Well Log Performed
2000-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-12 Perforation Treatment Performed - Jet Perforation
2000-02-12 Plug Back Performed
2000-02-12 Well Log Performed
2000-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-20 Well Began Production
2000-03-20 Well Fluid changed to Gas
2000-03-20 Well Mode changed to Flowing
2003-11-09 Perforation Treatment Performed - Cement Squeeze
2003-11-09 Plug Back Performed
2003-11-09 Well Fluid changed to Gas
2003-11-09 Well Mode changed to Abandoned Zone
2003-11-12 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-02-12 Perforation 1470.00 1475.00 13
1991-09-22 Perforation 1465.00 1465.30 80
1991-09-23 Acid Treatment 1465.00 1465.30 0
1991-09-23 Cement Squeeze 1465.00 1465.30 0
1996-11-19 Perforation 1464.00 1465.00 13
1996-11-20 Acid Treatment 1464.00 1465.00 0
1996-11-21 Cement Squeeze 1464.00 1465.00 0
1996-11-23 Cement Squeeze 1428.50 1451.00 0
1996-12-01 Perforation 1432.00 1434.00 13
1996-12-01 Perforation 1428.50 1430.00 13
1996-12-02 Acid Treatment 1428.50 1434.00 0
1985-05-24 Perforation 1449.00 1451.00 13
2000-02-12 Packing Device Capped w/Cement 1417.00 1425.00 0
2000-02-12 Perforation 1314.00 1317.50 13
2000-02-16 Acid Treatment 1314.00 1317.50 0
2003-11-09 Cement Squeeze 1314.00 1317.50 0
2003-11-12 Perforation 1428.50 1430.00 13
2003-11-12 Perforation 1432.00 1434.00 13
1985-05-24 Perforation 1439.00 1446.00 13
1988-04-07 Perforation 1428.50 1430.30 13
1988-04-07 Perforation 1432.00 1434.00 13
1988-04-08 Acid Treatment 1439.00 1451.00 0
1991-07-24 Perforation 1468.00 1468.30 80
1991-07-26 Acid Treatment 1468.00 1475.00 0
1991-07-26 Cement Squeeze 1468.00 1475.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5825 0.0 0.0 0.0
2001 5544 0.0 0.0 0.0
2002 4561 0.0 0.0 0.0
2003 1114 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-12-26 Lost Circulation 1470.00 1595.00
1983-12-30 Kick 1595.00 1595.00
1983-12-31 Lost Circulation 1595.00 1595.00

For data sources see[6]

References