X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166040910005

Well Details

Well ID: 1166040910005
Loading map...
Location: 00/10-09-116-04W6/5
Location Alias: 00/10-09-16-04 W6M
Location Alias 2: 00/10-09-116-04 W6/05
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 09
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 10-9-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0032261
License Date: 1967-06-12
License Status: Abandoned
Spud Date: 1967-06-18
Final Drill Date: 1967-07-12
Well Total Depth: 1473.40 m
Surface Hole Latitude: 59.062974
Surface Hole Longitude: -118.609649

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-06-12 Obtained License
1967-07-01 Drill Stem Test Performed
1967-07-02 Drill Stem Test Performed
1967-07-09 Drill Stem Test Performed
1967-07-10 Drill Stem Test Performed
1967-07-11 Drill Stem Test Performed
1967-07-12 Drill Stem Test Performed
1967-07-12 Finished Drilling
1967-07-12 Well Mode changed to Drilled and Cased
1967-07-14 Drill Stem Test Performed
1967-07-19 Liner Casing Operation Performed
1967-08-02 Well Log Performed
1967-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-03 Perforation Treatment Performed - Jet Perforation
1986-05-13 Perforation Treatment Performed - Jet Perforation
1986-05-13 Well Log Performed
1986-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-27 Perforation Treatment Performed - Jet Perforation
2000-01-27 Plug Back Performed
2000-01-27 Well Log Performed
2000-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-11-10 Well Log Performed
2003-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-11 Perforation Treatment Performed - Jet Perforation
2003-11-11 Plug Back Performed
2003-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-11-12 Well Log Performed
2004-03-13 Perforation Treatment Performed - Jet Perforation
2004-03-14 Perforation Treatment Performed - Cement Squeeze
2004-03-14 Plug Back Performed
2004-03-19 Perforation Treatment Performed - Jet Perforation
2004-03-21 Well Log Performed
2004-03-22 Well Log Performed
2004-03-23 Perforation Treatment Performed - Cement Squeeze
2004-03-27 Perforation Treatment Performed - Open-Hole Completion
2004-03-27 Well Log Performed
2004-03-28 Perforation Treatment Performed - Jet Perforation
2004-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-03-29 Well Log Performed
2004-05-01 Perforation Treatment Performed - Jet Perforation
2005-08-22 Well Log Performed
2005-08-23 Perforation Treatment Performed - Jet Perforation
2005-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-08-25 Well Log Performed
2005-08-26 Well Log Performed
2005-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-27 Plug Back Performed
2005-08-27 Well Log Performed
2005-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-28 Plug Back Performed
2005-08-28 Well Log Performed
2005-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-29 Perforation Treatment Performed - Jet Perforation
2005-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-01-15 Well Began Production
2006-01-15 Well Fluid changed to Gas
2006-01-15 Well Mode changed to Flowing
2010-01-16 Perforation Treatment Performed - Cement Plug
2010-01-16 Plug Back Performed
2010-01-16 Well Fluid changed to Gas
2010-01-16 Well Mode changed to Abandoned Zone
2010-01-17 Well Log Performed
2010-01-19 Perforation Treatment Performed - Jet Perforation
2010-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-20 Perforation Treatment Performed - Remedial Casing
2010-01-20 Well Log Performed
2010-01-21 Perforation Treatment Performed - Jet Perforation
2010-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-22 Perforation Treatment Performed - Remedial Casing
2010-02-04 Well Abandoned
2010-02-04 Well Fluid changed to Gas
2010-02-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-08-03 Perforation 1406.00 1411.20 7
2003-11-11 Packing Device Capped w/Cement 1278.00 1286.00 0
2003-11-11 Perforation 1264.90 1266.10 13
2003-11-11 Perforation 1267.70 1269.80 13
2003-11-11 Perforation 1275.30 1275.90 13
2003-11-12 Acid Treatment 1264.90 1275.90 0
2004-03-13 Perforation 1287.00 1289.00 13
2004-03-13 Perforation 1290.50 1291.10 13
2004-03-14 Cement Squeeze 1287.00 1291.10 0
2004-03-14 Cement Squeeze 1264.90 1275.90 0
2004-03-19 Perforation 1406.00 1411.20 7
1967-08-03 Acid Treatment 1406.00 1411.20 0
2004-03-19 Perforation 1414.30 1419.10 13
2004-03-19 Perforation 1425.20 1431.60 13
2004-03-23 Cement Squeeze 1406.00 1431.60 0
2004-03-27 Open Hole/Barefoot Completion 1459.40 1473.40 0
2004-03-28 Perforation 1462.00 1465.00 13
2004-03-29 Acid Treatment 1459.40 1473.40 0
2004-05-01 Perforation 1406.00 1411.20 13
2005-08-23 Perforation 1437.00 1441.00 13
2005-08-24 Acid Treatment 1437.00 1441.00 0
2005-08-27 Packing Device Capped w/Cement 1423.00 1431.00 0
1986-05-13 Perforation 1414.30 1419.10 13
2005-08-28 Packing Device Capped w/Cement 1390.00 1398.00 0
2005-08-28 Packing Device Capped w/Cement 1291.00 1322.40 0
2005-08-29 Packing Device Capped w/Cement 1276.00 1284.00 0
2005-08-29 Perforation 1234.70 1235.60 13
2005-08-29 Perforation 1237.50 1238.50 13
2005-09-01 Acid Treatment 1234.70 1238.50 0
2010-01-16 Cement Plug 1150.80 1291.10 0
2010-01-19 Perforation 1104.00 1105.00 20
2010-01-20 Remedial Casing Cementing 1104.00 1105.00 0
2010-01-20 Packing Device Capped w/Cement 1092.00 1102.00 0
1986-05-13 Perforation 1425.20 1431.60 13
2010-01-21 Perforation 236.00 237.00 20
2010-01-22 Remedial Casing Cementing 236.00 237.00 0
2010-01-22 Packing Device Capped w/Cement 224.00 234.00 0
1986-05-14 Acid Treatment 1414.30 1431.60 0
2000-01-27 Packing Device Capped w/Cement 1395.80 1403.80 0
2000-01-27 Perforation 1287.00 1289.00 13
2000-01-27 Perforation 1290.50 1291.10 13
2000-01-29 Acid Treatment 1287.00 1291.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5688 0.0 0.0 0.0
2007 744 0.0 0.0 0.0

For data sources see[5]

References