X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166051104003

Well Details

Well ID: 1166051104003
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 00/04-11-116-05W6/3
Location Alias: 00/04-11-16-05 W6M
Location Alias 2: 00/04-11-116-05 W6/03
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 05
Section: 11
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 4-11-116-5
Operator Name: Paramount Resources Ltd.
License Number: 0031439
License Date: 1966-12-13
License Status: Abandoned
Spud Date: 1966-12-19
Final Drill Date: 1967-02-02
Well Total Depth: 1640.40 m
Surface Hole Latitude: 59.054544
Surface Hole Longitude: -118.733207

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-12-13 Obtained License
1967-01-04 Drill Stem Test Performed
1967-01-10 Drill Stem Test Performed
1967-01-18 Drill Stem Test Performed
1967-01-20 Drill Stem Test Performed
1967-01-22 Drill Stem Test Performed
1967-01-23 Drill Stem Test Performed
1967-01-24 Drill Stem Test Performed
1967-01-26 Drill Stem Test Performed
1967-02-02 Finished Drilling
1967-02-04 Liner Casing Operation Performed
1967-02-07 Well Log Performed
1967-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-02-10 Perforation Treatment Performed - Jet Perforation
1972-12-15 Perforation Treatment Performed - Jet Perforation
1979-08-07 Perforation Treatment Performed - Jet Perforation
1979-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-10 Perforation Treatment Performed - Jet Perforation
1980-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-14 Well Mode changed to Drilled and Cased
1981-06-04 Perforation Treatment Performed - Jet Perforation
1981-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-11-08 Well Began Production
1981-11-08 Well Fluid changed to Gas
1981-11-08 Well Mode changed to Flowing
1986-11-06 Well Fluid changed to Gas
1986-11-06 Well Mode changed to Suspended
1988-03-04 Well Fluid changed to Gas
1988-03-04 Well Mode changed to Flowing
1990-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-08 Plug Back Performed
1990-09-08 Well Abandoned
1990-09-08 Well Fluid changed to Gas
1990-09-08 Well Log Performed
1990-09-08 Well Mode changed to Abandoned
1990-09-09 Perforation Treatment Performed - Jet Perforation
1990-09-09 Well Log Performed
1990-09-10 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-02-10 Perforation 1448.10 1448.70 13
1967-02-10 Perforation 1468.80 1470.10 13
1967-02-10 Perforation 1478.60 1479.20 13
1967-02-10 Perforation 1480.40 1481.30 13
1967-02-10 Acid Treatment 1448.10 1481.30 0
1972-12-15 Perforation 1553.90 1558.40 13
1979-08-07 Perforation 1504.80 1510.30 7
1979-08-07 Perforation 1498.40 1501.70 7
1979-08-08 Acid Treatment 1498.40 1510.30 0
1979-08-10 Acid Treatment 1498.40 1510.30 0
1980-04-10 Packing Device Capped w/Cement 1416.70 1425.00 0
1967-02-10 Perforation 1449.60 1450.20 13
1980-04-10 Perforation 1328.90 1330.10 7
1980-04-10 Perforation 1326.40 1328.30 7
1980-04-10 Perforation 1323.70 1325.20 7
1980-04-12 Acid Treatment 1323.70 1330.10 0
1981-06-04 Perforation 1265.50 1269.70 7
1981-06-04 Perforation 1273.00 1279.50 7
1981-06-10 Acid Treatment 1265.50 1279.50 0
1990-09-08 Packing Device Capped w/Cement 1290.00 1310.00 0
1990-09-08 Packing Device Capped w/Cement 1252.00 1260.00 0
1990-09-09 Perforation 276.00 276.20 7
1967-02-10 Perforation 1451.80 1452.70 13
1990-09-10 Remedial Casing Cementing 276.00 276.20 0
1967-02-10 Perforation 1454.80 1455.40 13
1967-02-10 Perforation 1456.90 1457.90 13
1967-02-10 Perforation 1458.80 1459.40 13
1967-02-10 Perforation 1460.00 1460.60 13
1967-02-10 Perforation 1461.80 1463.00 13
1967-02-10 Perforation 1465.20 1466.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 390 0.0 0.0 0.0
1982 2255 0.0 0.0 0.0
1983 1879 0.0 0.0 0.0
1984 192 0.0 0.0 0.0
1985 825 0.0 0.0 0.0
1988 575 0.0 0.0 0.0
1989 600 0.0 0.0 0.0

For data sources see[5]

References

BESbswy