X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166042605002

Well Details

Well ID: 1166042605002
Loading map...
Location: 00/05-26-116-04W6/2
Location Alias: 00/05-26-16-04 W6M
Location Alias 2: 00/05-26-116-04 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 26
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 5-26-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0040647
License Date: 1971-08-23
License Status: Abandoned
Spud Date: 1971-10-02
Final Drill Date: 1971-10-15
Well Total Depth: 1496.60 m
Surface Hole Latitude: 59.099835
Surface Hole Longitude: -118.562775

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-08-23 Obtained License
1971-10-08 Drill Stem Test Performed
1971-10-10 Drill Stem Test Performed
1971-10-13 Drill Stem Test Performed
1971-10-14 Drill Stem Test Performed
1971-10-15 Finished Drilling
1971-10-15 Well Mode changed to Drilled and Cased
1971-10-17 Production Casing Operation Performed
1971-11-07 Perforation Treatment Performed - Jet Perforation
1971-11-08 Perforation Treatment Performed - Acid Wash - No Pressure
1980-10-28 Perforation Treatment Performed - Cement Squeeze
1980-11-12 Perforation Treatment Performed - Jet Perforation
1980-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-06 Perforation Treatment Performed - Jet Perforation
1997-03-06 Well Log Performed
1997-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-07 Perforation Treatment Performed - Cement Squeeze
1997-03-16 Well Log Performed
1997-03-17 Perforation Treatment Performed - Jet Perforation
1997-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-01 Well Began Production
1997-04-01 Well Fluid changed to Gas
1997-04-01 Well Mode changed to Flowing
2008-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-20 Perforation Treatment Performed - Jet Perforation
2008-03-20 Plug Back Performed
2008-03-20 Well Fluid changed to Gas
2008-03-20 Well Log Performed
2008-03-20 Well Mode changed to Abandoned Zone
2008-03-21 Well Log Performed
2008-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-23 Perforation Treatment Performed - Cement Plug
2008-03-23 Perforation Treatment Performed - Remedial Casing
2008-03-29 Well Abandoned
2008-03-29 Well Fluid changed to Gas
2008-03-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-11-07 Perforation 1413.40 1416.10 7
1997-03-17 Perforation 1216.80 1219.80 20
1997-03-21 Acid Treatment 1216.80 1219.80 0
2008-03-20 Packing Device Capped w/Cement 1204.00 1212.00 0
2008-03-20 Perforation 580.00 580.90 20
2008-03-22 Acid Treatment 580.00 580.90 0
2008-03-23 Remedial Casing Cementing 580.00 580.90 0
2008-03-23 Cement Plug 405.00 625.00 0
1971-11-08 Acid Wash 1413.40 1416.10 0
1980-10-28 Cement Squeeze 1413.40 1416.10 0
1980-11-12 Perforation 1410.40 1412.20 13
1980-11-13 Acid Treatment 1410.40 1412.20 0
1997-03-05 Packing Device Capped w/Cement 1397.00 1405.00 0
1997-03-06 Perforation 1265.20 1266.20 13
1997-03-07 Acid Treatment 1265.20 1266.20 0
1997-03-07 Cement Squeeze 1265.20 1266.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1508 0.0 0.0 0.0
1998 56 0.0 0.0 0.0
2001 239 0.0 0.0 0.0

For data sources see[5]

References