If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1166061004023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.054553,"lon":-118.932784,"icon":""}]} |
| Location: 02/04-10-116-06W6/3 | |
| Location Alias: 02/04-10-16-06 W6M | |
| Location Alias 2: 02/04-10-116-06 W6/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 116 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 10 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL 02 ZAMA 4-10-116-6 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0221565 | |
| License Date: 1999-02-16 | |
| License Status: Suspension | |
| Spud Date: 1999-02-17 | |
| Final Drill Date: 1999-02-28 | |
| Well Total Depth: 1523.00 m | |
| Surface Hole Latitude: 59.054553 | |
| Surface Hole Longitude: -118.932784 |
| Date | Event |
|---|---|
| 1999-02-16 | Obtained License |
| 1999-02-18 | Surface Casing Operation Performed |
| 1999-02-20 | Direction Drilling Operation Performed - Deviate |
| 1999-02-24 | Well Log Performed |
| 1999-02-25 | Production Casing Operation Performed |
| 1999-02-28 | Finished Drilling |
| 1999-02-28 | Perforation Treatment Performed - Open-Hole Completion |
| 1999-02-28 | Well Log Performed |
| 1999-02-28 | Well Mode changed to Drilled and Cased |
| 1999-03-01 | Rig Released |
| 1999-03-01 | Well Log Performed |
| 1999-03-10 | Well Log Performed |
| 1999-03-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1999-03-13 | Perforation Treatment Performed - Jet Perforation |
| 1999-03-13 | Plug Back Performed |
| 1999-03-13 | Well Log Performed |
| 1999-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-04-30 | Well Log Performed |
| 2004-03-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-03-21 | Perforation Treatment Performed - Jet Perforation |
| 2004-03-21 | Plug Back Performed |
| 2004-03-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2004-03-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2004-03-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-03-27 | Plug Back Performed |
| 2006-08-29 | Perforation Treatment Performed - Jet Perforation |
| 2006-08-30 | Perforation Treatment Performed - Cement Squeeze |
| 2006-09-07 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1999-02-20 | 570.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1999-02-28 | Open Hole/Barefoot Completion | 1481.00 | 1523.00 | 0 |
| 2004-03-22 | Acid Treatment | 1328.00 | 1331.50 | 0 |
| 2004-03-25 | Acid Treatment | 1328.00 | 1346.00 | 0 |
| 2004-03-27 | Packing Device Capped w/Cement | 1312.00 | 1320.00 | 0 |
| 2006-08-29 | Perforation | 1395.00 | 1396.00 | 13 |
| 2006-08-29 | Perforation | 1403.50 | 1407.00 | 13 |
| 2006-08-29 | Perforation | 1328.00 | 1331.00 | 13 |
| 2006-08-29 | Perforation | 1343.00 | 1344.00 | 13 |
| 2006-08-29 | Perforation | 1345.00 | 1346.00 | 13 |
| 2006-08-30 | Cement Squeeze | 1395.00 | 1407.00 | 0 |
| 2006-08-30 | Cement Squeeze | 1328.00 | 1346.00 | 0 |
| 1999-03-13 | Packing Device Capped w/Cement | 1450.00 | 1458.00 | 0 |
| 2006-09-07 | Open Hole/Barefoot Completion | 1481.00 | 1523.00 | 0 |
| 1999-03-13 | Perforation | 1395.00 | 1396.00 | 13 |
| 1999-03-13 | Perforation | 1403.50 | 1407.00 | 13 |
| 1999-03-14 | Acid Treatment | 1395.00 | 1407.00 | 0 |
| 2004-03-21 | Packing Device Capped w/Cement | 1382.00 | 1390.00 | 0 |
| 2004-03-21 | Perforation | 1328.00 | 1331.50 | 13 |
| 2004-03-21 | Perforation | 1343.00 | 1344.00 | 13 |
| 2004-03-21 | Perforation | 1345.00 | 1346.00 | 13 |
For data sources see[5]