X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156070804020

Well Details

Well ID: 1156070804020
Loading map...
Location: 02/04-08-115-07W6/0
Location Alias: 02/04-08-15-07 W6M
Location Alias 2: 02/04-08-115-07 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 07
Section: 08
County/Municipality: Mackenzie County
Well Name: ACL 102 KR AMBER 4-8-115-7
Operator Name: Paramount Resources Ltd.
License Number: 0108268
License Date: 1984-07-18
License Status: Abandoned
Spud Date: 1984-07-29
Final Drill Date: 1984-09-01
Well Total Depth: 1596.80 m
Surface Hole Latitude: 58.965670
Surface Hole Longitude: -119.164917

For data sources see[1][2]

Well History

Date Event
1984-07-18 Obtained License
1984-08-06 Surface Casing Operation Performed
1984-08-20 Direction Drilling Operation Performed - Deviate
1984-08-25 Drill Stem Test Performed
1984-08-27 Drill Stem Test Performed
1984-08-29 Drill Stem Test Performed
1984-08-30 Drill Stem Test Performed
1984-08-31 Drill Stem Test Performed
1984-09-01 Finished Drilling
1984-09-01 Well Mode changed to Drilled and Cased
1984-09-02 Drill Stem Test Performed
1984-09-03 Well Log Performed
1984-09-04 Drill Stem Test Performed
1984-09-08 Production Casing Operation Performed
1984-09-10 Rig Released
1984-11-02 Well Log Performed
1984-11-03 Perforation Treatment Performed - Jet Perforation
1984-11-03 Well Log Performed
1984-11-04 Well Began Production
1984-11-04 Well Fluid changed to Crude Oil
1984-11-04 Well Mode changed to Flowing
1984-11-10 Perforation Treatment Performed - Jet Perforation
1984-11-10 Well Log Performed
1984-11-11 Perforation Treatment Performed - Fractured
1984-11-21 Perforation Treatment Performed - Casing Patch (Over Perfs)
1984-11-21 Well Log Performed
1984-12-18 Well Fluid changed to Crude Oil
1984-12-18 Well Mode changed to Suspended
1985-01-19 Perforation Treatment Performed - Jet Perforation
1985-01-28 Perforation Treatment Performed - Cement Squeeze
1985-01-29 Well Log Performed
1985-01-30 Perforation Treatment Performed - Cement Squeeze
1985-02-01 Well Fluid changed to Crude Oil
1985-02-01 Well Mode changed to Flowing
1985-02-13 Well Log Performed
1985-02-17 Well Log Performed
1985-02-18 Perforation Treatment Performed - Open-Hole Completion
1985-02-27 Perforation Treatment Performed - Jet Perforation
1985-02-28 Well Fluid changed to Crude Oil
1985-02-28 Well Log Performed
1985-02-28 Well Mode changed to Suspended
1985-04-15 Well Fluid changed to Crude Oil
1985-04-15 Well Mode changed to Flowing
1986-12-14 Perforation Treatment Performed - Jet Perforation
1986-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-16 Well Fluid changed to Crude Oil
1986-12-16 Well Mode changed to Pumping
1987-03-31 Well Fluid changed to Crude Oil
1987-03-31 Well Mode changed to Suspended
1987-09-28 Perforation Treatment Performed - Cement Plug
1987-10-01 Well Fluid changed to Crude Oil
1987-10-01 Well Mode changed to Pumping
1987-10-03 Perforation Treatment Performed - Jet Perforation
1987-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-28 Well Log Performed
1989-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-29 Perforation Treatment Performed - Jet Perforation
1990-09-25 Well Fluid changed to Crude Oil
1990-09-25 Well Mode changed to Suspended
1991-11-10 Well Fluid changed to Crude Oil
1991-11-10 Well Mode changed to Pumping
2004-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-09 Plug Back Performed
2004-01-09 Well Fluid changed to Crude Oil
2004-01-09 Well Mode changed to Abandoned Zone
2010-09-05 Well Log Performed
2010-09-06 Well Log Performed
2010-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-08 Plug Back Performed
2010-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-09-27 Perforation Treatment Performed - Jet Perforation
2010-10-01 Perforation Treatment Performed - Remedial Casing
2010-10-19 Well Abandoned
2010-10-19 Well Fluid changed to Crude Oil
2010-10-19 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-08-20 1330.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-11-03 Perforation 1592.00 1593.00 13
1986-12-14 Perforation 1591.00 1593.00 13
1986-12-15 Acid Treatment 1591.00 1593.00 0
1987-09-28 Cement Plug 1591.00 1596.80 0
1987-10-03 Perforation 1587.00 1589.00 13
1987-10-04 Acid Treatment 1587.00 1589.00 0
1989-08-29 Perforation 1583.50 1585.00 16
1989-08-29 Acid Treatment 1583.50 1585.00 0
2004-01-09 Packing Device Capped w/Cement 1567.00 1575.00 0
2010-09-08 Packing Device Capped w/Cement 1503.00 1511.00 0
2010-09-27 Perforation 456.00 456.90 99
1984-11-10 Perforation 1522.40 1525.40 13
2010-09-27 Perforation 456.00 457.00 17
2010-09-27 Acid Treatment 456.00 457.00 0
2010-10-01 Remedial Casing Cementing 456.00 457.00 0
1984-11-11 Fracture 1522.40 1525.40 0
1984-11-21 Casing Patch 1522.40 1525.40 0
1985-01-19 Perforation 1522.40 1525.40 13
1985-01-28 Cement Squeeze 1592.00 1593.00 0
1985-01-30 Cement Squeeze 1522.40 1525.40 0
1985-02-18 Open Hole/Barefoot Completion 1593.80 1596.80 0
1985-02-27 Perforation 1595.70 1596.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 376 0.0 0.0 0.0
1985 6153 0.0 0.0 0.0
1986 8085 0.0 0.0 0.0
1987 4227 0.0 0.0 0.0
1988 8543 0.0 0.0 0.0
1989 3836 0.0 0.0 0.0
1991 1242 0.0 0.0 0.0
1992 8602 0.0 0.0 0.0
1993 8047 0.0 0.0 0.0
1994 8650 0.0 0.0 0.0
1995 1344 0.0 0.0 0.0
1997 2886 0.0 0.0 0.0

For data sources see[6]

References