X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166032912000

Well Details

Well ID: 1166032912000
Loading map...
Location: 00/12-29-116-03W6/0
Location Alias: 00/12-29-16-03 W6M
Location Alias 2: 00/12-29-116-03 W6/00
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 03
Section: 29
County/Municipality: Mackenzie County
Well Name: ACL ET AL LARNE 12-29-116-3
Operator Name: Paramount Resources Ltd.
License Number: 0042261
License Date: 1972-03-03
License Status: Abandoned
Spud Date: 1972-03-10
Final Drill Date: 1972-03-27
Well Total Depth: 1463.00 m
Surface Hole Latitude: 59.106703
Surface Hole Longitude: -118.482216

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-03-03 Obtained License
1972-03-23 Production Casing Operation Performed
1972-03-27 Finished Drilling
1972-03-27 Perforation Treatment Performed - Open-Hole Completion
1972-03-27 Well Mode changed to Drilled and Cased
1972-03-28 Drill Stem Test Performed
1984-02-12 Well Began Production
1984-02-12 Well Fluid changed to Crude Oil
1984-02-12 Well Mode changed to Pumping
1985-02-18 Well Log Performed
1986-05-31 Well Fluid changed to Crude Oil
1986-05-31 Well Mode changed to Suspended
2000-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-02 Plug Back Performed
2000-03-02 Well Fluid changed to Crude Oil
2000-03-02 Well Mode changed to Abandoned Zone
2000-03-04 Perforation Treatment Performed - Jet Perforation
2000-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-20 Well Log Performed
2009-11-21 Well Log Performed
2009-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-22 Perforation Treatment Performed - Jet Perforation
2009-11-22 Plug Back Performed
2009-11-22 Well Log Performed
2009-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-23 Perforation Treatment Performed - Jet Perforation
2009-11-23 Well Log Performed
2009-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-24 Perforation Treatment Performed - Remedial Casing
2009-11-24 Well Log Performed
2009-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-25 Perforation Treatment Performed - Jet Perforation
2009-11-25 Well Log Performed
2009-11-26 Perforation Treatment Performed - Remedial Casing
2009-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-03-27 Open Hole/Barefoot Completion 1401.50 1463.00 0
2009-11-24 Packing Device Capped w/Cement 220.00 228.00 0
2009-11-24 Remedial Casing Cementing 230.50 231.50 0
2009-11-25 Acid Treatment 216.50 217.50 0
2009-11-25 Perforation 216.50 217.50 17
2009-11-26 Remedial Casing Cementing 216.50 217.50 0
2009-11-28 Packing Device Capped w/Cement 206.50 214.00 0
2000-03-02 Packing Device Capped w/Cement 1379.00 1387.00 0
2000-03-04 Perforation 1207.00 1211.30 17
2000-03-06 Acid Treatment 1207.00 1211.30 0
2009-11-22 Packing Device Capped w/Cement 1197.00 1205.00 0
2009-11-22 Perforation 570.00 571.00 17
2009-11-23 Packing Device Capped w/Cement 560.00 568.00 0
2009-11-23 Acid Treatment 230.50 231.50 0
2009-11-23 Perforation 230.50 231.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 6801 0.0 0.0 0.0
1985 7722 0.0 0.0 0.0
1986 3444 0.0 0.0 0.0

For data sources see[5]

References