X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166052508002

Well Details

Well ID: 1166052508002
Loading map...
Location: 00/08-25-116-05W6/2
Location Alias: 00/08-25-16-05 W6M
Location Alias 2: 00/08-25-116-05 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 05
Section: 25
County/Municipality: Mackenzie County
Well Name: ACL ET AL ZAMA 8-25-116-5
Operator Name: Paramount Resources Ltd.
License Number: 0031865
License Date: 1967-02-27
License Status: Issued
Spud Date: 1967-02-27
Final Drill Date: 1967-03-30
Well Total Depth: 1630.70 m
Surface Hole Latitude: 59.100324
Surface Hole Longitude: -118.688985

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-02-27 Obtained License
1967-03-12 Well Log Performed
1967-03-13 Drill Stem Test Performed
1967-03-26 Drill Stem Test Performed
1967-03-30 Drill Stem Test Performed
1967-03-30 Finished Drilling
1967-03-30 Well Log Performed
1967-03-30 Well Mode changed to Drilled and Cased
1967-03-31 Drill Stem Test Performed
1967-04-01 Drill Stem Test Performed
1967-04-02 Drill Stem Test Performed
1967-04-03 Drill Stem Test Performed
1967-04-04 Liner Casing Operation Performed
1967-04-06 Perforation Treatment Performed - Cement Squeeze
1967-04-06 Perforation Treatment Performed - Jet Perforation
1967-04-07 Perforation Treatment Performed - Jet Perforation
1967-04-10 Perforation Treatment Performed - Cement Squeeze
1967-04-11 Perforation Treatment Performed - Jet Perforation
1967-04-13 Perforation Treatment Performed - Cement Squeeze
1967-04-16 Perforation Treatment Performed - Jet Perforation
1967-04-21 Perforation Treatment Performed - Jet Perforation
1967-04-21 Well Began Production
1967-04-21 Well Fluid changed to Crude Oil
1967-04-21 Well Mode changed to Flowing
1967-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-11-10 Well Fluid changed to Crude Oil
1967-11-10 Well Mode changed to Pumping
2000-01-11 Well Log Performed
2000-01-16 Well Log Performed
2000-01-21 Well Log Performed
2000-01-22 Perforation Treatment Performed - Jet Perforation
2000-01-22 Well Log Performed
2000-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-26 Well Log Performed
2000-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-31 Well Log Performed
2000-02-01 Perforation Treatment Performed - Jet Perforation
2000-02-06 Perforation Treatment Performed - Remedial Casing
2000-02-06 Well Log Performed
2016-07-10 Well Fluid changed to Crude Oil
2016-07-10 Well Mode changed to Suspended
2017-02-20 Well Fluid changed to Crude Oil
2017-02-20 Well Mode changed to Pumping
2019-09-30 Well Fluid changed to Crude Oil
2019-09-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-04-06 Perforation 1509.40 1510.60 7
1967-04-22 Acid Treatment 1466.10 1477.70 0
2000-01-22 Perforation 1325.90 1332.00 13
2000-01-22 Perforation 1341.70 1349.70 13
2000-01-22 Perforation 1447.20 1448.40 13
2000-01-22 Perforation 1449.60 1453.90 13
2000-01-22 Perforation 1457.00 1460.00 13
2000-01-23 Acid Treatment 1466.10 1477.00 0
2000-01-24 Acid Treatment 1447.20 1460.00 0
2000-01-27 Acid Treatment 1325.90 1349.70 0
2000-02-01 Perforation 584.00 584.50 13
1967-04-06 Cement Squeeze 1509.40 1510.60 0
2000-02-01 Perforation 584.20 584.50 24
2000-02-06 Remedial Casing Cementing 584.00 584.50 0
1967-04-07 Perforation 1496.30 1499.60 7
1967-04-10 Cement Squeeze 1496.30 1499.60 0
1967-04-11 Perforation 1487.40 1491.40 7
1967-04-13 Cement Squeeze 1487.40 1491.40 0
1967-04-16 Perforation 1335.00 1341.70 7
1967-04-21 Perforation 1466.10 1469.70 7
1967-04-21 Perforation 1474.60 1477.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 378 0.0 0.0 0.0
1968 3664 0.0 0.0 0.0
1969 4095 0.0 0.0 0.0
1970 1711 0.0 0.0 0.0
1971 1357 0.0 0.0 0.0
1972 3238 0.0 0.0 0.0
1973 5005 0.0 0.0 0.0
1974 4610 0.0 0.0 0.0
1975 4627 0.0 0.0 0.0
1976 3940 0.0 0.0 0.0
1977 3746 0.0 0.0 0.0
1978 5925 0.0 0.0 0.0
1979 7617 0.0 0.0 0.0
1980 7773 0.0 0.0 0.0
1981 7185 0.0 0.0 0.0
1982 8546 0.0 0.0 0.0
1983 8068 0.0 0.0 0.0
1984 8334 0.0 0.0 0.0
1985 7992 0.0 0.0 0.0
1986 8686 0.0 0.0 0.0
1987 8443 0.0 0.0 0.0
1988 8617 0.0 0.0 0.0
1989 8619 0.0 0.0 0.0
1990 8413 0.0 0.0 0.0
1991 8619 0.0 0.0 0.0
1992 8159 0.0 0.0 0.0
1993 7872 0.0 0.0 0.0
1994 7097 0.0 0.0 0.0
1995 7936 0.0 0.0 0.0
1996 8723 0.0 0.0 0.0
1997 4554 0.0 0.0 0.0
2000 6078 0.0 0.0 0.0
2001 4726 0.0 0.0 0.0
2002 8438 0.0 0.0 0.0
2003 8581 0.0 0.0 0.0
2004 8702 0.0 0.0 0.0
2005 8634 0.0 0.0 0.0
2006 8661 0.0 0.0 0.0
2007 8549 0.0 0.0 0.0
2008 8667 0.0 0.0 0.0
2009 8183 0.0 0.0 0.0
2010 8453 0.0 0.0 0.0
2011 5467 0.0 0.0 0.0
2012 7887 0.0 0.0 0.0
2013 8590 0.0 0.0 0.0
2014 7357 0.0 0.0 0.0
2015 1248 0.0 0.0 0.0
2017 6323 0.0 0.0 0.0
2018 7207 0.0 0.0 0.0
2019 1840 0.0 0.0 0.0

For data sources see[5]

References