X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176030710000

Well Details

Well ID: 1176030710000
Loading map...
Location: 00/10-07-117-03W6/0
Location Alias: 00/10-07-17-03 W6M
Location Alias 2: 00/10-07-117-03 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 03
Section: 07
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 10-7-117-3
Operator Name: Paramount Resources Ltd.
License Number: 0088705
License Date: 1981-02-02
License Status: Abandoned
Spud Date: 1981-02-27
Final Drill Date: 1981-03-14
Well Total Depth: 1601.00 m
Surface Hole Latitude: 59.147531
Surface Hole Longitude: -118.496014

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-02-02 Obtained License
1981-03-14 Finished Drilling
1981-03-16 Drill Stem Test Performed
1981-03-17 Drill Stem Test Performed
1981-03-18 Drill Stem Test Performed
1981-03-20 Production Casing Operation Performed
1981-03-20 Well Mode changed to Drilled and Cased
1982-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-19 Perforation Treatment Performed - Jet Perforation
1982-02-20 Well Began Production
1982-02-20 Well Fluid changed to Crude Oil
1982-02-20 Well Mode changed to Pumping
1994-12-10 Well Log Performed
1994-12-11 Perforation Treatment Performed - Jet Perforation
1994-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-03-31 Well Log Performed
2001-04-01 Perforation Treatment Performed - Jet Perforation
2001-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-15 Perforation Treatment Performed - Cement Squeeze
2010-01-15 Plug Back Performed
2010-01-15 Well Fluid changed to Crude Oil
2010-01-15 Well Log Performed
2010-01-15 Well Mode changed to Abandoned Zone
2010-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-16 Perforation Treatment Performed - Jet Perforation
2010-01-16 Plug Back Performed
2010-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-18 Perforation Treatment Performed - Remedial Casing
2010-01-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-02-19 Perforation 1441.00 1443.00 13
2001-04-01 Perforation 1307.00 1310.00 13
2001-04-05 Acid Treatment 1303.00 1310.00 0
2010-01-15 Packing Device Capped w/Cement 1400.00 1408.00 0
2010-01-15 Cement Squeeze 1419.50 1448.00 0
2010-01-16 Packing Device Capped w/Cement 1292.00 1300.00 0
2010-01-16 Perforation 252.00 253.00 17
2010-01-18 Remedial Casing Cementing 252.00 253.00 0
2010-01-18 Packing Device Capped w/Cement 248.00 250.00 0
1982-02-19 Acid Treatment 1441.00 1443.00 0
1994-12-11 Perforation 1419.50 1420.50 13
1994-12-11 Perforation 1428.00 1429.00 13
1994-12-11 Perforation 1434.00 1435.00 13
1994-12-11 Perforation 1447.00 1448.00 13
1994-12-13 Acid Treatment 1419.50 1448.00 0
2001-04-01 Perforation 1303.00 1304.00 13
2001-04-01 Perforation 1305.50 1306.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 4431 0.0 0.0 0.0
1983 7334 0.0 0.0 0.0
1984 7717 0.0 0.0 0.0
1985 7874 0.0 0.0 0.0
1986 8627 0.0 0.0 0.0
1987 8365 0.0 0.0 0.0
1988 8759 0.0 0.0 0.0
1989 8664 0.0 0.0 0.0
1990 8579 0.0 0.0 0.0
1991 8595 0.0 0.0 0.0
1992 8773 0.0 0.0 0.0
1993 8718 0.0 0.0 0.0
1994 7858 0.0 0.0 0.0
1995 8438 0.0 0.0 0.0
1996 7683 0.0 0.0 0.0
1997 8383 0.0 0.0 0.0
1998 6651 0.0 0.0 0.0
1999 8542 0.0 0.0 0.0
2000 8537 0.0 0.0 0.0
2001 7392 0.0 0.0 0.0
2002 8667 0.0 0.0 0.0
2003 6499 0.0 0.0 0.0
2005 1352 0.0 0.0 0.0

For data sources see[5]

References