X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156072416000

Well Details

Well ID: 1156072416000
Loading map...
Location: 00/16-24-115-07W6/0
Location Alias: 00/16-24-15-07 W6M
Location Alias 2: 00/16-24-115-07 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 07
Section: 24
County/Municipality: Mackenzie County
Well Name: ACL AMBER 16-24-115-7
Operator Name: Paramount Resources Ltd.
License Number: 0036035
License Date: 1969-03-17
License Status: Abandoned
Spud Date: 1969-03-25
Final Drill Date: 1969-04-14
Well Total Depth: 1594.70 m
Surface Hole Latitude: 59.005624
Surface Hole Longitude: -119.028845

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-03-17 Obtained License
1969-04-12 Drill Stem Test Performed
1969-04-14 Drill Stem Test Performed
1969-04-14 Finished Drilling
1969-04-14 Well Mode changed to Drilled and Cased
1969-04-18 Liner Casing Operation Performed
1969-06-15 Well Began Production
1969-06-15 Well Fluid changed to Crude Oil
1969-06-15 Well Mode changed to Flowing
1969-06-16 Perforation Treatment Performed - Jet Perforation
1969-06-20 Perforation Treatment Performed - Acid Wash - No Pressure
1970-04-17 Well Fluid changed to Crude Oil
1970-04-17 Well Mode changed to Suspended
1973-01-01 Well Fluid changed to Crude Oil
1973-01-01 Well Mode changed to Flowing
1984-03-27 Well Log Performed
1984-03-29 Well Log Performed
1986-06-01 Well Fluid changed to Crude Oil
1986-06-01 Well Mode changed to Suspended
1992-11-19 Well Fluid changed to Crude Oil
1992-11-19 Well Mode changed to Flowing
1996-02-03 Perforation Treatment Performed - Cement Squeeze
1996-02-03 Plug Back Performed
1996-02-04 Perforation Treatment Performed - Jet Perforation
1996-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-12-10 Well Log Performed
2000-12-11 Perforation Treatment Performed - Cement Squeeze
2000-12-12 Perforation Treatment Performed - Jet Perforation
2000-12-12 Well Log Performed
2000-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-01-23 Well Fluid changed to Crude Oil
2001-01-23 Well Mode changed to Pumping
2003-05-22 Perforation Treatment Performed - Jet Perforation
2003-05-26 Perforation Treatment Performed - Jet Perforation
2003-05-26 Well Log Performed
2003-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-06-03 Perforation Treatment Performed - Chemical Squeeze
2010-05-01 Well Fluid changed to Crude Oil
2010-05-01 Well Mode changed to Suspended
2013-12-13 Well Log Performed
2013-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-12-14 Plug Back Performed
2013-12-14 Well Fluid changed to Crude Oil
2013-12-14 Well Mode changed to Abandoned Zone
2013-12-15 Well Log Performed
2013-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-12-16 Well Log Performed
2013-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-12-17 Plug Back Performed
2013-12-17 Well Log Performed
2013-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-12-18 Plug Back Performed
2013-12-18 Well Log Performed
2014-01-04 Perforation Treatment Performed - Jet Perforation
2014-01-04 Well Log Performed
2014-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-05 Perforation Treatment Performed - Remedial Casing
2014-01-05 Well Log Performed
2014-01-06 Perforation Treatment Performed - Jet Perforation
2014-01-06 Well Log Performed
2014-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-07 Perforation Treatment Performed - Remedial Casing
2014-01-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-06-16 Perforation 1551.40 1556.30 13
2003-05-22 Perforation 1401.00 1402.00 13
2003-05-22 Perforation 1403.00 1405.00 13
2003-05-22 Perforation 1407.00 1409.00 13
2003-05-26 Perforation 1323.00 1326.50 13
2003-05-26 Perforation 1330.00 1333.00 13
2003-05-31 Acid Treatment 1323.00 1333.00 0
2003-06-03 Chemical Squeeze 1396.00 1409.00 0
2013-12-14 Packing Device Capped w/Cement 1503.00 1511.00 0
2013-12-16 Packing Device Capped w/Cement 1459.00 1467.00 0
2013-12-17 Packing Device Capped w/Cement 1382.00 1390.00 0
1969-06-20 Acid Wash 1551.40 1556.30 0
2013-12-18 Packing Device Capped w/Cement 1308.00 1316.00 0
2014-01-04 Perforation 710.00 711.00 17
2014-01-05 Packing Device Capped w/Cement 697.00 707.00 0
2014-01-05 Remedial Casing Cementing 710.00 711.00 0
2014-01-06 Perforation 355.00 356.00 17
2014-01-07 Remedial Casing Cementing 355.00 356.00 0
2014-01-07 Packing Device Capped w/Cement 343.00 353.00 0
1996-02-03 Cement Squeeze 1551.40 1556.30 0
1996-02-04 Perforation 1541.70 1543.50 13
1996-02-05 Acid Treatment 1541.70 1543.50 0
2000-12-11 Cement Squeeze 1541.70 1543.50 0
2000-12-12 Perforation 1516.30 1519.00 13
2000-12-13 Acid Treatment 1516.30 1519.00 0
2003-05-22 Perforation 1396.00 1398.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 2707 0.0 0.0 0.0
1970 1150 0.0 0.0 0.0
1973 2537 0.0 0.0 0.0
1974 2107 0.0 0.0 0.0
1975 2301 0.0 0.0 0.0
1976 2766 0.0 0.0 0.0
1977 3220 0.0 0.0 0.0
1978 5450 0.0 0.0 0.0
1979 3890 0.0 0.0 0.0
1980 5631 0.0 0.0 0.0
1981 3097 0.0 0.0 0.0
1982 5705 0.0 0.0 0.0
1983 6267 0.0 0.0 0.0
1984 6799 0.0 0.0 0.0
1985 548 0.0 0.0 0.0
1992 991 0.0 0.0 0.0
1993 5474 0.0 0.0 0.0
1994 6911 0.0 0.0 0.0
1995 4118 0.0 0.0 0.0
1996 5375 0.0 0.0 0.0
1997 2140 0.0 0.0 0.0
2001 2578 0.0 0.0 0.0
2002 1926 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References