X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166041916003

Well Details

Well ID: 1166041916003
Loading map...
Location: 00/16-19-116-04W6/3
Location Alias: 00/16-19-16-04 W6M
Location Alias 2: 00/16-19-116-04 W6/03
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 19
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 16-19-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0030256
License Date: 1966-03-18
License Status: Suspension
Spud Date: 1966-03-22
Final Drill Date: 1966-05-08
Well Total Depth: 1727.60 m
Surface Hole Latitude: 59.094552
Surface Hole Longitude: -118.657684

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-03-18 Obtained License
1966-04-01 Drill Stem Test Performed
1966-04-03 Drill Stem Test Performed
1966-04-13 Drill Stem Test Performed
1966-04-16 Drill Stem Test Performed
1966-04-22 Drill Stem Test Performed
1966-04-23 Drill Stem Test Performed
1966-04-26 Drill Stem Test Performed
1966-04-28 Drill Stem Test Performed
1966-05-08 Finished Drilling
1966-05-08 Well Mode changed to Drilled and Cased
1966-05-10 Drill Stem Test Performed
1966-05-11 Drill Stem Test Performed
1966-05-12 Drill Stem Test Performed
1966-05-12 Liner Casing Operation Performed
1966-05-15 Perforation Treatment Performed - Bullet Perforation
1966-05-16 Perforation Treatment Performed - Acid Wash - No Pressure
1966-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-18 Perforation Treatment Performed - Cement Squeeze
1966-05-18 Perforation Treatment Performed - Jet Perforation
1967-01-14 Perforation Treatment Performed - Cement Squeeze
1967-01-15 Perforation Treatment Performed - Jet Perforation
1967-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-05 Well Log Performed
1995-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-12 Well Log Performed
1995-07-14 Perforation Treatment Performed - Cement Squeeze
1995-07-14 Plug Back Performed
1995-07-18 Well Log Performed
1995-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-19 Perforation Treatment Performed - Jet Perforation
1995-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-09 Perforation Treatment Performed - Cement Squeeze
1995-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-27 Well Log Performed
1997-11-28 Perforation Treatment Performed - Jet Perforation
1997-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-30 Well Log Performed
1997-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-01 Plug Back Performed
1998-02-25 Perforation Treatment Performed - Jet Perforation
1998-02-25 Well Log Performed
1998-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-27 Plug Back Performed
2003-02-27 Well Log Performed
2004-09-02 Perforation Treatment Performed - Jet Perforation
2004-09-03 Perforation Treatment Performed - Cement Squeeze
2004-09-03 Plug Back Performed
2004-09-07 Perforation Treatment Performed - Jet Perforation
2004-09-13 Perforation Treatment Performed - Cement Squeeze
2004-09-21 Well Log Performed
2004-09-25 Perforation Treatment Performed - Jet Perforation
2004-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-09-28 Perforation Treatment Performed - Jet Perforation
2004-09-28 Well Log Performed
2004-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-10-05 Well Log Performed
2004-10-07 Perforation Treatment Performed - Jet Perforation
2004-10-07 Well Log Performed
2004-10-10 Perforation Treatment Performed - Cement Squeeze
2004-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-10-18 Perforation Treatment Performed - Jet Perforation
2004-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-08-10 Well Log Performed
2007-05-27 Well Began Injection
2007-05-27 Well Fluid changed to Water
2007-05-27 Well Type changed to Injection
2010-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-25 Well Fluid changed to Water
2017-03-25 Well Mode changed to Suspended
2017-03-25 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-05-15 Bullet Perforation 1520.30 1528.90 13
1967-01-15 Perforation 1456.90 1458.20 13
1967-01-15 Perforation 1460.90 1462.10 13
1967-01-15 Perforation 1465.50 1466.40 13
1967-01-15 Perforation 1467.90 1468.80 13
1967-01-15 Perforation 1470.40 1475.20 13
1967-01-16 Acid Treatment 1453.30 1475.20 0
1990-05-06 Acid Treatment 1453.30 1475.20 0
1995-07-12 Acid Treatment 1501.40 1502.30 0
1995-07-12 Acid Treatment 1511.80 1514.80 0
1995-07-14 Cement Squeeze 1453.30 1514.90 0
1966-05-16 Acid Wash 1520.30 1528.90 0
1995-07-19 Perforation 1511.80 1514.80 13
1995-07-19 Acid Treatment 1511.80 1514.80 0
1995-07-21 Acid Treatment 1470.30 1475.30 0
1995-11-09 Cement Squeeze 1467.90 1475.20 0
1995-11-09 Cement Squeeze 1501.40 1509.40 0
1995-11-17 Acid Treatment 1511.80 1514.80 0
1997-11-28 Perforation 1470.00 1475.80 13
1997-11-29 Acid Treatment 1470.00 1475.30 0
1997-12-01 Packing Device Capped w/Cement 1437.00 1445.00 0
1998-02-25 Perforation 1328.60 1333.20 13
1966-05-18 Cement Squeeze 1520.30 1528.90 0
1998-02-26 Acid Treatment 1328.60 1333.20 0
2003-02-27 Packing Device Capped w/Cement 1312.00 1320.00 0
2004-09-02 Perforation 1328.60 1333.20 13
2004-09-03 Cement Squeeze 1328.60 1333.20 0
2004-09-07 Perforation 1511.80 1514.80 13
2004-09-07 Perforation 1470.00 1475.80 13
2004-09-13 Cement Squeeze 1511.80 1514.80 0
2004-09-25 Perforation 1521.00 1524.00 13
2004-09-25 Perforation 1475.00 1480.00 13
2004-09-27 Acid Treatment 1475.00 1480.00 0
1966-05-18 Perforation 1501.40 1502.40 13
2004-09-28 Perforation 1470.00 1475.00 13
2004-09-28 Acid Treatment 1470.00 1480.00 0
2004-10-04 Acid Treatment 1521.00 1524.00 0
2004-10-07 Perforation 1515.50 1518.50 13
2004-10-10 Cement Squeeze 1470.00 1480.00 0
2004-10-16 Acid Treatment 1515.50 1524.00 0
2004-10-18 Perforation 1470.00 1473.00 13
2004-10-20 Acid Treatment 1470.00 1473.00 0
2010-10-05 Acid Treatment 1515.50 1524.00 0
2017-03-25 Packing Device Capped w/Cement 1487.00 1495.00 0
1966-05-18 Perforation 1507.50 1509.40 13
1966-05-18 Perforation 1511.80 1514.90 13
1966-05-18 Acid Treatment 1501.40 1514.90 0
1967-01-14 Cement Squeeze 1501.40 1514.90 0
1967-01-15 Perforation 1453.30 1454.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References