Well Details

Well ID: 1166050804000
Loading map...
Location: 00/04-08-116-05W6/0
Location Alias: 00/04-08-16-05 W6M
Location Alias 2: 00/04-08-116-05 W6/00
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 05
Section: 08
County/Municipality: Mackenzie County
Well Name: PPRL ZAMA (100) 04-08-116-05W6/00
Operator Name: Phillips Petroleum Resources, Ltd.
License Number: 0043381
License Date: 1972-08-25
License Status: Re-Entered
Spud Date: 1972-09-03
Final Drill Date: 1972-09-21
Well Total Depth: 1559.40 m
Surface Hole Latitude: 59.055680
Surface Hole Longitude: -118.824110

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-08-25 Obtained License
1972-09-16 Drill Stem Test Performed
1972-09-18 Production Casing Operation Performed
1972-09-21 Drill Stem Test Performed
1972-09-21 Finished Drilling
1972-09-21 Perforation Treatment Performed - Open-Hole Completion
1972-09-21 Well Mode changed to Drilled and Cased
1972-10-22 Well Began Production
1972-10-22 Well Fluid changed to Crude Oil
1972-10-22 Well Mode changed to Pumping
1996-03-07 Well Log Performed
1996-03-08 Well Log Performed
1996-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-09 Plug Back Performed
1996-03-11 Well Log Performed
1996-03-12 Perforation Treatment Performed - Jet Perforation
1996-03-13 Perforation Treatment Performed - Remedial Casing
1996-03-14 Perforation Treatment Performed - Cement Plug
1996-03-14 Well Log Performed
1996-03-15 Well Log Performed
1996-03-16 Perforation Treatment Performed - Jet Perforation
1996-03-17 Perforation Treatment Performed - Cement Plug
1996-03-17 Perforation Treatment Performed - Remedial Casing
1996-03-17 Well Abandoned
1996-03-17 Well Fluid changed to Crude Oil
1996-03-17 Well Mode changed to Abandoned and Re-entered
2003-12-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-09-21 Open Hole/Barefoot Completion 1477.70 1559.40 0
1996-03-09 Packing Device Capped w/Cement 1452.00 1460.00 0
1996-03-12 Perforation 700.00 701.00 13
1996-03-13 Remedial Casing Cementing 700.00 701.00 0
1996-03-14 Cement Plug 673.00 704.00 0
1996-03-16 Perforation 275.00 276.00 13
1996-03-17 Remedial Casing Cementing 275.00 276.00 0
1996-03-17 Cement Plug 144.00 276.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 545 0.0 0.0 0.0
1973 6431 0.0 0.0 0.0
1974 6144 0.0 0.0 0.0
1975 3673 0.0 0.0 0.0
1976 5332 0.0 0.0 0.0
1977 6840 0.0 0.0 0.0
1978 5297 0.0 0.0 0.0
1979 6797 0.0 0.0 0.0
1980 6508 0.0 0.0 0.0
1981 5710 0.0 0.0 0.0
1982 8070 0.0 0.0 0.0
1983 7989 0.0 0.0 0.0
1984 7725 0.0 0.0 0.0
1985 7380 0.0 0.0 0.0
1986 4527 0.0 0.0 0.0
1987 1337 0.0 0.0 0.0
1988 7602 0.0 0.0 0.0
1989 6896 0.0 0.0 0.0
1990 7806 0.0 0.0 0.0
1991 7342 0.0 0.0 0.0
1992 8316 0.0 0.0 0.0
1993 5819 0.0 0.0 0.0
1994 7321 0.0 0.0 0.0
1995 7594 0.0 0.0 0.0
1996 1506 0.0 0.0 0.0

For data sources see[5]