X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156070103002

Well Details

Well ID: 1156070103002
Loading map...
Location: 00/03-01-115-07W6/2
Location Alias: 00/03-01-15-07 W6M
Location Alias 2: 00/03-01-115-07 W6/02
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 07
Section: 01
County/Municipality: Mackenzie County
Well Name: ACL AMBER 3-1-115-7
Operator Name: Paramount Resources Ltd.
License Number: 0036649
License Date: 1969-08-01
License Status: Abandoned
Spud Date: 1969-08-07
Final Drill Date: 1969-09-01
Well Total Depth: 1635.90 m
Surface Hole Latitude: 58.953393
Surface Hole Longitude: -119.045904

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-08-01 Obtained License
1969-08-22 Well Log Performed
1969-08-23 Drill Stem Test Performed
1969-08-26 Drill Stem Test Performed
1969-09-01 Finished Drilling
1969-09-01 Well Mode changed to Drilled and Cased
1969-09-03 Drill Stem Test Performed
1969-09-04 Drill Stem Test Performed
1969-09-05 Liner Casing Operation Performed
1969-09-07 Well Log Performed
1969-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-09-30 Perforation Treatment Performed - Jet Perforation
1969-10-28 Perforation Treatment Performed - Cement Squeeze
1969-10-29 Perforation Treatment Performed - Cement Squeeze
1969-10-30 Perforation Treatment Performed - Jet Perforation
1969-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-07-03 Well Log Performed
1971-03-11 Well Log Performed
1971-03-12 Perforation Treatment Performed - Cement Squeeze
1992-10-29 Well Log Performed
1992-10-30 Perforation Treatment Performed - Cement Squeeze
1992-10-31 Well Log Performed
1992-11-01 Perforation Treatment Performed - Jet Perforation
1992-11-03 Perforation Treatment Performed - Cement Squeeze
1992-11-06 Well Log Performed
1992-11-07 Perforation Treatment Performed - Jet Perforation
1992-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-09 Well Log Performed
1992-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-11 Well Log Performed
1995-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-12 Perforation Treatment Performed - Jet Perforation
1999-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-13 Perforation Treatment Performed - Jet Perforation
1999-12-13 Plug Back Performed
1999-12-13 Well Log Performed
1999-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-06 Well Began Production
2000-03-06 Well Fluid changed to Gas
2000-03-06 Well Mode changed to Flowing
2003-07-11 Well Log Performed
2003-07-12 Well Log Performed
2003-07-13 Perforation Treatment Performed - Jet Perforation
2003-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-01 Well Fluid changed to Gas
2010-12-01 Well Mode changed to Suspended
2011-01-24 Perforation Treatment Performed - Cement Squeeze
2011-01-24 Plug Back Performed
2011-01-24 Well Fluid changed to Gas
2011-01-24 Well Mode changed to Abandoned Zone
2011-01-29 Perforation Treatment Performed - Jet Perforation
2011-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-04 Plug Back Performed
2011-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-07 Perforation Treatment Performed - Jet Perforation
2011-02-07 Well Log Performed
2011-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-08 Perforation Treatment Performed - Jet Perforation
2011-02-08 Perforation Treatment Performed - Remedial Casing
2011-02-08 Well Log Performed
2011-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-09 Perforation Treatment Performed - Remedial Casing
2011-03-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-09-30 Perforation 1586.20 1589.20 7
1992-11-03 Cement Squeeze 1566.60 1569.60 0
1992-11-07 Perforation 1578.00 1580.00 13
1992-11-08 Acid Treatment 1578.00 1580.00 0
1992-11-10 Packing Device Capped w/Cement 1554.00 1562.00 0
1995-04-12 Perforation 1526.00 1530.00 20
1995-04-12 Acid Treatment 1526.00 1530.00 0
1999-12-13 Packing Device Capped w/Cement 1514.00 1522.00 0
1999-12-13 Perforation 1408.20 1414.30 13
1999-12-14 Acid Treatment 1408.20 1414.30 0
2003-07-13 Perforation 1335.60 1341.10 14
1969-09-30 Acid Treatment 1586.20 1589.20 0
2003-07-15 Acid Treatment 1335.60 1341.10 0
2011-01-24 Cement Squeeze 1408.20 1414.30 0
2011-01-24 Cement Squeeze 1335.60 1341.10 0
2011-01-29 Perforation 1526.00 1530.00 20
2011-01-29 Perforation 1578.00 1580.00 13
2011-02-04 Packing Device Capped w/Cement 1512.00 1520.00 0
2011-02-06 Packing Device Capped w/Cement 1392.00 1400.00 0
2011-02-06 Packing Device Capped w/Cement 1487.00 1495.00 0
2011-02-07 Packing Device Capped w/Cement 1322.00 1330.00 0
2011-02-07 Perforation 725.00 726.00 17
1969-10-28 Cement Squeeze 1586.20 1589.20 0
2011-02-08 Packing Device Capped w/Cement 708.10 723.10 0
2011-02-08 Remedial Casing Cementing 725.00 726.00 0
2011-02-08 Perforation 377.00 378.00 17
2011-02-09 Remedial Casing Cementing 377.00 378.00 0
2011-02-09 Packing Device Capped w/Cement 360.00 375.00 0
1969-10-29 Cement Squeeze 1586.20 1589.20 0
1969-10-30 Perforation 1579.80 1582.50 3
1969-10-31 Acid Treatment 1579.80 1582.50 0
1971-03-12 Cement Squeeze 1574.30 1575.80 0
1992-10-30 Cement Squeeze 1579.80 1582.50 0
1992-11-01 Perforation 1566.60 1569.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 719 0.0 0.0 0.0
2000 5837 0.0 0.0 0.0
2001 8627 0.0 0.0 0.0
2002 5363 0.0 0.0 0.0

For data sources see[5]

References