X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166041708002

Well Details

Well ID: 1166041708002
Loading map...
Location: 00/08-17-116-04W6/2
Location Alias: 00/08-17-16-04 W6M
Location Alias 2: 00/08-17-116-04 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 17
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 8-17-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0031305
License Date: 1966-11-16
License Status: Abandoned
Spud Date: 1966-11-17
Final Drill Date: 1966-12-19
Well Total Depth: 1607.50 m
Surface Hole Latitude: 59.072936
Surface Hole Longitude: -118.629133

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-11-16 Obtained License
1966-12-02 Drill Stem Test Performed
1966-12-12 Drill Stem Test Performed
1966-12-15 Drill Stem Test Performed
1966-12-19 Finished Drilling
1966-12-19 Well Mode changed to Drilled and Cased
1966-12-21 Production Casing Operation Performed
1967-02-02 Well Log Performed
1967-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-02-03 Perforation Treatment Performed - Jet Perforation
1993-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-28 Plug Back Performed
1993-03-30 Perforation Treatment Performed - Jet Perforation
1993-04-01 Well Began Production
1993-04-01 Well Fluid changed to Gas
1993-04-01 Well Mode changed to Flowing
1996-10-26 Well Log Performed
1996-10-27 Well Log Performed
1996-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-28 Perforation Treatment Performed - Jet Perforation
1996-10-28 Plug Back Performed
1996-10-28 Well Fluid changed to Gas
1996-10-28 Well Mode changed to Abandoned Zone
1996-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-30 Well Log Performed
1996-10-31 Perforation Treatment Performed - Jet Perforation
1996-11-01 Perforation Treatment Performed - Cement Squeeze
1996-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-09-05 Well Log Performed
2007-09-06 Well Log Performed
2007-09-07 Well Log Performed
2007-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-08 Perforation Treatment Performed - Jet Perforation
2007-09-08 Plug Back Performed
2007-09-08 Well Log Performed
2007-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-09 Perforation Treatment Performed - Jet Perforation
2007-09-09 Perforation Treatment Performed - Remedial Casing
2007-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-10 Perforation Treatment Performed - Remedial Casing
2007-09-10 Well Log Performed
2007-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-11 Perforation Treatment Performed - Jet Perforation
2007-09-11 Perforation Treatment Performed - Remedial Casing
2007-09-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-02-03 Perforation 1460.60 1464.90 13
1996-10-28 Perforation 1270.40 1271.00 13
1996-10-28 Perforation 1264.90 1267.90 13
1996-10-28 Perforation 1259.40 1260.00 13
1996-10-28 Perforation 1256.30 1257.00 13
1996-10-30 Acid Treatment 1270.40 1271.00 0
1996-10-30 Acid Treatment 1264.90 1267.90 0
1996-10-30 Acid Treatment 1259.40 1260.00 0
1996-10-30 Acid Treatment 1256.30 1257.00 0
1996-10-31 Perforation 1284.40 1285.40 13
1996-11-01 Cement Squeeze 1284.40 1285.40 0
1967-02-03 Perforation 1444.80 1446.30 13
1996-11-05 Acid Treatment 1270.40 1271.00 0
1996-11-05 Acid Treatment 1264.90 1267.90 0
1996-11-05 Acid Treatment 1259.40 1260.00 0
1996-11-05 Acid Treatment 1256.30 1257.00 0
2007-09-08 Perforation 1130.00 1131.00 13
2007-09-08 Packing Device Capped w/Cement 1236.50 1245.00 0
2007-09-09 Remedial Casing Cementing 1130.00 1131.00 0
2007-09-09 Packing Device Capped w/Cement 1109.80 1119.40 0
2007-09-09 Perforation 597.00 598.00 13
2007-09-10 Remedial Casing Cementing 597.00 598.00 0
1967-02-03 Perforation 1450.20 1453.90 13
2007-09-10 Packing Device Capped w/Cement 577.50 587.80 0
2007-09-11 Perforation 247.00 248.00 13
2007-09-11 Remedial Casing Cementing 247.00 248.00 0
2007-09-11 Packing Device Capped w/Cement 229.00 239.80 0
1967-02-03 Perforation 1455.70 1457.20 13
1967-02-03 Acid Treatment 1444.80 1464.90 0
1993-03-28 Packing Device Capped w/Cement 1432.00 1440.00 0
1993-03-30 Perforation 1314.30 1316.10 13
1993-03-30 Perforation 1320.40 1322.20 13
1996-10-28 Packing Device Capped w/Cement 1303.00 1311.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2682 0.0 0.0 0.0
1994 336 0.0 0.0 0.0

For data sources see[5]

References