X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166063302003

Well Details

Well ID: 1166063302003
Loading map...
Location: 00/02-33-116-06W6/3
Location Alias: 00/02-33-16-06 W6M
Location Alias 2: 00/02-33-116-06 W6/03
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 06
Section: 33
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 2-33-116-6
Operator Name: Paramount Resources Ltd.
License Number: 0032023
License Date: 1967-03-31
License Status: Suspension
Spud Date: 1967-04-02
Final Drill Date: 1967-04-27
Well Total Depth: 1590.80 m
Surface Hole Latitude: 59.111790
Surface Hole Longitude: -118.951370

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-03-31 Obtained License
1967-04-12 Drill Stem Test Performed
1967-04-14 Drill Stem Test Performed
1967-04-16 Drill Stem Test Performed
1967-04-20 Drill Stem Test Performed
1967-04-22 Drill Stem Test Performed
1967-04-23 Drill Stem Test Performed
1967-04-25 Drill Stem Test Performed
1967-04-26 Drill Stem Test Performed
1967-04-27 Finished Drilling
1967-04-27 Well Mode changed to Drilled and Cased
1967-04-28 Liner Casing Operation Performed
1967-05-01 Perforation Treatment Performed - Jet Perforation
1981-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-24 Perforation Treatment Performed - Cement Squeeze
1986-04-10 Perforation Treatment Performed - Jet Perforation
1986-04-11 Perforation Treatment Performed - Acid Wash - No Pressure
1988-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-06-02 Plug Back Performed
1990-03-13 Well Log Performed
1990-04-02 Perforation Treatment Performed - Jet Perforation
1993-11-06 Perforation Treatment Performed - Jet Perforation
1993-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-09 Plug Back Performed
1996-10-09 Well Log Performed
1996-10-11 Perforation Treatment Performed - Jet Perforation
1996-10-11 Well Log Performed
1996-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-30 Well Log Performed
1998-08-06 Perforation Treatment Performed - Jet Perforation
1998-08-06 Well Log Performed
1998-08-07 Perforation Treatment Performed - Jet Perforation
1998-08-07 Perforation Treatment Performed - Remedial Casing
1998-08-07 Well Log Performed
2000-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-01 Plug Back Performed
2000-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-02 Perforation Treatment Performed - Jet Perforation
2000-03-02 Well Log Performed
2000-03-03 Perforation Treatment Performed - Jet Perforation
2000-03-03 Well Log Performed
2000-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-01 Well Began Production
2000-04-01 Well Fluid changed to Gas
2000-04-01 Well Mode changed to Flowing
2004-01-18 Well Fluid changed to Gas
2004-01-18 Well Mode changed to Pumping
2005-11-26 Perforation Treatment Performed - Jet Perforation
2005-11-27 Perforation Treatment Performed - Jet Perforation
2005-11-30 Well Log Performed
2016-10-12 Well Fluid changed to Gas
2016-10-12 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-05-01 Perforation 1513.30 1516.70 13
1988-05-31 Acid Treatment 1513.00 1516.50 0
1988-06-02 Packing Device Capped w/Cement 1402.00 1410.00 0
1990-04-02 Perforation 1513.00 1516.50 13
1993-11-06 Perforation 1569.00 1572.00 13
1993-11-07 Acid Treatment 1569.00 1572.00 0
1996-10-09 Packing Device Capped w/Cement 1508.50 1511.50 0
1996-10-11 Perforation 1468.00 1471.00 13
1996-10-11 Perforation 1473.00 1476.00 13
1996-10-11 Perforation 1496.50 1498.00 13
1996-10-11 Perforation 1500.00 1506.00 13
1967-05-01 Perforation 1519.10 1521.00 13
1996-10-13 Acid Treatment 1468.00 1506.00 0
1998-08-06 Perforation 797.00 798.00 14
1998-08-07 Perforation 339.00 340.00 14
1998-08-07 Perforation 250.00 251.00 14
1998-08-07 Remedial Casing Cementing 250.00 798.00 0
2000-03-01 Packing Device Capped w/Cement 1457.00 1465.00 0
2000-03-02 Perforation 1390.50 1396.00 13
2000-03-02 Perforation 1399.60 1402.10 13
2000-03-02 Acid Treatment 1390.50 1402.10 0
2000-03-03 Perforation 1330.50 1335.00 13
1967-05-01 Perforation 1521.60 1525.80 13
2000-03-03 Perforation 1338.30 1342.30 13
2000-03-04 Acid Treatment 1330.50 1342.30 0
2005-11-26 Perforation 1468.00 1471.00 13
2005-11-26 Perforation 1473.00 1476.00 13
2005-11-26 Perforation 1496.50 1498.00 13
2005-11-26 Perforation 1500.00 1506.00 13
2005-11-27 Perforation 1513.00 1516.70 13
2005-11-27 Perforation 1533.10 1533.80 13
2005-11-27 Perforation 1540.50 1542.00 13
2005-11-27 Perforation 1569.00 1572.00 13
1967-05-01 Perforation 1533.10 1533.80 13
1967-05-01 Perforation 1540.50 1542.00 13
1981-12-11 Acid Treatment 1513.30 1525.80 0
1986-03-24 Cement Squeeze 1519.10 1525.80 0
1986-04-10 Perforation 1513.00 1516.50 13
1986-04-11 Acid Wash 1513.00 1516.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6405 0.0 0.0 0.0
2001 8457 0.0 0.0 0.0
2002 8173 0.0 0.0 0.0
2003 6157 0.0 0.0 0.0
2004 8214 0.0 0.0 0.0
2005 2832 0.0 0.0 0.0
2006 8260 0.0 0.0 0.0
2007 8644 0.0 0.0 0.0
2008 8672 0.0 0.0 0.0
2009 8115 0.0 0.0 0.0
2010 7913 0.0 0.0 0.0
2011 7220 0.0 0.0 0.0
2012 4711 0.0 0.0 0.0
2013 8658 0.0 0.0 0.0
2014 8399 0.0 0.0 0.0
2015 2760 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References