X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166061505023

Well Details

Well ID: 1166061505023
Loading map...
Location: 02/05-15-116-06W6/3
Location Alias: 02/05-15-16-06 W6M
Location Alias 2: 02/05-15-116-06 W6/03
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 06
Section: 15
County/Municipality: Mackenzie County
Well Name: ACL 102 ZAMA 5-15-116-6
Operator Name: Paramount Resources Ltd.
License Number: 0112876
License Date: 1985-01-28
License Status: Suspension
Spud Date: 1985-02-04
Final Drill Date: 1985-03-06
Well Total Depth: 1561.00 m
Surface Hole Latitude: 59.071370
Surface Hole Longitude: -118.933104

For data sources see[1][2]

Well History

Date Event
1985-01-28 Obtained License
1985-02-06 Surface Casing Operation Performed
1985-02-16 Lost Circulation Occurred
1985-02-20 Lost Circulation Occurred
1985-02-22 Well Log Performed
1985-03-01 Intermediate Casing Operation Performed
1985-03-06 Finished Drilling
1985-03-06 Lost Circulation Occurred
1985-03-06 Well Mode changed to Drilled and Cased
1985-03-07 Well Log Performed
1985-03-08 Drill Stem Test Performed
1985-03-09 Liner Casing Operation Performed
1985-03-09 Rig Released
1985-03-21 Well Log Performed
1985-03-22 Perforation Treatment Performed - Jet Perforation
1985-03-22 Well Log Performed
1985-03-26 Perforation Treatment Performed - Jet Perforation
1997-12-03 Well Log Performed
1997-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-05 Perforation Treatment Performed - Jet Perforation
1997-12-05 Plug Back Performed
1997-12-05 Well Log Performed
1997-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-09 Well Log Performed
2003-07-29 Well Log Performed
2003-08-01 Well Log Performed
2003-08-02 Perforation Treatment Performed - Jet Perforation
2003-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-11 Well Began Production
2003-08-11 Well Fluid changed to Gas
2003-08-11 Well Mode changed to Flowing
2003-09-01 Well Fluid changed to Gas
2003-09-01 Well Mode changed to Pumping
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Suspended
2013-09-25 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-22 Perforation 1526.00 1527.50 13
2003-08-02 Perforation 1333.00 1335.00 13
2003-08-02 Perforation 1338.50 1339.50 13
2003-08-02 Perforation 1355.50 1357.50 13
2003-08-03 Acid Treatment 1330.00 1357.50 0
1985-03-26 Perforation 1518.50 1522.50 13
1997-12-05 Packing Device Capped w/Cement 1497.00 1505.00 0
1997-12-05 Perforation 1393.00 1395.00 14
1997-12-05 Perforation 1396.50 1398.00 14
1997-12-05 Perforation 1399.00 1401.00 14
1997-12-05 Perforation 1403.50 1407.00 14
1997-12-06 Acid Treatment 1393.00 1407.00 0
2003-08-02 Perforation 1330.00 1331.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 2196 0.0 0.0 0.0
2004 2498 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-02-16 Lost Circulation 1058.00 1058.00
1985-02-20 Lost Circulation 1414.00 1414.00
1985-03-06 Lost Circulation 1561.00 1561.00
2013-09-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References