X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176033113002

Well Details

Well ID: 1176033113002
Loading map...
Location: 00/13-31-117-03W6/2
Location Alias: 00/13-31-17-03 W6M
Location Alias 2: 00/13-31-117-03 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 03
Section: 31
County/Municipality: Mackenzie County
Well Name: ACL ET AL ZAMA 13-31-117-3
Operator Name: Paramount Resources Ltd.
License Number: 0033114
License Date: 1967-11-24
License Status: Suspension
Spud Date: 1967-12-01
Final Drill Date: 1967-12-21
Well Total Depth: 1507.20 m
Surface Hole Latitude: 59.210284
Surface Hole Longitude: -118.509910

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-01-01 Well Log Performed
1967-11-24 Obtained License
1967-12-10 Drill Stem Test Performed
1967-12-18 Well Log Performed
1967-12-19 Drill Stem Test Performed
1967-12-20 Drill Stem Test Performed
1967-12-21 Drill Stem Test Performed
1967-12-21 Finished Drilling
1967-12-21 Well Mode changed to Drilled and Cased
1967-12-23 Production Casing Operation Performed
1968-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-01-15 Perforation Treatment Performed - Jet Perforation
1970-03-01 Well Began Injection
1970-03-01 Well Fluid changed to Water
1970-03-01 Well Type changed to Disposal
1970-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-03-25 Perforation Treatment Performed - Jet Perforation
1970-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-12-01 Well Fluid changed to Water
1972-12-01 Well Mode changed to Suspended
1972-12-01 Well Type changed to Disposal
1976-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-09-08 Well Fluid changed to Water
1976-09-08 Well Mode changed to Abandoned Zone
1976-09-08 Well Type changed to Disposal
1983-07-12 Perforation Treatment Performed - Jet Perforation
1983-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-07-14 Perforation Treatment Performed - Cement Squeeze
1983-07-16 Perforation Treatment Performed - Jet Perforation
1983-07-16 Well Log Performed
1983-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-19 Well Log Performed
1990-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-21 Perforation Treatment Performed - Jet Perforation
1990-09-21 Plug Back Performed
1990-09-21 Well Log Performed
1990-09-22 Perforation Treatment Performed - Jet Perforation
1990-09-22 Perforation Treatment Performed - Remedial Casing
1990-09-23 Perforation Treatment Performed - Remedial Casing
1994-05-05 Well Abandoned
1997-04-03 Well Log Performed
1997-04-06 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-01-15 Perforation 1444.40 1446.00 7
1983-07-14 Packing Device Capped w/Cement 1439.00 1440.00 0
1983-07-16 Perforation 1431.90 1436.20 13
1983-07-17 Acid Treatment 1431.90 1436.20 0
1990-09-21 Packing Device Capped w/Cement 1407.00 1415.00 0
1990-09-21 Perforation 635.00 635.50 13
1990-09-22 Remedial Casing Cementing 635.00 635.50 0
1990-09-22 Perforation 176.00 176.50 13
1990-09-23 Remedial Casing Cementing 176.00 176.50 0
1968-01-15 Perforation 1447.80 1450.80 7
1968-01-15 Acid Treatment 1444.40 1450.80 0
1970-03-25 Perforation 1491.40 1492.60 13
1970-03-25 Acid Treatment 1491.40 1492.60 0
1970-08-31 Acid Treatment 1491.40 1492.60 0
1976-09-08 Packing Device Capped w/Cement 1464.30 1468.50 0
1983-07-12 Perforation 1431.90 1436.20 6
1983-07-14 Cement Squeeze 1444.40 1450.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0

For data sources see[5]

References