If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1166062503002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.098409,"lon":-118.869751,"icon":""}]} |
| Location: 00/03-25-116-06W6/2 | |
| Location Alias: 00/03-25-16-06 W6M | |
| Location Alias 2: 00/03-25-116-06 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 116 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 25 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL ZAMA 3-25-116-6 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0162527 | |
| License Date: 1993-11-24 | |
| License Status: Suspension | |
| Spud Date: 1995-09-24 | |
| Final Drill Date: 1995-09-27 | |
| Well Total Depth: 1558.00 m | |
| Surface Hole Latitude: 59.098409 | |
| Surface Hole Longitude: -118.869751 |
| Date | Event |
|---|---|
| 1993-11-24 | Obtained License |
| 1995-09-21 | Well Log Performed |
| 1995-09-23 | Well Log Performed |
| 1995-09-25 | Direction Drilling Operation Performed - Deviate |
| 1995-09-27 | Finished Drilling |
| 1995-09-27 | Well Mode changed to Drilled and Cased |
| 1995-09-28 | Liner Casing Operation Performed |
| 1995-09-29 | Rig Released |
| 1995-10-04 | Well Log Performed |
| 1995-10-06 | Perforation Treatment Performed - Open-Hole Completion |
| 1995-10-06 | Well Log Performed |
| 1995-10-13 | Well Began Production |
| 1995-10-13 | Well Fluid changed to Crude Oil |
| 1995-10-13 | Well Mode changed to Pumping |
| 1995-10-16 | Well Log Performed |
| 2000-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2000-10-06 | Well Fluid changed to Crude Oil |
| 2000-10-06 | Well Mode changed to Flowing |
| 2010-10-31 | Well Fluid changed to Crude Oil |
| 2010-10-31 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1995-09-25 | 1274.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1995-10-06 | Open Hole/Barefoot Completion | 1517.00 | 1558.00 | 0 |
| 2000-09-24 | Acid Treatment | 1517.00 | 1558.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1995 | 1815 | 0.0 | 0.0 | 0.0 |
| 1996 | 873 | 0.0 | 0.0 | 0.0 |
| 2000 | 1447 | 0.0 | 0.0 | 0.0 |
For data sources see[6]