X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166042304002

Well Details

Well ID: 1166042304002
Loading map...
Location: 00/04-23-116-04W6/2
Location Alias: 00/04-23-16-04 W6M
Location Alias 2: 00/04-23-116-04 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 23
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 4-23-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0040645
License Date: 1971-08-23
License Status: Abandoned
Spud Date: 1971-10-21
Final Drill Date: 1971-11-05
Well Total Depth: 1476.80 m
Surface Hole Latitude: 59.083832
Surface Hole Longitude: -118.563464

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-08-23 Obtained License
1971-10-26 Drill Stem Test Performed
1971-10-28 Drill Stem Test Performed
1971-10-31 Well Log Performed
1971-11-04 Drill Stem Test Performed
1971-11-05 Finished Drilling
1971-11-05 Well Log Performed
1971-11-05 Well Mode changed to Drilled and Cased
1971-11-06 Liner Casing Operation Performed
1971-11-17 Perforation Treatment Performed - Jet Perforation
1971-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-07 Perforation Treatment Performed - Cement Squeeze
1981-06-10 Perforation Treatment Performed - Jet Perforation
1981-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-23 Well Log Performed
1996-11-25 Well Log Performed
1996-11-28 Well Log Performed
1996-11-29 Well Log Performed
1996-11-30 Well Log Performed
1996-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-01 Perforation Treatment Performed - Jet Perforation
1996-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-12-04 Well Log Performed
1997-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-09 Well Log Performed
1997-03-10 Perforation Treatment Performed - Jet Perforation
1997-03-10 Well Log Performed
1997-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-14 Well Began Production
1998-02-14 Well Fluid changed to Gas
1998-02-14 Well Mode changed to Flowing
2004-06-06 Well Log Performed
2004-06-07 Perforation Treatment Performed - Jet Perforation
2004-06-07 Well Log Performed
2008-01-26 Perforation Treatment Performed - Cement Plug
2008-01-26 Well Log Performed
2008-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-01-27 Plug Back Performed
2008-01-27 Well Fluid changed to Gas
2008-01-27 Well Log Performed
2008-01-27 Well Mode changed to Abandoned Zone
2008-01-28 Well Log Performed
2008-01-31 Perforation Treatment Performed - Jet Perforation
2008-01-31 Well Log Performed
2008-02-01 Perforation Treatment Performed - Remedial Casing
2008-02-02 Perforation Treatment Performed - Jet Perforation
2008-02-02 Well Log Performed
2008-02-10 Well Log Performed
2008-02-11 Perforation Treatment Performed - Remedial Casing
2008-02-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-11-17 Perforation 1412.70 1417.90 7
1996-12-01 Perforation 1402.00 1404.00 14
1996-12-03 Acid Treatment 1402.00 1418.30 0
1997-03-09 Packing Device Capped w/Cement 1385.00 1393.00 0
1997-03-10 Perforation 1210.70 1219.20 13
1997-03-11 Acid Treatment 1210.70 1219.20 0
2004-06-07 Perforation 1286.80 1288.00 13
2008-01-26 Cement Plug 1329.00 1385.00 0
2008-01-27 Packing Device Capped w/Cement 1195.00 1203.00 0
2008-01-27 Packing Device Capped w/Cement 1267.00 1275.00 0
2008-01-31 Perforation 567.00 568.00 17
1971-11-18 Acid Treatment 1412.70 1417.90 0
2008-02-01 Remedial Casing Cementing 567.00 568.00 0
2008-02-02 Perforation 240.00 241.00 17
2008-02-11 Remedial Casing Cementing 240.00 241.00 0
1981-06-07 Cement Squeeze 1412.70 1417.90 0
1981-06-10 Perforation 1447.70 1449.50 13
1981-06-10 Perforation 1446.00 1447.70 13
1981-06-11 Acid Treatment 1446.00 1449.50 0
1996-12-01 Packing Device Capped w/Cement 1421.00 1429.00 0
1996-12-01 Perforation 1417.30 1418.30 14
1996-12-01 Perforation 1405.70 1408.70 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 6817 0.0 0.0 0.0
1999 8230 0.0 0.0 0.0
2000 3241 0.0 0.0 0.0

For data sources see[5]

References