X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166041904003

Well Details

Well ID: 1166041904003
Loading map...
Location: 00/04-19-116-04W6/3
Location Alias: 00/04-19-16-04 W6M
Location Alias 2: 00/04-19-116-04 W6/03
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 19
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 4-19-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0030658
License Date: 1966-07-05
License Status: Issued
Spud Date: 1966-07-28
Final Drill Date: 1966-08-28
Well Total Depth: 1635.30 m
Surface Hole Latitude: 59.083160
Surface Hole Longitude: -118.678916

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-07-05 Obtained License
1966-08-05 Drill Stem Test Performed
1966-08-06 Drill Stem Test Performed
1966-08-07 Drill Stem Test Performed
1966-08-09 Well Log Performed
1966-08-10 Well Log Performed
1966-08-14 Drill Stem Test Performed
1966-08-16 Drill Stem Test Performed
1966-08-23 Drill Stem Test Performed
1966-08-28 Finished Drilling
1966-08-28 Well Mode changed to Drilled and Cased
1966-08-29 Well Log Performed
1966-08-30 Drill Stem Test Performed
1966-09-01 Liner Casing Operation Performed
1966-09-03 Perforation Treatment Performed - Bullet Perforation
1966-09-04 Perforation Treatment Performed - Cement Squeeze
1967-01-19 Well Log Performed
1967-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-20 Perforation Treatment Performed - Jet Perforation
1967-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-29 Perforation Treatment Performed - Jet Perforation
1988-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-12-15 Plug Back Performed
1988-12-16 Perforation Treatment Performed - Jet Perforation
1988-12-20 Well Began Production
1988-12-20 Well Fluid changed to Gas
1988-12-20 Well Mode changed to Flowing
1994-01-01 Well Fluid changed to Gas
1994-01-01 Well Mode changed to Suspended
2004-07-26 Perforation Treatment Performed - Jet Perforation
2004-07-29 Perforation Treatment Performed - Jet Perforation
2004-08-01 Perforation Treatment Performed - Cement Squeeze
2004-08-01 Plug Back Performed
2004-08-01 Well Fluid changed to Gas
2004-08-01 Well Mode changed to Abandoned Zone
2004-08-05 Well Log Performed
2004-08-06 Well Log Performed
2004-08-07 Perforation Treatment Performed - Jet Perforation
2004-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-08-09 Well Log Performed
2010-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-09-03 Bullet Perforation 1441.70 1442.00 16
1978-09-29 Perforation 1337.00 1340.00 7
1978-09-29 Perforation 1348.00 1351.00 7
1978-09-29 Perforation 1354.00 1357.00 7
1978-09-29 Acid Treatment 1337.00 1357.00 0
1988-12-15 Packing Device Capped w/Cement 1324.00 1332.00 0
1988-12-16 Perforation 1281.70 1286.00 13
2004-07-26 Perforation 1337.00 1340.00 7
2004-07-26 Perforation 1348.00 1351.00 7
2004-07-26 Perforation 1354.00 1357.00 7
2004-07-29 Perforation 1481.00 1482.20 13
1966-09-04 Cement Squeeze 1441.70 1442.00 0
2004-07-29 Perforation 1484.10 1486.50 13
2004-07-29 Perforation 1488.90 1490.80 13
2004-08-01 Cement Squeeze 1481.00 1490.80 0
2004-08-01 Cement Squeeze 1337.00 1357.00 0
2004-08-01 Cement Squeeze 1281.70 1286.00 0
2004-08-07 Perforation 1538.00 1543.00 13
2004-08-08 Acid Treatment 1538.00 1543.00 0
2010-10-06 Acid Treatment 1538.00 1543.00 0
1967-01-20 Perforation 1481.00 1482.20 13
1967-01-20 Perforation 1484.10 1486.50 13
1967-01-20 Perforation 1488.90 1490.80 13
1967-01-20 Acid Treatment 1481.00 1490.80 0
1967-01-21 Acid Treatment 1481.00 1490.80 0
1967-02-11 Acid Treatment 1481.00 1490.80 0
1978-09-28 Packing Device Capped w/Cement 1424.90 1432.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 54 0.0 0.0 0.0
1989 3995 0.0 0.0 0.0
1990 5783 0.0 0.0 0.0
1991 41 0.0 0.0 0.0

For data sources see[5]

References