If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1166061911002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.091145,"lon":-119.013974,"icon":""}]} |
| Location: 00/11-19-116-06W6/2 | |
| Location Alias: 00/11-19-16-06 W6M | |
| Location Alias 2: 00/11-19-116-06 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 116 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 19 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL AMBER 11-19-116-6 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0107749 | |
| License Date: 1984-06-19 | |
| License Status: Abandoned | |
| Spud Date: 1984-07-30 | |
| Final Drill Date: 1984-08-28 | |
| Well Total Depth: 1625.00 m | |
| Surface Hole Latitude: 59.091145 | |
| Surface Hole Longitude: -119.013974 |
| Date | Event |
|---|---|
| 1984-06-19 | Obtained License |
| 1984-08-02 | Surface Casing Operation Performed |
| 1984-08-04 | Lost Circulation Occurred |
| 1984-08-16 | Drill Stem Test Performed |
| 1984-08-16 | Lost Circulation Occurred |
| 1984-08-18 | Drill Stem Test Performed |
| 1984-08-20 | Lost Circulation Occurred |
| 1984-08-21 | Drill Stem Test Performed |
| 1984-08-23 | Drill Stem Test Performed |
| 1984-08-25 | Drill Stem Test Performed |
| 1984-08-26 | Lost Circulation Occurred |
| 1984-08-27 | Drill Stem Test Performed |
| 1984-08-28 | Drill Stem Test Performed |
| 1984-08-28 | Finished Drilling |
| 1984-08-28 | Well Log Performed |
| 1984-08-28 | Well Mode changed to Drilled and Cased |
| 1984-08-29 | Well Log Performed |
| 1984-08-31 | Drill Stem Test Performed |
| 1984-09-01 | Production Casing Operation Performed |
| 1984-09-02 | Rig Released |
| 1984-12-11 | Well Log Performed |
| 1984-12-12 | Perforation Treatment Performed - Jet Perforation |
| 1984-12-12 | Well Log Performed |
| 1985-02-19 | Well Log Performed |
| 1985-02-23 | Well Log Performed |
| 1988-02-12 | Well Log Performed |
| 1988-02-14 | Perforation Treatment Performed - Jet Perforation |
| 1993-10-15 | Perforation Treatment Performed - Jet Perforation |
| 1993-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-04-15 | Perforation Treatment Performed - Jet Perforation |
| 1995-04-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-01-23 | Perforation Treatment Performed - Jet Perforation |
| 1997-01-23 | Well Log Performed |
| 1997-01-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-01-29 | Well Log Performed |
| 1997-01-31 | Perforation Treatment Performed - Cement Squeeze |
| 1997-02-03 | Well Log Performed |
| 2001-05-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-05-07 | Plug Back Performed |
| 2001-05-08 | Perforation Treatment Performed - Jet Perforation |
| 2001-05-08 | Well Log Performed |
| 2001-05-08 | Well Mode changed to Drilled and Cased |
| 2001-05-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-05-10 | Perforation Treatment Performed - Jet Perforation |
| 2001-05-10 | Well Log Performed |
| 2001-05-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2002-02-05 | Well Began Production |
| 2002-02-05 | Well Fluid changed to Gas |
| 2002-02-05 | Well Mode changed to Flowing |
| 2004-06-15 | Well Log Performed |
| 2004-06-17 | Perforation Treatment Performed - Cement Squeeze |
| 2004-06-20 | Well Log Performed |
| 2004-06-21 | Perforation Treatment Performed - Jet Perforation |
| 2004-06-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2009-03-03 | Well Log Performed |
| 2009-03-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-03-24 | Plug Back Performed |
| 2009-03-24 | Well Fluid changed to Gas |
| 2009-03-24 | Well Mode changed to Abandoned Zone |
| 2009-04-02 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1984-12-12 | Perforation | 1597.00 | 1599.00 | 13 |
| 1997-01-23 | Perforation | 1553.00 | 1558.00 | 13 |
| 1997-01-23 | Perforation | 1531.50 | 1539.00 | 13 |
| 1997-01-25 | Acid Treatment | 1531.50 | 1570.00 | 0 |
| 1997-01-31 | Cement Squeeze | 1563.00 | 1570.00 | 0 |
| 2001-05-07 | Packing Device Capped w/Cement | 1517.00 | 1525.00 | 0 |
| 2001-05-08 | Perforation | 1408.50 | 1411.00 | 14 |
| 2001-05-08 | Perforation | 1415.00 | 1417.00 | 14 |
| 2001-05-08 | Perforation | 1418.50 | 1420.00 | 14 |
| 2001-05-09 | Acid Treatment | 1408.50 | 1420.00 | 0 |
| 2001-05-10 | Perforation | 1345.00 | 1348.00 | 14 |
| 1988-02-14 | Perforation | 1592.00 | 1594.00 | 13 |
| 2001-05-10 | Perforation | 1360.00 | 1363.00 | 14 |
| 2001-05-10 | Perforation | 1369.00 | 1373.50 | 14 |
| 2001-05-11 | Acid Treatment | 1345.00 | 1373.00 | 0 |
| 2004-06-17 | Cement Squeeze | 1408.50 | 1420.00 | 0 |
| 2004-06-21 | Perforation | 1408.50 | 1411.00 | 13 |
| 2004-06-22 | Acid Treatment | 1408.50 | 1411.00 | 0 |
| 2009-03-24 | Packing Device Capped w/Cement | 1392.00 | 1400.00 | 0 |
| 2009-03-24 | Packing Device Capped w/Cement | 1329.00 | 1337.00 | 0 |
| 1993-10-15 | Perforation | 1579.00 | 1581.00 | 13 |
| 1993-10-16 | Acid Treatment | 1579.00 | 1581.00 | 0 |
| 1995-04-15 | Perforation | 1529.00 | 1530.00 | 13 |
| 1995-04-15 | Perforation | 1536.00 | 1537.00 | 13 |
| 1995-04-16 | Acid Treatment | 1529.00 | 1537.00 | 0 |
| 1997-01-23 | Perforation | 1567.00 | 1570.00 | 13 |
| 1997-01-23 | Perforation | 1563.00 | 1566.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2002 | 152 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1984-08-04 | Lost Circulation | 695.00 | 823.00 |
| 1984-08-16 | Lost Circulation | 1535.00 | 1535.00 |
| 1984-08-20 | Lost Circulation | 1545.00 | 1545.00 |
| 1984-08-26 | Lost Circulation | 1605.00 | 1625.00 |
For data sources see[6]