X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166040606002

Well Details

Well ID: 1166040606002
Loading map...
Location: 00/06-06-116-04W6/2
Location Alias: 00/06-06-16-04 W6M
Location Alias 2: 00/06-06-116-04 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 06
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 6-6-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0124158
License Date: 1986-10-16
License Status: Abandoned
Spud Date: 1986-11-05
Final Drill Date: 1986-11-30
Well Total Depth: 1492.00 m
Surface Hole Latitude: 59.042795
Surface Hole Longitude: -118.673208

For data sources see[1][2]

Well History

Date Event
1986-10-16 Obtained License
1986-11-08 Surface Casing Operation Performed
1986-11-17 Drill Stem Test Performed
1986-11-19 Drill Stem Test Performed
1986-11-19 Well Log Performed
1986-11-21 Production Casing Operation Performed
1986-11-30 Finished Drilling
1986-11-30 Well Log Performed
1986-11-30 Well Mode changed to Drilled and Cased
1986-12-01 Drill Stem Test Performed
1986-12-01 Well Log Performed
1986-12-02 Well Log Performed
1986-12-03 Plug Back Performed
1986-12-04 Rig Released
1999-03-10 Well Log Performed
1999-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-20 Perforation Treatment Performed - Jet Perforation
1999-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-21 Perforation Treatment Performed - Jet Perforation
1999-03-21 Well Mode changed to Drilled and Cased
1999-04-20 Well Began Production
1999-04-20 Well Fluid changed to Gas
1999-04-20 Well Mode changed to Flowing
2010-01-06 Well Log Performed
2010-01-07 Well Log Performed
2010-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-08 Plug Back Performed
2010-01-08 Well Fluid changed to Gas
2010-01-08 Well Log Performed
2010-01-08 Well Mode changed to Abandoned Zone
2010-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-09 Perforation Treatment Performed - Jet Perforation
2010-01-09 Perforation Treatment Performed - Remedial Casing
2010-01-21 Well Abandoned
2010-01-21 Well Fluid changed to Gas
2010-01-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-20 Perforation 1335.00 1337.00 13
1999-03-20 Acid Treatment 1335.00 1337.00 0
1999-03-21 Perforation 1251.00 1255.00 14
1999-03-21 Acid Treatment 1251.00 1255.00 0
2010-01-08 Packing Device Capped w/Cement 1239.00 1247.00 0
2010-01-08 Packing Device Capped w/Cement 1313.50 1321.50 0
2010-01-09 Remedial Casing Cementing 605.00 606.00 0
2010-01-09 Packing Device Capped w/Cement 595.00 603.00 0
2010-01-09 Perforation 605.00 606.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 2674 0.0 0.0 0.0

For data sources see[5]

References