If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1176042011002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.178205,"lon":-118.643253,"icon":""}]} |
| Location: 00/11-20-117-04W6/2 | |
| Location Alias: 00/11-20-17-04 W6M | |
| Location Alias 2: 00/11-20-117-04 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 117 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 20 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL ZAMA 11-20-117-4 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0031961 | |
| License Date: 1967-03-14 | |
| License Status: Abandoned | |
| Spud Date: 1967-03-15 | |
| Final Drill Date: 1967-04-08 | |
| Well Total Depth: 1628.50 m | |
| Surface Hole Latitude: 59.178205 | |
| Surface Hole Longitude: -118.643253 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1967-03-14 | Obtained License |
| 1967-04-08 | Finished Drilling |
| 1967-04-08 | Well Mode changed to Drilled and Cased |
| 1967-04-14 | Liner Casing Operation Performed |
| 1967-04-29 | Perforation Treatment Performed - Jet Perforation |
| 1967-04-30 | Perforation Treatment Performed - Cement Squeeze |
| 1967-05-01 | Perforation Treatment Performed - Cement Squeeze |
| 1967-05-02 | Perforation Treatment Performed - Cement Squeeze |
| 1967-05-03 | Perforation Treatment Performed - Cement Squeeze |
| 1967-05-04 | Perforation Treatment Performed - Jet Perforation |
| 1967-05-05 | Perforation Treatment Performed - Cement Squeeze |
| 1967-05-06 | Perforation Treatment Performed - Cement Squeeze |
| 1967-05-07 | Perforation Treatment Performed - Jet Perforation |
| 1967-05-08 | Perforation Treatment Performed - Cement Squeeze |
| 1967-05-09 | Perforation Treatment Performed - Cement Squeeze |
| 1967-05-09 | Perforation Treatment Performed - Jet Perforation |
| 1967-05-11 | Perforation Treatment Performed - Cement Squeeze |
| 1967-05-12 | Perforation Treatment Performed - Cement Squeeze |
| 1967-05-12 | Perforation Treatment Performed - Jet Perforation |
| 1969-07-31 | Perforation Treatment Performed - Cement Squeeze |
| 1969-08-01 | Perforation Treatment Performed - Cement Squeeze |
| 1969-08-02 | Perforation Treatment Performed - Cement Squeeze |
| 1969-08-05 | Perforation Treatment Performed - Cement Squeeze |
| 1969-08-06 | Perforation Treatment Performed - Jet Perforation |
| 1969-08-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1969-11-07 | Well Began Injection |
| 1969-11-07 | Well Fluid changed to Water |
| 1969-11-07 | Well Type changed to Injection |
| 1978-08-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1978-08-06 | Perforation Treatment Performed - Cement Squeeze |
| 1978-08-06 | Well Fluid changed to Water |
| 1978-08-06 | Well Mode changed to Abandoned Zone |
| 1978-08-06 | Well Type changed to Injection |
| 1978-08-09 | Perforation Treatment Performed - Jet Perforation |
| 1978-08-10 | Perforation Treatment Performed - Cement Squeeze |
| 1978-08-12 | Perforation Treatment Performed - Jet Perforation |
| 1996-01-30 | Well Log Performed |
| 1996-01-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-01-31 | Plug Back Performed |
| 1996-01-31 | Well Log Performed |
| 1996-02-01 | Perforation Treatment Performed - Jet Perforation |
| 1996-02-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-02-04 | Well Log Performed |
| 1996-02-05 | Perforation Treatment Performed - Jet Perforation |
| 1996-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-12-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-12-15 | Plug Back Performed |
| 2001-12-15 | Well Log Performed |
| 2001-12-18 | Perforation Treatment Performed - Cement Squeeze |
| 2001-12-18 | Perforation Treatment Performed - Jet Perforation |
| 2001-12-18 | Well Log Performed |
| 2011-10-24 | Well Log Performed |
| 2011-10-25 | Well Log Performed |
| 2011-10-30 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1967-04-29 | Perforation | 1561.80 | 1563.60 | 7 |
| 1967-05-05 | Cement Squeeze | 1552.00 | 1553.90 | 0 |
| 1967-05-06 | Cement Squeeze | 1552.00 | 1553.90 | 0 |
| 1967-05-07 | Perforation | 1539.20 | 1540.50 | 13 |
| 1967-05-08 | Cement Squeeze | 1539.20 | 1540.50 | 0 |
| 1967-05-09 | Cement Squeeze | 1539.20 | 1540.50 | 0 |
| 1967-05-09 | Perforation | 1522.80 | 1524.00 | 13 |
| 1967-05-11 | Cement Squeeze | 1522.80 | 1524.00 | 0 |
| 1967-05-12 | Cement Squeeze | 1522.80 | 1524.00 | 0 |
| 1967-05-12 | Perforation | 1513.00 | 1514.20 | 13 |
| 1969-07-31 | Cement Squeeze | 1513.00 | 1514.20 | 0 |
| 1967-04-30 | Cement Squeeze | 1561.80 | 1563.60 | 0 |
| 1969-08-01 | Cement Squeeze | 1513.00 | 1514.20 | 0 |
| 1969-08-02 | Cement Squeeze | 1513.00 | 1514.20 | 0 |
| 1969-08-05 | Cement Squeeze | 1513.00 | 1514.20 | 0 |
| 1969-08-06 | Perforation | 1481.30 | 1481.90 | 10 |
| 1969-08-06 | Perforation | 1482.50 | 1483.80 | 10 |
| 1969-08-06 | Perforation | 1528.60 | 1533.10 | 7 |
| 1969-08-10 | Acid Treatment | 1481.30 | 1483.80 | 0 |
| 1978-08-06 | Cement Squeeze | 1481.30 | 1483.80 | 0 |
| 1978-08-06 | Packing Device Capped w/Cement | 1489.00 | 1489.00 | 0 |
| 1978-08-09 | Perforation | 1460.60 | 1463.60 | 7 |
| 1967-04-30 | Cement Squeeze | 1561.80 | 1563.60 | 0 |
| 1978-08-10 | Cement Squeeze | 1460.60 | 1463.60 | 0 |
| 1978-08-12 | Perforation | 1450.80 | 1451.50 | 13 |
| 1978-08-12 | Perforation | 1452.20 | 1453.30 | 13 |
| 1996-01-31 | Packing Device Capped w/Cement | 1420.00 | 1428.00 | 0 |
| 1996-02-01 | Perforation | 1334.40 | 1336.20 | 18 |
| 1996-02-01 | Perforation | 1337.40 | 1341.10 | 18 |
| 1996-02-01 | Perforation | 1341.70 | 1349.00 | 18 |
| 1996-02-01 | Perforation | 1350.90 | 1356.40 | 18 |
| 1996-02-02 | Acid Treatment | 1334.40 | 1356.40 | 0 |
| 1996-02-05 | Perforation | 1278.90 | 1283.80 | 18 |
| 1967-05-01 | Cement Squeeze | 1561.80 | 1563.60 | 0 |
| 1996-02-05 | Perforation | 1285.60 | 1289.90 | 18 |
| 1996-02-06 | Acid Treatment | 1278.90 | 1289.90 | 0 |
| 2001-12-15 | Packing Device Capped w/Cement | 1318.00 | 1326.00 | 0 |
| 2001-12-15 | Packing Device Capped w/Cement | 1264.00 | 1272.00 | 0 |
| 2001-12-18 | Perforation | 250.00 | 251.00 | 13 |
| 2001-12-18 | Cement Squeeze | 250.00 | 251.00 | 0 |
| 1967-05-01 | Cement Squeeze | 1561.80 | 1563.60 | 0 |
| 1967-05-02 | Cement Squeeze | 1561.80 | 1563.60 | 0 |
| 1967-05-03 | Cement Squeeze | 1561.80 | 1563.60 | 0 |
| 1967-05-03 | Cement Squeeze | 1561.80 | 1563.60 | 0 |
| 1967-05-04 | Perforation | 1552.00 | 1553.90 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1969 | 0 | 0.0 | 0.0 | 0.0 |
| 1970 | 0 | 0.0 | 0.0 | 0.0 |
| 1971 | 0 | 0.0 | 0.0 | 0.0 |
| 1972 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]