If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1166051010002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.060513,"lon":-118.752714,"icon":""}]} |
| Location: 00/10-10-116-05W6/2 | |
| Location Alias: 00/10-10-16-05 W6M | |
| Location Alias 2: 00/10-10-116-05 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 116 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 10 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL ZAMA 10-10-116-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0031813 | |
| License Date: 1967-02-21 | |
| License Status: Issued | |
| Spud Date: 1967-02-23 | |
| Final Drill Date: 1967-03-26 | |
| Well Total Depth: 1642.90 m | |
| Surface Hole Latitude: 59.060513 | |
| Surface Hole Longitude: -118.752714 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1967-02-21 | Obtained License |
| 1967-03-04 | Drill Stem Test Performed |
| 1967-03-06 | Drill Stem Test Performed |
| 1967-03-16 | Drill Stem Test Performed |
| 1967-03-17 | Drill Stem Test Performed |
| 1967-03-21 | Drill Stem Test Performed |
| 1967-03-26 | Finished Drilling |
| 1967-03-26 | Well Mode changed to Drilled and Cased |
| 1967-03-28 | Drill Stem Test Performed |
| 1967-03-30 | Drill Stem Test Performed |
| 1967-03-31 | Liner Casing Operation Performed |
| 1967-04-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1967-04-03 | Perforation Treatment Performed - Jet Perforation |
| 1967-04-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1967-08-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1967-08-20 | Perforation Treatment Performed - Jet Perforation |
| 1967-08-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1986-11-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1989-04-04 | Perforation Treatment Performed - Cement Squeeze |
| 1989-04-12 | Perforation Treatment Performed - Jet Perforation |
| 2003-06-28 | Perforation Treatment Performed - Jet Perforation |
| 2003-07-01 | Well Log Performed |
| 2003-07-06 | Perforation Treatment Performed - Jet Perforation |
| 2003-07-06 | Well Log Performed |
| 2003-07-07 | Liner Casing Operation Performed |
| 2003-07-07 | Perforation Treatment Performed - Cement Squeeze |
| 2003-07-07 | Plug Back Performed |
| 2003-07-09 | Well Log Performed |
| 2003-07-10 | Well Log Performed |
| 2003-07-11 | Perforation Treatment Performed - Jet Perforation |
| 2003-07-11 | Well Log Performed |
| 2003-07-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-07-12 | Perforation Treatment Performed - Jet Perforation |
| 2003-07-12 | Well Log Performed |
| 2003-07-16 | Well Log Performed |
| 2003-07-19 | Well Log Performed |
| 2004-03-29 | Well Began Injection |
| 2004-03-29 | Well Fluid changed to Water |
| 2004-03-29 | Well Type changed to Injection |
| 2019-07-31 | Well Fluid changed to Water |
| 2019-07-31 | Well Mode changed to Suspended |
| 2019-07-31 | Well Type changed to Injection |
| 2019-12-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-12-19 | Plug Back Performed |
| 2019-12-19 | Well Fluid changed to Water |
| 2019-12-19 | Well Mode changed to Abandoned Zone |
| 2019-12-19 | Well Type changed to Injection |
| 2020-01-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2020-01-04 | Plug Back Performed |
| 2020-01-05 | Perforation Treatment Performed - Cement Plug |
| 2020-01-05 | Plug Back Performed |
| 2020-01-07 | Perforation Treatment Performed - Jet Perforation |
| 2020-01-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2020-01-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2020-01-08 | Perforation Treatment Performed - Jet Perforation |
| 2020-01-08 | Plug Back Performed |
| 2020-01-09 | Perforation Treatment Performed - Cement Plug |
| 2020-01-09 | Perforation Treatment Performed - Cement Squeeze |
| 2020-01-09 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1967-04-03 | Perforation | 1497.80 | 1499.00 | 13 |
| 1986-11-26 | Acid Treatment | 1283.20 | 1285.00 | 0 |
| 1989-04-04 | Cement Squeeze | 1283.20 | 1285.00 | 0 |
| 1989-04-12 | Perforation | 1292.00 | 1297.00 | 13 |
| 2003-06-28 | Perforation | 1497.80 | 1499.00 | 13 |
| 2003-06-28 | Perforation | 1501.70 | 1503.90 | 13 |
| 2003-06-28 | Perforation | 1509.40 | 1512.40 | 13 |
| 2003-06-28 | Perforation | 1516.40 | 1517.30 | 13 |
| 2003-07-06 | Perforation | 1331.70 | 1333.70 | 14 |
| 2003-07-06 | Perforation | 1090.00 | 1091.00 | 14 |
| 2003-07-07 | Cement Squeeze | 1090.00 | 1333.70 | 0 |
| 1967-04-03 | Perforation | 1501.70 | 1503.90 | 13 |
| 2003-07-11 | Perforation | 1573.70 | 1575.70 | 13 |
| 2003-07-12 | Perforation | 1569.70 | 1573.70 | 13 |
| 2003-07-12 | Acid Treatment | 1569.70 | 1573.70 | 0 |
| 2019-12-19 | Packing Device Capped w/Cement | 1552.00 | 1560.00 | 0 |
| 2020-01-04 | Packing Device Capped w/Cement | 1481.00 | 1489.00 | 0 |
| 2020-01-05 | Cement Plug | 1089.60 | 1376.00 | 0 |
| 2020-01-05 | Cement Plug | 981.00 | 1089.60 | 0 |
| 2020-01-07 | Perforation | 631.00 | 632.00 | 20 |
| 2020-01-07 | Perforation | 631.00 | 632.00 | 99 |
| 2020-01-08 | Packing Device Capped w/Cement | 617.00 | 625.00 | 0 |
| 1967-04-03 | Perforation | 1509.40 | 1512.40 | 13 |
| 2020-01-08 | Perforation | 285.00 | 286.00 | 20 |
| 2020-01-08 | Acid Treatment | 631.00 | 632.00 | 0 |
| 2020-01-09 | Cement Squeeze | 285.00 | 286.00 | 0 |
| 2020-01-09 | Cement Plug | 270.00 | 280.00 | 0 |
| 1967-04-03 | Perforation | 1516.40 | 1517.30 | 13 |
| 1967-04-03 | Acid Treatment | 1497.80 | 1517.30 | 0 |
| 1967-04-12 | Acid Treatment | 1497.80 | 1517.30 | 0 |
| 1967-08-09 | Packing Device Capped w/Cement | 1350.60 | 1350.60 | 0 |
| 1967-08-20 | Perforation | 1283.20 | 1285.00 | 13 |
| 1967-08-21 | Acid Treatment | 1283.20 | 1285.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 0 | 0.0 | 0.0 | 0.0 |
| 2005 | 0 | 0.0 | 0.0 | 0.0 |
| 2006 | 0 | 0.0 | 0.0 | 0.0 |
| 2007 | 0 | 0.0 | 0.0 | 0.0 |
| 2008 | 0 | 0.0 | 0.0 | 0.0 |
| 2009 | 0 | 0.0 | 0.0 | 0.0 |
| 2011 | 0 | 0.0 | 0.0 | 0.0 |
| 2012 | 0 | 0.0 | 0.0 | 0.0 |
| 2013 | 0 | 0.0 | 0.0 | 0.0 |
| 2014 | 0 | 0.0 | 0.0 | 0.0 |
| 2015 | 0 | 0.0 | 0.0 | 0.0 |
| 2016 | 0 | 0.0 | 0.0 | 0.0 |
| 2017 | 0 | 0.0 | 0.0 | 0.0 |
| 2018 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2020-01-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]