X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176033005002

Well Details

Well ID: 1176033005002
Loading map...
Location: 00/05-30-117-03W6/2
Location Alias: 00/05-30-17-03 W6M
Location Alias 2: 00/05-30-117-03 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 03
Section: 30
County/Municipality: Mackenzie County
Well Name: ACL ET AL ZAMA 5-30-117-3
Operator Name: Paramount Resources Ltd.
License Number: 0189966
License Date: 1996-07-26
License Status: Suspension
Spud Date: 1996-08-03
Final Drill Date: 1996-08-13
Well Total Depth: 1533.00 m
Surface Hole Latitude: 59.187418
Surface Hole Longitude: -118.509508

For data sources see[1][2]

Well History

Date Event
1996-07-26 Obtained License
1996-08-04 Surface Casing Operation Performed
1996-08-06 Lost Circulation Occurred
1996-08-10 Lost Circulation Occurred
1996-08-12 Lost Circulation Occurred
1996-08-13 Finished Drilling
1996-08-13 Well Mode changed to Drilled and Cased
1996-08-14 Well Log Performed
1996-08-15 Production Casing Operation Performed
1996-08-15 Rig Released
1996-08-22 Well Log Performed
1996-08-23 Perforation Treatment Performed - Open-Hole Completion
1996-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-29 Well Log Performed
1996-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-30 Plug Back Performed
1996-08-30 Well Log Performed
1996-08-31 Perforation Treatment Performed - Jet Perforation
1996-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-01 Well Log Performed
1996-09-02 Well Log Performed
1996-09-03 Perforation Treatment Performed - Jet Perforation
1996-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-13 Perforation Treatment Performed - Cement Squeeze
1997-11-13 Plug Back Performed
1997-11-14 Perforation Treatment Performed - Cement Squeeze
1997-11-14 Well Log Performed
1997-11-18 Perforation Treatment Performed - Jet Perforation
1997-11-18 Well Log Performed
1997-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-04 Perforation Treatment Performed - Jet Perforation
2002-01-07 Well Began Production
2002-01-07 Well Fluid changed to Gas
2002-01-07 Well Mode changed to Flowing
2002-04-01 Well Fluid changed to Gas
2002-04-01 Well Mode changed to Pumping
2010-05-01 Well Fluid changed to Gas
2010-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-23 Open Hole/Barefoot Completion 1399.00 1533.00 0
1996-09-03 Perforation 1245.00 1248.00 13
1996-09-03 Perforation 1249.00 1251.00 13
1996-09-03 Perforation 1253.50 1255.00 13
1996-09-03 Perforation 1256.50 1258.00 13
1996-09-03 Perforation 1259.50 1261.50 13
1996-09-04 Acid Treatment 1245.00 1261.50 0
1997-11-13 Cement Squeeze 1285.50 1303.00 0
1997-11-13 Packing Device Capped w/Cement 1272.50 1280.00 13
1997-11-14 Cement Squeeze 1245.00 1261.50 0
1997-11-18 Perforation 1254.00 1258.00 13
1996-08-25 Acid Treatment 1472.00 1482.00 0
1997-11-19 Acid Treatment 1254.00 1258.00 0
2002-01-04 Perforation 1285.50 1287.50 13
2002-01-04 Perforation 1291.00 1293.00 13
2002-01-04 Perforation 1300.00 1303.00 13
1996-08-26 Acid Treatment 1442.00 1457.00 0
1996-08-28 Acid Treatment 1442.00 1457.00 0
1996-08-30 Packing Device Capped w/Cement 1386.00 1394.00 0
1996-08-31 Perforation 1285.50 1287.50 13
1996-08-31 Perforation 1291.00 1293.00 13
1996-08-31 Perforation 1300.00 1303.00 13
1996-09-01 Acid Treatment 1285.50 1303.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 7462 0.0 0.0 0.0
2003 8669 0.0 0.0 0.0
2004 8723 0.0 0.0 0.0
2005 4387 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-08-06 Lost Circulation 394.80 394.80
1996-08-10 Lost Circulation 1248.00 1248.00
1996-08-12 Lost Circulation 1297.00 1297.00
2013-02-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References