If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1166062313002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.092632,"lon":-118.904336,"icon":""}]} |
| Location: 00/13-23-116-06W6/2 | |
| Location Alias: 00/13-23-16-06 W6M | |
| Location Alias 2: 00/13-23-116-06 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 116 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 23 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL ZAMA 13-23-116-6 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0032039 | |
| License Date: 1967-04-14 | |
| License Status: Amended | |
| Spud Date: 1967-04-20 | |
| Final Drill Date: 1967-05-19 | |
| Well Total Depth: 1629.50 m | |
| Surface Hole Latitude: 59.092632 | |
| Surface Hole Longitude: -118.904336 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1967-04-14 | Obtained License |
| 1967-05-01 | Drill Stem Test Performed |
| 1967-05-02 | Drill Stem Test Performed |
| 1967-05-08 | Drill Stem Test Performed |
| 1967-05-11 | Drill Stem Test Performed |
| 1967-05-12 | Liner Casing Operation Performed |
| 1967-05-16 | Drill Stem Test Performed |
| 1967-05-17 | Drill Stem Test Performed |
| 1967-05-19 | Drill Stem Test Performed |
| 1967-05-19 | Finished Drilling |
| 1967-05-19 | Well Mode changed to Drilled and Cased |
| 1967-05-21 | Perforation Treatment Performed - Open-Hole Completion |
| 1967-06-15 | Perforation Treatment Performed - Cement Squeeze |
| 1967-06-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1967-06-16 | Perforation Treatment Performed - Jet Perforation |
| 1967-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1967-06-22 | Perforation Treatment Performed - Visqueeze |
| 1967-06-29 | Perforation Treatment Performed - Cement Squeeze |
| 1967-07-04 | Perforation Treatment Performed - Jet Perforation |
| 1967-07-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1968-07-19 | Perforation Treatment Performed - Jet Perforation |
| 1968-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-05-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1976-05-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-05-14 | Perforation Treatment Performed - Jet Perforation |
| 1977-03-01 | Well Began Production |
| 1977-03-01 | Well Fluid changed to Gas |
| 1977-03-01 | Well Mode changed to Flowing |
| 1980-01-01 | Well Fluid changed to Gas |
| 1980-01-01 | Well Mode changed to Suspended |
| 1996-06-21 | Perforation Treatment Performed - Jet Perforation |
| 1996-06-25 | Perforation Treatment Performed - Cement Squeeze |
| 1996-06-25 | Tie-Back Casing Operation Performed |
| 1996-06-25 | Well Fluid changed to Gas |
| 1996-06-25 | Well Mode changed to Abandoned Zone |
| 1996-06-27 | Well Log Performed |
| 1996-06-28 | Well Log Performed |
| 1996-06-29 | Perforation Treatment Performed - Jet Perforation |
| 1996-06-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-11-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-11-23 | Plug Back Performed |
| 2001-11-24 | Well Abandoned |
| 2005-01-20 | Well Log Performed |
| 2005-01-26 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1967-05-21 | Open Hole/Barefoot Completion | 1523.70 | 1581.30 | 0 |
| 1967-07-04 | Perforation | 1572.20 | 1574.00 | 13 |
| 1967-07-05 | Acid Treatment | 1572.20 | 1574.00 | 0 |
| 1968-07-19 | Perforation | 1539.20 | 1543.20 | 13 |
| 1968-07-19 | Perforation | 1545.90 | 1547.20 | 13 |
| 1968-07-21 | Acid Treatment | 1539.20 | 1547.20 | 0 |
| 1976-05-13 | Packing Device Capped w/Cement | 1424.90 | 1432.60 | 0 |
| 1976-05-14 | Perforation | 1323.40 | 1325.60 | 7 |
| 1976-05-14 | Perforation | 1331.10 | 1332.30 | 7 |
| 1976-05-14 | Perforation | 1341.70 | 1342.90 | 7 |
| 1976-05-14 | Acid Treatment | 1323.40 | 1342.90 | 0 |
| 1967-06-15 | Cement Squeeze | 1523.70 | 1581.30 | 0 |
| 1976-05-14 | Perforation | 1378.00 | 1378.60 | 7 |
| 1976-05-14 | Perforation | 1380.70 | 1384.40 | 7 |
| 1976-05-14 | Perforation | 1390.50 | 1396.60 | 7 |
| 1996-06-21 | Perforation | 1539.20 | 1543.20 | 13 |
| 1996-06-21 | Perforation | 1545.90 | 1547.20 | 13 |
| 1996-06-21 | Perforation | 1572.20 | 1574.00 | 13 |
| 1996-06-25 | Cement Squeeze | 1323.40 | 1396.60 | 0 |
| 1996-06-29 | Perforation | 1539.20 | 1542.90 | 13 |
| 1996-06-29 | Perforation | 1545.90 | 1546.90 | 13 |
| 1996-06-29 | Perforation | 1561.20 | 1564.80 | 13 |
| 1967-06-16 | Perforation | 1571.50 | 1574.00 | 13 |
| 1996-06-29 | Perforation | 1572.20 | 1574.00 | 13 |
| 1996-06-30 | Acid Treatment | 1539.20 | 1574.00 | 0 |
| 2001-11-23 | Packing Device Capped w/Cement | 1521.00 | 1529.00 | 0 |
| 1967-06-16 | Perforation | 1575.80 | 1578.30 | 13 |
| 1967-06-16 | Perforation | 1579.20 | 1580.70 | 13 |
| 1967-06-16 | Acid Treatment | 1571.50 | 1580.70 | 0 |
| 1967-06-17 | Acid Treatment | 1571.50 | 1580.70 | 0 |
| 1967-06-22 | Visqueeze | 1571.50 | 1580.70 | 0 |
| 1967-06-29 | Cement Squeeze | 1571.50 | 1580.70 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1977 | 4036 | 0.0 | 0.0 | 0.0 |
| 1978 | 6604 | 0.0 | 0.0 | 0.0 |
| 1979 | 2883 | 0.0 | 0.0 | 0.0 |
For data sources see[5]