X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166033102002

Well Details

Well ID: 1166033102002
Loading map...
Location: 00/02-31-116-03W6/2
Location Alias: 00/02-31-16-03 W6M
Location Alias 2: 00/02-31-116-03 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 03
Section: 31
County/Municipality: Mackenzie County
Well Name: ACL LARNE 2-31-116-3
Operator Name: Paramount Resources Ltd.
License Number: 0035100
License Date: 1968-11-01
License Status: Abandoned
Spud Date: 1968-11-10
Final Drill Date: 1968-11-30
Well Total Depth: 1578.90 m
Surface Hole Latitude: 59.111621
Surface Hole Longitude: -118.495760

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-11-01 Obtained License
1968-11-21 Drill Stem Test Performed
1968-11-30 Finished Drilling
1968-12-03 Liner Casing Operation Performed
1968-12-21 Perforation Treatment Performed - Jet Perforation
1968-12-21 Well Log Performed
1969-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-09-14 Perforation Treatment Performed - Cement Squeeze
1971-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-09-15 Perforation Treatment Performed - Jet Perforation
1971-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-13 Perforation Treatment Performed - Cement Squeeze
1978-07-16 Perforation Treatment Performed - Cement Squeeze
1978-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-19 Perforation Treatment Performed - Jet Perforation
1985-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-13 Perforation Treatment Performed - Jet Perforation
1985-06-13 Plug Back Performed
1985-06-13 Well Log Performed
1985-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-14 Perforation Treatment Performed - Jet Perforation
1985-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-16 Perforation Treatment Performed - Jet Perforation
1985-06-16 Well Log Performed
1985-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-07 Perforation Treatment Performed - Cement Squeeze
1991-03-07 Plug Back Performed
1991-03-08 Perforation Treatment Performed - Jet Perforation
1991-03-08 Well Log Performed
1991-03-18 Well Mode changed to Drilled and Cased
1993-06-29 Well Began Production
1993-06-29 Well Fluid changed to Gas
1993-06-29 Well Mode changed to Flowing
1996-07-04 Perforation Treatment Performed - Chemical Squeeze
1996-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-20 Well Log Performed
2009-03-21 Well Log Performed
2009-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-22 Perforation Treatment Performed - Jet Perforation
2009-03-22 Plug Back Performed
2009-03-22 Well Fluid changed to Gas
2009-03-22 Well Mode changed to Abandoned Zone
2009-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-23 Perforation Treatment Performed - Remedial Casing
2009-03-27 Well Abandoned
2009-03-27 Well Fluid changed to Gas
2009-03-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-12-21 Perforation 1416.10 1417.90 7
1978-07-19 Perforation 1459.40 1463.00 7
1978-07-19 Acid Treatment 1459.40 1463.00 0
1985-06-13 Packing Device Capped w/Cement 1445.00 1445.00 0
1985-06-13 Perforation 1415.00 1416.00 13
1985-06-14 Packing Device Capped w/Cement 1414.00 1414.00 0
1985-06-14 Perforation 1403.70 1405.20 13
1985-06-14 Perforation 1406.80 1408.80 13
1985-06-16 Acid Treatment 1403.70 1408.80 0
1985-06-16 Perforation 1403.70 1405.20 13
1985-06-16 Perforation 1406.80 1408.80 13
1969-01-29 Acid Treatment 1416.10 1417.90 0
1985-06-17 Acid Treatment 1403.70 1408.80 0
1991-03-07 Cement Squeeze 1403.70 1408.80 0
1991-03-08 Perforation 1210.90 1214.70 14
1996-07-04 Chemical Squeeze 1210.90 1214.70 0
1996-07-13 Acid Treatment 1210.90 1214.70 0
2009-03-22 Packing Device Capped w/Cement 1192.00 1200.00 0
2009-03-22 Perforation 579.00 580.00 13
2009-03-23 Remedial Casing Cementing 579.00 580.00 0
2009-03-23 Packing Device Capped w/Cement 565.00 574.00 0
1971-09-14 Cement Squeeze 1416.10 1417.90 0
1971-09-15 Perforation 1404.50 1406.70 7
1971-09-15 Perforation 1408.20 1409.70 7
1971-09-15 Acid Treatment 1404.50 1409.70 0
1971-09-16 Acid Treatment 1404.50 1409.70 0
1978-07-13 Cement Squeeze 1404.50 1409.70 0
1978-07-16 Cement Squeeze 1404.50 1409.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1227 0.0 0.0 0.0

For data sources see[5]

References