If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1166041703002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.067719,"lon":-118.646659,"icon":""}]} |
| Location: 00/03-17-116-04W6/2 | |
| Location Alias: 00/03-17-16-04 W6M | |
| Location Alias 2: 00/03-17-116-04 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 116 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 17 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACLL ZAMA 3-17-116-4 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0036627 | |
| License Date: 1969-07-29 | |
| License Status: Abandoned | |
| Spud Date: 1969-08-12 | |
| Final Drill Date: 1969-08-23 | |
| Well Total Depth: 1524.00 m | |
| Surface Hole Latitude: 59.067719 | |
| Surface Hole Longitude: -118.646659 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1969-07-29 | Obtained License |
| 1969-08-20 | Intermediate Casing Operation Performed |
| 1969-08-23 | Finished Drilling |
| 1969-08-23 | Well Mode changed to Drilled and Cased |
| 1969-08-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1969-08-24 | Perforation Treatment Performed - Open-Hole Completion |
| 1990-05-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-10-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1990-10-04 | Perforation Treatment Performed - Jet Perforation |
| 1990-10-04 | Perforation Treatment Performed - Remedial Casing |
| 1990-10-04 | Plug Back Performed |
| 1990-10-04 | Well Log Performed |
| 2011-01-12 | Well Log Performed |
| 2011-01-15 | Perforation Treatment Performed - Jet Perforation |
| 2011-01-15 | Well Log Performed |
| 2011-01-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2016-10-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-10-09 | Plug Back Performed |
| 2016-10-09 | Well Mode changed to Abandoned Zone |
| 2016-10-20 | Well Abandoned |
| 2016-10-20 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1969-08-24 | Packing Device Capped w/Cement | 1481.30 | 1481.30 | 0 |
| 2016-10-09 | Packing Device Capped w/Cement | 239.50 | 248.00 | 0 |
| 1969-08-24 | Open Hole/Barefoot Completion | 1417.30 | 1481.30 | 0 |
| 1990-05-30 | Acid Treatment | 1417.30 | 1481.30 | 0 |
| 1990-10-04 | Packing Device Capped w/Cement | 1396.00 | 1404.00 | 0 |
| 1990-10-04 | Perforation | 255.00 | 255.30 | 80 |
| 1990-10-04 | Remedial Casing Cementing | 255.00 | 255.30 | 0 |
| 2011-01-15 | Perforation | 1320.20 | 1326.20 | 17 |
| 2011-01-18 | Acid Treatment | 1320.20 | 1326.20 | 0 |
| 2016-10-09 | Packing Device Capped w/Cement | 1297.50 | 1306.00 | 0 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-10-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]