X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156071114002

Well Details

Well ID: 1156071114002
Loading map...
Location: 00/14-11-115-07W6/2
Location Alias: 00/14-11-15-07 W6M
Location Alias 2: 00/14-11-115-07 W6/02
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 07
Section: 11
County/Municipality: Mackenzie County
Well Name: ACL AMBER 14-11-115-7
Operator Name: Paramount Resources Ltd.
License Number: 0113231
License Date: 1985-02-08
License Status: Abandoned
Spud Date: 1985-02-10
Final Drill Date: 1985-02-28
Well Total Depth: 1622.00 m
Surface Hole Latitude: 58.976178
Surface Hole Longitude: -119.071575

For data sources see[1][2]

Well History

Date Event
1985-02-08 Obtained License
1985-02-11 Surface Casing Operation Performed
1985-02-21 Well Log Performed
1985-02-22 Intermediate Casing Operation Performed
1985-02-22 Well Log Performed
1985-02-24 Kick Occurred
1985-02-24 Lost Circulation Occurred
1985-02-26 Well Log Performed
1985-02-27 Lost Circulation Occurred
1985-02-28 Finished Drilling
1985-02-28 Kick Occurred
1985-02-28 Well Mode changed to Drilled and Cased
1985-03-09 Liner Casing Operation Performed
1985-03-09 Lost Circulation Occurred
1985-03-09 Well Log Performed
1985-03-10 Kick Occurred
1985-03-11 Rig Released
1985-03-18 Well Log Performed
1985-03-20 Perforation Treatment Performed - Jet Perforation
1985-03-20 Well Log Performed
1985-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-05-30 Perforation Treatment Performed - Jet Perforation
1990-05-30 Well Log Performed
1996-03-29 Perforation Treatment Performed - Jet Perforation
1996-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-23 Well Log Performed
2001-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-25 Perforation Treatment Performed - Jet Perforation
2001-08-25 Plug Back Performed
2001-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-09-17 Well Began Production
2001-09-17 Well Fluid changed to Gas
2001-09-17 Well Mode changed to Flowing
2003-05-27 Perforation Treatment Performed - Jet Perforation
2008-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-26 Plug Back Performed
2008-08-27 Well Log Performed
2008-08-28 Well Log Performed
2008-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-29 Perforation Treatment Performed - Jet Perforation
2008-08-29 Plug Back Performed
2008-08-29 Well Fluid changed to Gas
2008-08-29 Well Mode changed to Abandoned Zone
2008-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-30 Perforation Treatment Performed - Remedial Casing
2008-09-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-20 Perforation 1571.00 1577.00 13
2001-08-25 Perforation 1341.00 1348.00 13
2001-08-26 Acid Treatment 1341.00 1348.00 0
2003-05-27 Perforation 1424.00 1426.00 14
2003-05-27 Perforation 1428.00 1429.00 14
2003-05-27 Perforation 1431.00 1433.00 14
2008-08-24 Packing Device Capped w/Cement 1439.00 1473.00 0
2008-08-26 Packing Device Capped w/Cement 1410.00 1418.00 0
2008-08-29 Perforation 735.00 736.00 13
2008-08-29 Packing Device Capped w/Cement 722.00 730.00 0
2008-08-29 Perforation 385.00 386.00 13
1985-03-21 Acid Treatment 1571.00 1577.00 0
2008-08-29 Packing Device Capped w/Cement 1329.00 1337.00 0
2008-08-30 Remedial Casing Cementing 385.00 386.00 0
2008-08-30 Packing Device Capped w/Cement 363.00 377.10 0
1990-05-30 Packing Device Capped w/Cement 1557.00 1565.00 0
1990-05-30 Perforation 1530.00 1531.50 13
1990-05-30 Perforation 1532.50 1535.00 13
1996-03-29 Perforation 1550.00 1552.00 13
1996-03-30 Acid Treatment 1550.00 1552.00 0
2001-08-25 Packing Device Capped w/Cement 1539.00 1547.00 0
2001-08-25 Packing Device Capped w/Cement 1521.00 1529.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1692 0.0 0.0 0.0
2002 5376 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-02-24 Lost Circulation 1579.00 1585.00
1985-02-24 Kick 1585.00 1585.00
1985-02-27 Lost Circulation 1601.00 1622.00
1985-02-28 Kick 1622.00 1622.00
1985-03-09 Lost Circulation 1622.00 1622.00
1985-03-10 Kick 1622.00 1622.00

For data sources see[6]

References