X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176042011002

Well Details

Well ID: 1176042011002
Loading map...
Location: 00/11-20-117-04W6/2
Location Alias: 00/11-20-17-04 W6M
Location Alias 2: 00/11-20-117-04 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 04
Section: 20
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 11-20-117-4
Operator Name: Paramount Resources Ltd.
License Number: 0031961
License Date: 1967-03-14
License Status: Abandoned
Spud Date: 1967-03-15
Final Drill Date: 1967-04-08
Well Total Depth: 1628.50 m
Surface Hole Latitude: 59.178205
Surface Hole Longitude: -118.643253

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-03-14 Obtained License
1967-04-08 Finished Drilling
1967-04-08 Well Mode changed to Drilled and Cased
1967-04-14 Liner Casing Operation Performed
1967-04-29 Perforation Treatment Performed - Jet Perforation
1967-04-30 Perforation Treatment Performed - Cement Squeeze
1967-05-01 Perforation Treatment Performed - Cement Squeeze
1967-05-02 Perforation Treatment Performed - Cement Squeeze
1967-05-03 Perforation Treatment Performed - Cement Squeeze
1967-05-04 Perforation Treatment Performed - Jet Perforation
1967-05-05 Perforation Treatment Performed - Cement Squeeze
1967-05-06 Perforation Treatment Performed - Cement Squeeze
1967-05-07 Perforation Treatment Performed - Jet Perforation
1967-05-08 Perforation Treatment Performed - Cement Squeeze
1967-05-09 Perforation Treatment Performed - Cement Squeeze
1967-05-09 Perforation Treatment Performed - Jet Perforation
1967-05-11 Perforation Treatment Performed - Cement Squeeze
1967-05-12 Perforation Treatment Performed - Cement Squeeze
1967-05-12 Perforation Treatment Performed - Jet Perforation
1969-07-31 Perforation Treatment Performed - Cement Squeeze
1969-08-01 Perforation Treatment Performed - Cement Squeeze
1969-08-02 Perforation Treatment Performed - Cement Squeeze
1969-08-05 Perforation Treatment Performed - Cement Squeeze
1969-08-06 Perforation Treatment Performed - Jet Perforation
1969-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-11-07 Well Began Injection
1969-11-07 Well Fluid changed to Water
1969-11-07 Well Type changed to Injection
1978-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-08-06 Perforation Treatment Performed - Cement Squeeze
1978-08-06 Well Fluid changed to Water
1978-08-06 Well Mode changed to Abandoned Zone
1978-08-06 Well Type changed to Injection
1978-08-09 Perforation Treatment Performed - Jet Perforation
1978-08-10 Perforation Treatment Performed - Cement Squeeze
1978-08-12 Perforation Treatment Performed - Jet Perforation
1996-01-30 Well Log Performed
1996-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-31 Plug Back Performed
1996-01-31 Well Log Performed
1996-02-01 Perforation Treatment Performed - Jet Perforation
1996-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-04 Well Log Performed
1996-02-05 Perforation Treatment Performed - Jet Perforation
1996-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-15 Plug Back Performed
2001-12-15 Well Log Performed
2001-12-18 Perforation Treatment Performed - Cement Squeeze
2001-12-18 Perforation Treatment Performed - Jet Perforation
2001-12-18 Well Log Performed
2011-10-24 Well Log Performed
2011-10-25 Well Log Performed
2011-10-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-04-29 Perforation 1561.80 1563.60 7
1967-05-05 Cement Squeeze 1552.00 1553.90 0
1967-05-06 Cement Squeeze 1552.00 1553.90 0
1967-05-07 Perforation 1539.20 1540.50 13
1967-05-08 Cement Squeeze 1539.20 1540.50 0
1967-05-09 Cement Squeeze 1539.20 1540.50 0
1967-05-09 Perforation 1522.80 1524.00 13
1967-05-11 Cement Squeeze 1522.80 1524.00 0
1967-05-12 Cement Squeeze 1522.80 1524.00 0
1967-05-12 Perforation 1513.00 1514.20 13
1969-07-31 Cement Squeeze 1513.00 1514.20 0
1967-04-30 Cement Squeeze 1561.80 1563.60 0
1969-08-01 Cement Squeeze 1513.00 1514.20 0
1969-08-02 Cement Squeeze 1513.00 1514.20 0
1969-08-05 Cement Squeeze 1513.00 1514.20 0
1969-08-06 Perforation 1481.30 1481.90 10
1969-08-06 Perforation 1482.50 1483.80 10
1969-08-06 Perforation 1528.60 1533.10 7
1969-08-10 Acid Treatment 1481.30 1483.80 0
1978-08-06 Cement Squeeze 1481.30 1483.80 0
1978-08-06 Packing Device Capped w/Cement 1489.00 1489.00 0
1978-08-09 Perforation 1460.60 1463.60 7
1967-04-30 Cement Squeeze 1561.80 1563.60 0
1978-08-10 Cement Squeeze 1460.60 1463.60 0
1978-08-12 Perforation 1450.80 1451.50 13
1978-08-12 Perforation 1452.20 1453.30 13
1996-01-31 Packing Device Capped w/Cement 1420.00 1428.00 0
1996-02-01 Perforation 1334.40 1336.20 18
1996-02-01 Perforation 1337.40 1341.10 18
1996-02-01 Perforation 1341.70 1349.00 18
1996-02-01 Perforation 1350.90 1356.40 18
1996-02-02 Acid Treatment 1334.40 1356.40 0
1996-02-05 Perforation 1278.90 1283.80 18
1967-05-01 Cement Squeeze 1561.80 1563.60 0
1996-02-05 Perforation 1285.60 1289.90 18
1996-02-06 Acid Treatment 1278.90 1289.90 0
2001-12-15 Packing Device Capped w/Cement 1318.00 1326.00 0
2001-12-15 Packing Device Capped w/Cement 1264.00 1272.00 0
2001-12-18 Perforation 250.00 251.00 13
2001-12-18 Cement Squeeze 250.00 251.00 0
1967-05-01 Cement Squeeze 1561.80 1563.60 0
1967-05-02 Cement Squeeze 1561.80 1563.60 0
1967-05-03 Cement Squeeze 1561.80 1563.60 0
1967-05-03 Cement Squeeze 1561.80 1563.60 0
1967-05-04 Perforation 1552.00 1553.90 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0

For data sources see[5]

References