X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166050706003

Well Details

Well ID: 1166050706003
Loading map...
Location: 00/06-07-116-05W6/3
Location Alias: 00/06-07-16-05 W6M
Location Alias 2: 00/06-07-116-05 W6/03
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 05
Section: 07
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 6-7-116-5
Operator Name: Paramount Resources Ltd.
License Number: 0033180
License Date: 1967-12-05
License Status: RecExempt
Spud Date: 2000-04-07
Final Drill Date: 2000-04-10
Well Total Depth: 1306.00 m
Surface Hole Latitude: 59.058299
Surface Hole Longitude: -118.842907

For data sources see[1][2]

Well History

Date Event
1967-12-05 Obtained License
2000-04-06 Well Log Performed
2000-04-07 Direction Drilling Operation Performed - Sidetrack Fish
2000-04-10 Finished Drilling
2000-04-10 Perforation Treatment Performed - Open-Hole Completion
2000-04-10 Well Mode changed to Drilled and Cased
2000-04-11 Well Log Performed
2000-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-15 Rig Released
2002-11-26 Perforation Treatment Performed - Cement Plug
2002-11-26 Plug Back Performed
2002-11-27 Well Log Performed
2002-11-28 Perforation Treatment Performed - Jet Perforation
2002-11-28 Well Log Performed
2002-11-29 Perforation Treatment Performed - Cement Squeeze
2002-11-30 Perforation Treatment Performed - Jet Perforation
2002-11-30 Well Log Performed
2002-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-01 Perforation Treatment Performed - Cement Squeeze
2002-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-02 Perforation Treatment Performed - Jet Perforation
2002-12-02 Well Log Performed
2002-12-06 Perforation Treatment Performed - Cement Squeeze
2002-12-08 Perforation Treatment Performed - Jet Perforation
2002-12-08 Well Log Performed
2002-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-10 Well Log Performed
2003-01-31 Well Began Injection
2003-01-31 Well Fluid changed to Water
2003-01-31 Well Type changed to Injection
2005-10-24 Well Log Performed
2005-10-28 Well Log Performed
2005-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-18 Perforation Treatment Performed - Cement Squeeze
2005-11-18 Plug Back Performed
2005-11-18 Well Fluid changed to Water
2005-11-18 Well Mode changed to Abandoned Zone
2005-11-18 Well Type changed to Injection
2005-11-24 Well Abandoned
2005-11-24 Well Fluid changed to Water
2005-11-24 Well Mode changed to Abandoned
2005-11-24 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-04-07 1253.70 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-04-10 Open Hole/Barefoot Completion 1253.70 1306.00 0
2002-12-01 Cement Squeeze 306.50 307.30 0
2002-12-02 Perforation 220.00 221.00 13
2002-12-02 Acid Treatment 220.00 221.00 0
2002-12-06 Cement Squeeze 220.00 221.00 0
2002-12-08 Perforation 429.90 438.90 13
2002-12-09 Acid Treatment 429.90 438.90 0
2005-11-18 Cement Squeeze 429.90 438.90 0
2005-11-18 Packing Device Capped w/Cement 280.00 299.40 0
2000-04-12 Acid Treatment 1253.70 1306.00 0
2000-04-13 Acid Treatment 1253.70 1306.00 0
2002-11-26 Cement Plug 1230.10 1306.00 0
2002-11-28 Perforation 480.00 480.30 39
2002-11-29 Cement Squeeze 480.00 480.30 0
2002-11-30 Perforation 307.00 307.30 74
2002-11-30 Perforation 306.50 306.80 74
2002-12-01 Acid Treatment 306.50 307.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0

For data sources see[6]

References