X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176030711000

Well Details

Well ID: 1176030711000
Loading map...
Location: 00/11-07-117-03W6/0
Location Alias: 00/11-07-17-03 W6M
Location Alias 2: 00/11-07-117-03 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 03
Section: 07
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 11-7-117-3
Operator Name: Paramount Resources Ltd.
License Number: 0165938
License Date: 1994-03-16
License Status: Abandoned
Spud Date: 1994-03-23
Final Drill Date: 1994-04-02
Well Total Depth: 1480.00 m
Surface Hole Latitude: 59.150263
Surface Hole Longitude: -118.502458

For data sources see[1][2]

Well History

Date Event
1994-03-16 Obtained License
1994-03-24 Surface Casing Operation Performed
1994-03-29 Well Log Performed
1994-03-30 Intermediate Casing Operation Performed
1994-04-01 Lost Circulation Occurred
1994-04-02 Finished Drilling
1994-04-02 Well Log Performed
1994-04-02 Well Mode changed to Drilled and Cased
1994-04-04 Liner Casing Operation Performed
1994-04-05 Rig Released
1994-04-23 Perforation Treatment Performed - Jet Perforation
1994-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-01 Well Began Production
1994-05-01 Well Fluid changed to Crude Oil
1994-05-01 Well Mode changed to Pumping
1994-08-06 Well Log Performed
1994-08-07 Perforation Treatment Performed - Jet Perforation
1994-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-30 Plug Back Performed
1997-11-30 Well Fluid changed to Crude Oil
1997-11-30 Well Log Performed
1997-11-30 Well Mode changed to Abandoned Zone
1997-12-01 Perforation Treatment Performed - Jet Perforation
1997-12-01 Well Log Performed
1997-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-12 Perforation Treatment Performed - Jet Perforation
1999-11-12 Plug Back Performed
1999-11-12 Well Log Performed
1999-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-29 Perforation Treatment Performed - Jet Perforation
2003-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-01-20 Well Log Performed
2009-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-23 Plug Back Performed
2009-01-23 Well Log Performed
2009-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-24 Perforation Treatment Performed - Jet Perforation
2009-01-24 Plug Back Performed
2009-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-25 Perforation Treatment Performed - Remedial Casing
2009-02-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-04-23 Perforation 1448.00 1449.00 13
1994-12-22 Acid Treatment 1448.00 1453.00 0
1994-12-23 Acid Treatment 1422.00 1439.00 0
1997-11-30 Packing Device Capped w/Cement 1406.00 1414.00 0
1997-12-01 Perforation 1304.00 1306.00 13
1997-12-01 Perforation 1310.00 1315.00 13
1997-12-02 Acid Treatment 1304.00 1315.00 0
1999-11-12 Packing Device Capped w/Cement 1293.00 1301.00 0
1999-11-12 Perforation 1237.00 1240.50 13
1999-11-12 Perforation 1242.50 1245.00 13
1999-11-13 Acid Treatment 1237.00 1245.00 0
1994-04-23 Perforation 1451.00 1453.00 13
2003-08-29 Perforation 1304.00 1306.00 13
2003-08-29 Perforation 1310.00 1315.00 13
2003-08-31 Acid Treatment 1304.00 1315.00 0
2003-09-01 Acid Treatment 1237.00 1245.00 0
2009-01-23 Packing Device Capped w/Cement 1269.60 1302.00 0
2009-01-24 Packing Device Capped w/Cement 1222.00 1230.00 0
2009-01-24 Perforation 582.00 583.00 17
2009-01-25 Packing Device Capped w/Cement 573.00 579.90 0
2009-01-25 Remedial Casing Cementing 582.00 583.00 0
1994-04-25 Acid Treatment 1448.00 1453.00 0
1994-08-07 Perforation 1422.00 1423.00 13
1994-08-07 Perforation 1427.00 1428.00 13
1994-08-07 Perforation 1433.00 1434.00 13
1994-08-07 Perforation 1436.00 1437.00 13
1994-08-07 Perforation 1438.00 1439.00 13
1994-08-08 Acid Treatment 1422.00 1439.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 4533 0.0 0.0 0.0
1995 6062 0.0 0.0 0.0
1996 8468 0.0 0.0 0.0
1997 6893 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-04-01 Lost Circulation 1448.10 1480.00

For data sources see[6]

References