X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166040713000

Well Details

Well ID: 1166040713000
Loading map...
Location: 00/13-07-116-04W6/0
Location Alias: 00/13-07-16-04 W6M
Location Alias 2: 00/13-07-116-04 W6/00
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 07
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 13-7-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0031044
License Date: 1966-09-26
License Status: Suspension
Spud Date: 1966-09-29
Final Drill Date: 1966-11-13
Well Total Depth: 1612.10 m
Surface Hole Latitude: 59.064507
Surface Hole Longitude: -118.681043

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-09-26 Obtained License
1966-10-14 Drill Stem Test Performed
1966-10-18 Drill Stem Test Performed
1966-10-23 Drill Stem Test Performed
1966-11-13 Finished Drilling
1966-11-13 Well Mode changed to Drilled and Cased
1966-11-17 Production Casing Operation Performed
1966-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-19 Perforation Treatment Performed - Jet Perforation
1966-11-19 Well Log Performed
1966-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-21 Perforation Treatment Performed - Cement Squeeze
1966-11-21 Perforation Treatment Performed - Jet Perforation
1966-11-25 Perforation Treatment Performed - Cement Squeeze
1967-02-08 Perforation Treatment Performed - Jet Perforation
1967-02-08 Well Began Production
1967-02-08 Well Fluid changed to Crude Oil
1967-02-08 Well Mode changed to Flowing
1967-02-09 Perforation Treatment Performed - Cement Squeeze
1970-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-05-09 Perforation Treatment Performed - Cement Squeeze
1970-05-10 Perforation Treatment Performed - Cement Squeeze
1970-05-10 Perforation Treatment Performed - Jet Perforation
1970-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-05 Well Fluid changed to Crude Oil
1975-06-05 Well Mode changed to Pumping
1986-07-29 Perforation Treatment Performed - Jet Perforation
1986-07-29 Well Log Performed
1986-07-30 Perforation Treatment Performed - Jet Perforation
1986-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-31 Perforation Treatment Performed - Jet Perforation
1995-11-01 Perforation Treatment Performed - Cement Squeeze
1995-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-19 Well Log Performed
2000-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-20 Plug Back Performed
2000-02-20 Well Fluid changed to Crude Oil
2000-02-20 Well Mode changed to Abandoned Zone
2000-02-21 Perforation Treatment Performed - Jet Perforation
2000-02-21 Well Log Performed
2000-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-22 Well Log Performed
2001-11-24 Well Log Performed
2002-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-12 Plug Back Performed
2002-01-12 Well Log Performed
2002-01-13 Perforation Treatment Performed - Jet Perforation
2002-01-13 Well Log Performed
2002-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-05-06 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-11-19 Perforation 1505.10 1506.00 7
1967-02-08 Perforation 1447.80 1449.60 13
1967-02-09 Cement Squeeze 1447.80 1464.90 0
1970-05-09 Acid Treatment 1447.80 1464.90 0
1970-05-09 Cement Squeeze 1447.80 1464.90 0
1970-05-10 Cement Squeeze 1447.80 1464.90 0
1970-05-10 Perforation 1438.70 1444.80 13
1970-05-11 Acid Treatment 1438.70 1444.80 0
1986-07-29 Perforation 1436.50 1438.50 13
1986-07-29 Perforation 1434.50 1435.50 13
1986-07-30 Perforation 1434.50 1435.50 13
1966-11-19 Acid Treatment 1505.10 1506.00 0
1986-07-31 Acid Treatment 1434.50 1438.50 0
1995-10-31 Perforation 1432.50 1434.40 13
1995-11-01 Cement Squeeze 1436.50 1444.80 0
1995-11-02 Acid Treatment 1432.50 1435.50 0
2000-02-20 Packing Device Capped w/Cement 1422.00 1430.00 0
2000-02-21 Perforation 1313.00 1315.00 13
2000-02-21 Perforation 1319.00 1321.00 13
2000-02-22 Acid Treatment 1313.00 1321.00 0
2002-01-12 Packing Device Capped w/Cement 1302.00 1310.00 0
2002-01-13 Perforation 1256.40 1259.70 13
1966-11-21 Cement Squeeze 1505.10 1506.00 0
2002-01-13 Perforation 1262.80 1267.40 13
2002-01-14 Acid Treatment 1256.40 1267.40 0
2004-05-06 Perforation 1313.00 1315.00 13
2004-05-06 Perforation 1319.00 1321.00 13
1966-11-21 Perforation 1494.10 1495.00 13
1966-11-21 Acid Treatment 1494.10 1495.00 0
1966-11-25 Cement Squeeze 1494.10 1495.00 0
1967-02-08 Perforation 1463.00 1464.90 13
1967-02-08 Perforation 1457.90 1459.70 13
1967-02-08 Perforation 1451.50 1452.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 1936 0.0 0.0 0.0
1968 4360 0.0 0.0 0.0
1969 6603 0.0 0.0 0.0
1970 7325 0.0 0.0 0.0
1971 6034 0.0 0.0 0.0
1972 4444 0.0 0.0 0.0
1973 7768 0.0 0.0 0.0
1974 7460 0.0 0.0 0.0
1975 5434 0.0 0.0 0.0
1976 4274 0.0 0.0 0.0
1977 4750 0.0 0.0 0.0
1978 4707 0.0 0.0 0.0
1979 8343 0.0 0.0 0.0
1980 6964 0.0 0.0 0.0
1981 5883 0.0 0.0 0.0
1982 8601 0.0 0.0 0.0
1983 8422 0.0 0.0 0.0
1984 8261 0.0 0.0 0.0
1985 8374 0.0 0.0 0.0
1986 8530 0.0 0.0 0.0
1987 8534 0.0 0.0 0.0
1988 8411 0.0 0.0 0.0
1989 8195 0.0 0.0 0.0
1990 8551 0.0 0.0 0.0
1991 8246 0.0 0.0 0.0
1992 8611 0.0 0.0 0.0
1993 7624 0.0 0.0 0.0
1994 8637 0.0 0.0 0.0
1995 5610 0.0 0.0 0.0
1996 8484 0.0 0.0 0.0
1997 8229 0.0 0.0 0.0
1998 8258 0.0 0.0 0.0
1999 8517 0.0 0.0 0.0
2000 1097 0.0 0.0 0.0

For data sources see[5]

References