X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156062210002

Well Details

Well ID: 1156062210002
Loading map...
Location: 00/10-22-115-06W6/2
Location Alias: 00/10-22-15-06 W6M
Location Alias 2: 00/10-22-115-06 W6/02
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 06
Section: 22
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 10-22-115-6
Operator Name: Paramount Resources Ltd.
License Number: 0033564
License Date: 1968-01-30
License Status: Abandoned
Spud Date: 1968-02-14
Final Drill Date: 1968-03-11
Well Total Depth: 1638.30 m
Surface Hole Latitude: 59.003483
Surface Hole Longitude: -118.918711

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-01-30 Obtained License
1968-02-25 Drill Stem Test Performed
1968-02-28 Drill Stem Test Performed
1968-03-08 Drill Stem Test Performed
1968-03-11 Finished Drilling
1968-03-11 Well Mode changed to Drilled and Cased
1968-03-17 Drill Stem Test Performed
1968-03-18 Liner Casing Operation Performed
1968-03-19 Well Log Performed
1968-03-20 Perforation Treatment Performed - Jet Perforation
1984-02-09 Well Log Performed
1995-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-19 Perforation Treatment Performed - Jet Perforation
1995-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-31 Well Log Performed
2001-09-01 Well Log Performed
2001-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-03 Perforation Treatment Performed - Jet Perforation
2001-09-03 Plug Back Performed
2001-09-03 Well Log Performed
2001-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-13 Well Began Production
2001-10-13 Well Fluid changed to Gas
2001-10-13 Well Mode changed to Flowing
2005-01-01 Well Fluid changed to Gas
2005-01-01 Well Mode changed to Pumping
2011-12-20 Well Log Performed
2012-01-06 Well Log Performed
2012-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-08 Plug Back Performed
2012-01-08 Well Fluid changed to Gas
2012-01-08 Well Mode changed to Abandoned Zone
2012-01-09 Perforation Treatment Performed - Cement Plug
2012-01-09 Well Log Performed
2012-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-10 Perforation Treatment Performed - Jet Perforation
2012-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-11 Perforation Treatment Performed - Remedial Casing
2012-01-11 Well Log Performed
2012-01-12 Perforation Treatment Performed - Jet Perforation
2012-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-14 Perforation Treatment Performed - Remedial Casing
2012-01-17 Well Abandoned
2012-01-17 Well Fluid changed to Gas
2012-01-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-03-20 Perforation 1572.80 1574.60 0
2001-09-03 Perforation 1311.80 1312.80 13
2001-09-03 Perforation 1306.40 1307.40 13
2001-09-03 Perforation 1296.00 1297.00 13
2001-09-05 Acid Treatment 1296.00 1322.60 0
2001-09-08 Acid Treatment 1296.00 1322.60 0
2012-01-08 Packing Device Capped w/Cement 1282.00 1290.00 0
2012-01-09 Cement Plug 784.00 873.00 0
2012-01-10 Packing Device Capped w/Cement 770.00 778.00 0
2012-01-10 Perforation 680.00 681.00 17
2012-01-11 Packing Device Capped w/Cement 663.00 672.00 0
1968-03-20 Perforation 1575.80 1578.30 0
2012-01-11 Remedial Casing Cementing 680.00 681.00 0
2012-01-12 Perforation 328.00 329.00 99
2012-01-13 Acid Treatment 328.00 329.00 0
2012-01-14 Remedial Casing Cementing 328.00 329.00 0
2012-01-14 Packing Device Capped w/Cement 315.00 324.00 0
1995-06-17 Packing Device Capped w/Cement 1562.00 1570.00 0
1995-06-19 Perforation 1524.00 1527.00 13
1995-06-19 Perforation 1528.30 1529.20 13
1995-06-19 Perforation 1535.00 1536.20 13
1995-06-20 Acid Treatment 1524.00 1536.20 0
2001-09-03 Packing Device Capped w/Cement 1497.00 1505.00 0
2001-09-03 Perforation 1321.60 1322.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1387 0.0 0.0 0.0
2002 6236 0.0 0.0 0.0
2003 8314 0.0 0.0 0.0
2004 8664 0.0 0.0 0.0
2005 8731 0.0 0.0 0.0
2006 8576 0.0 0.0 0.0
2007 8696 0.0 0.0 0.0
2008 8517 0.0 0.0 0.0
2009 8664 0.0 0.0 0.0
2010 8339 0.0 0.0 0.0
2011 7945 0.0 0.0 0.0

For data sources see[5]

References