X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156070409000

Well Details

Well ID: 1156070409000
Loading map...
Location: 00/09-04-115-07W6/0
Location Alias: 00/09-04-15-07 W6M
Location Alias 2: 00/09-04-115-07 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 07
Section: 04
County/Municipality: Mackenzie County
Well Name: ACL AMBER 9-4-115-7
Operator Name: Paramount Resources Ltd.
License Number: 0103564
License Date: 1983-10-14
License Status: Re-Entered
Spud Date: 1983-10-20
Final Drill Date: 1983-11-16
Well Total Depth: 1602.00 m
Surface Hole Latitude: 58.958434
Surface Hole Longitude: -119.115205

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-10-14 Obtained License
1983-11-05 Drill Stem Test Performed
1983-11-09 Drill Stem Test Performed
1983-11-10 Drill Stem Test Performed
1983-11-16 Finished Drilling
1983-11-16 Well Mode changed to Drilled and Cased
1983-11-17 Drill Stem Test Performed
1983-11-18 Drill Stem Test Performed
1983-11-20 Liner Casing Operation Performed
1983-11-23 Perforation Treatment Performed - Jet Perforation
1983-12-07 Well Began Production
1983-12-07 Well Fluid changed to Crude Oil
1983-12-07 Well Mode changed to Flowing
1983-12-15 Well Log Performed
1984-01-18 Perforation Treatment Performed - Jet Perforation
1984-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-27 Perforation Treatment Performed - Cement Squeeze
1984-02-01 Perforation Treatment Performed - Jet Perforation
1984-02-01 Well Log Performed
1984-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-08 Perforation Treatment Performed - Cement Squeeze
1984-02-11 Well Log Performed
1984-02-13 Perforation Treatment Performed - Abrasa-Jet Perforation
1984-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-17 Well Log Performed
1984-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-24 Perforation Treatment Performed - Cement Squeeze
1984-02-27 Perforation Treatment Performed - Jet Perforation
1984-02-27 Well Log Performed
1984-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-03-07 Plug Back Performed
1984-03-08 Perforation Treatment Performed - Jet Perforation
1984-03-08 Well Fluid changed to Crude Oil
1984-03-08 Well Mode changed to Abandoned Zone
1984-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-14 Perforation Treatment Performed - Jet Perforation
1984-03-14 Well Log Performed
1984-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-21 Perforation Treatment Performed - Jet Perforation
1984-03-26 Perforation Treatment Performed - Jet Perforation
1984-04-05 Perforation Treatment Performed - Jet Perforation
1984-04-06 Perforation Treatment Performed - Jet Perforation
1984-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-13 Perforation Treatment Performed - Jet Perforation
1993-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-24 Perforation Treatment Performed - Jet Perforation
1993-03-24 Perforation Treatment Performed - Remedial Casing
1993-03-24 Plug Back Performed
1993-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-11-23 Perforation 1568.50 1570.50 13
1984-02-14 Acid Treatment 1571.00 1572.00 0
1984-02-21 Acid Treatment 1571.00 1572.00 0
1984-02-24 Cement Squeeze 1571.00 1572.00 0
1984-02-27 Perforation 1573.50 1574.50 13
1984-02-28 Acid Treatment 1573.50 1574.50 0
1984-03-07 Packing Device Capped w/Cement 1559.50 1565.00 0
1984-03-08 Perforation 1547.00 1549.00 13
1984-03-11 Acid Treatment 1547.00 1549.00 0
1984-03-14 Perforation 1535.50 1537.50 7
1984-03-15 Acid Treatment 1535.50 1537.50 0
1984-01-18 Perforation 1576.50 1577.50 13
1984-03-19 Acid Treatment 1535.50 1537.50 0
1984-03-21 Perforation 1518.00 1521.50 7
1984-03-26 Perforation 1501.50 1507.00 7
1984-04-05 Perforation 1506.10 1507.00 13
1984-04-06 Perforation 1501.50 1506.20 13
1984-04-07 Acid Treatment 1501.50 1507.00 0
1984-04-13 Perforation 1494.00 1498.00 13
1984-04-13 Acid Treatment 1494.00 1498.00 0
1993-03-24 Packing Device Capped w/Cement 1435.00 1455.00 0
1993-03-24 Perforation 341.20 342.00 13
1984-01-19 Acid Treatment 1568.50 1577.50 0
1993-03-24 Remedial Casing Cementing 341.20 342.00 0
1993-03-25 Packing Device Capped w/Cement 253.00 263.00 0
1984-01-20 Acid Treatment 1576.50 1577.50 0
1984-01-27 Cement Squeeze 1568.50 1577.50 0
1984-02-01 Perforation 1568.50 1570.00 13
1984-02-04 Acid Treatment 1568.50 1570.00 0
1984-02-08 Cement Squeeze 1568.50 1570.00 0
1984-02-13 Hydra Jet Perforation 1571.00 1572.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 120 0.0 0.0 0.0
1984 196 0.0 0.0 0.0

For data sources see[5]

References