X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176041510003

Well Details

Well ID: 1176041510003
Loading map...
Location: 00/10-15-117-04W6/3
Location Alias: 00/10-15-17-04 W6M
Location Alias 2: 00/10-15-117-04 W6/03
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 04
Section: 15
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 10-15-117-4
Operator Name: Paramount Resources Ltd.
License Number: 0031831
License Date: 1967-02-23
License Status: Abandoned
Spud Date: 1967-03-05
Final Drill Date: 1967-03-27
Well Total Depth: 1557.50 m
Surface Hole Latitude: 59.163176
Surface Hole Longitude: -118.580401

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-02-23 Obtained License
1967-03-19 Drill Stem Test Performed
1967-03-24 Drill Stem Test Performed
1967-03-27 Finished Drilling
1967-03-27 Well Mode changed to Drilled and Cased
1967-03-28 Intermediate Casing Operation Performed
1967-04-05 Perforation Treatment Performed - Jet Perforation
1967-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-01-13 Perforation Treatment Performed - Cement Squeeze
1968-01-18 Perforation Treatment Performed - Jet Perforation
1968-01-19 Perforation Treatment Performed - Acid Wash - No Pressure
1968-08-10 Perforation Treatment Performed - Jet Perforation
1968-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-14 Perforation Treatment Performed - Cement Squeeze
1968-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-08 Well Log Performed
1990-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-02-13 Plug Back Performed
1990-02-18 Perforation Treatment Performed - Jet Perforation
1990-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-12 Plug Back Performed
1994-02-15 Production Casing Operation Performed
1994-02-21 Perforation Treatment Performed - Jet Perforation
1994-02-22 Well Began Production
1994-02-22 Well Fluid changed to Gas
1994-02-22 Well Mode changed to Flowing
1996-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-08 Perforation Treatment Performed - Jet Perforation
2010-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-14 Perforation Treatment Performed - Cement Squeeze
2010-02-14 Plug Back Performed
2010-02-14 Well Fluid changed to Gas
2010-02-14 Well Log Performed
2010-02-14 Well Mode changed to Abandoned Zone
2010-02-15 Perforation Treatment Performed - Jet Perforation
2010-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-16 Perforation Treatment Performed - Remedial Casing
2010-02-16 Well Log Performed
2010-02-17 Perforation Treatment Performed - Jet Perforation
2010-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-18 Perforation Treatment Performed - Remedial Casing
2010-03-16 Well Abandoned
2010-03-16 Well Fluid changed to Gas
2010-03-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-04-05 Perforation 1307.90 1310.60 7
1968-01-13 Cement Squeeze 1421.60 1429.20 0
1968-01-18 Perforation 1421.60 1422.80 10
1968-01-18 Perforation 1424.00 1427.10 10
1968-01-19 Acid Wash 1421.60 1427.10 0
1968-08-10 Perforation 1440.20 1441.40 10
1968-08-12 Acid Treatment 1440.20 1441.40 0
1968-08-14 Cement Squeeze 1440.20 1441.40 0
1968-08-23 Acid Treatment 1307.90 1320.40 0
1990-02-13 Packing Device Capped w/Cement 1405.00 1413.00 0
1990-02-18 Perforation 1305.00 1312.00 14
1967-04-05 Perforation 1314.90 1315.50 7
1990-02-18 Perforation 1316.50 1318.00 14
1990-02-18 Perforation 1319.50 1323.00 14
1990-02-20 Acid Treatment 1305.00 1323.00 0
1994-02-12 Packing Device Capped w/Cement 1289.00 1297.00 0
1994-02-21 Perforation 1255.30 1256.40 13
1994-02-21 Perforation 1258.80 1260.70 13
1994-02-21 Perforation 1265.50 1266.10 13
1996-09-11 Acid Treatment 1255.30 1260.70 0
2010-02-08 Perforation 1240.00 1241.00 13
2010-02-14 Cement Squeeze 1255.30 1266.10 0
1967-04-05 Perforation 1316.40 1318.00 7
2010-02-14 Packing Device Capped w/Cement 988.50 1232.00 0
2010-02-15 Perforation 598.00 599.00 13
2010-02-16 Packing Device Capped w/Cement 512.00 594.00 0
2010-02-16 Remedial Casing Cementing 598.00 599.00 0
2010-02-17 Perforation 255.00 256.00 13
2010-02-18 Remedial Casing Cementing 255.00 256.00 0
2010-02-18 Packing Device Capped w/Cement 249.00 251.00 0
1967-04-05 Perforation 1319.20 1320.40 7
1967-04-05 Perforation 1421.60 1422.80 7
1967-04-05 Perforation 1424.00 1427.10 7
1967-04-05 Perforation 1428.30 1429.20 7
1967-04-07 Acid Treatment 1307.90 1320.40 0
1967-04-08 Acid Treatment 1421.60 1429.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 6486 0.0 0.0 0.0
1995 3630 0.0 0.0 0.0
1996 4319 0.0 0.0 0.0
1997 5643 0.0 0.0 0.0
1998 5378 0.0 0.0 0.0
2001 2097 0.0 0.0 0.0
2002 58 0.0 0.0 0.0

For data sources see[5]

References