If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1156060314003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.961758,"lon":-118.928297,"icon":""}]} |
| Location: 00/14-03-115-06W6/3 | |
| Location Alias: 00/14-03-15-06 W6M | |
| Location Alias 2: 00/14-03-115-06 W6/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 115 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 03 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL VIRGO 14-3-115-6 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0036047 | |
| License Date: 1969-03-18 | |
| License Status: Issued | |
| Spud Date: 1969-04-04 | |
| Final Drill Date: 1969-04-27 | |
| Well Total Depth: 1572.80 m | |
| Surface Hole Latitude: 58.961758 | |
| Surface Hole Longitude: -118.928297 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1969-03-18 | Obtained License |
| 1969-04-20 | Drill Stem Test Performed |
| 1969-04-24 | Intermediate Casing Operation Performed |
| 1969-04-27 | Finished Drilling |
| 1969-04-27 | Perforation Treatment Performed - Open-Hole Completion |
| 1969-04-27 | Well Mode changed to Drilled and Cased |
| 1969-04-28 | Well Log Performed |
| 1969-10-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-01-20 | Well Log Performed |
| 1990-03-12 | Well Log Performed |
| 1991-03-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1991-03-16 | Plug Back Performed |
| 1991-03-17 | Well Log Performed |
| 1991-03-19 | Perforation Treatment Performed - Jet Perforation |
| 1997-12-19 | Perforation Treatment Performed - Jet Perforation |
| 1997-12-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-12-20 | Well Log Performed |
| 2004-09-24 | Well Log Performed |
| 2004-09-26 | Perforation Treatment Performed - Cement Squeeze |
| 2004-10-12 | Liner Casing Operation Performed |
| 2004-10-12 | Perforation Treatment Performed - Cement Squeeze |
| 2004-10-12 | Plug Back Performed |
| 2004-10-13 | Well Log Performed |
| 2004-10-14 | Perforation Treatment Performed - Jet Perforation |
| 2004-10-15 | Perforation Treatment Performed - Remedial Casing |
| 2004-10-17 | Well Log Performed |
| 2004-10-19 | Well Log Performed |
| 2004-10-20 | Perforation Treatment Performed - Jet Perforation |
| 2004-10-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2004-10-21 | Well Log Performed |
| 2004-10-24 | Perforation Treatment Performed - Jet Perforation |
| 2004-10-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2004-11-18 | Well Began Production |
| 2004-11-18 | Well Fluid changed to Crude Oil |
| 2004-11-18 | Well Mode changed to Pumping |
| 2019-07-31 | Well Fluid changed to Crude Oil |
| 2019-07-31 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1969-04-27 | Open Hole/Barefoot Completion | 1507.20 | 1572.80 | 0 |
| 2004-10-15 | Remedial Casing Cementing | 1463.00 | 1465.00 | 0 |
| 2004-10-20 | Perforation | 1559.50 | 1564.50 | 14 |
| 2004-10-21 | Acid Treatment | 1559.50 | 1564.50 | 0 |
| 2004-10-24 | Perforation | 1502.60 | 1507.00 | 13 |
| 2004-10-25 | Acid Treatment | 1502.60 | 1507.00 | 0 |
| 1969-10-02 | Acid Treatment | 1507.20 | 1545.00 | 0 |
| 1991-03-16 | Packing Device Capped w/Cement | 1413.00 | 1423.00 | 0 |
| 1991-03-19 | Perforation | 1304.20 | 1310.40 | 13 |
| 1997-12-19 | Perforation | 1389.60 | 1393.30 | 13 |
| 1997-12-20 | Acid Treatment | 1304.20 | 1393.30 | 0 |
| 2004-09-26 | Cement Squeeze | 1304.20 | 1310.40 | 0 |
| 2004-10-12 | Cement Squeeze | 1389.60 | 1393.30 | 0 |
| 2004-10-14 | Perforation | 1463.00 | 1465.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 1008 | 0.0 | 0.0 | 0.0 |
| 2005 | 8627 | 0.0 | 0.0 | 0.0 |
| 2006 | 8524 | 0.0 | 0.0 | 0.0 |
| 2007 | 8709 | 0.0 | 0.0 | 0.0 |
| 2008 | 8266 | 0.0 | 0.0 | 0.0 |
| 2009 | 8093 | 0.0 | 0.0 | 0.0 |
| 2010 | 8388 | 0.0 | 0.0 | 0.0 |
| 2011 | 5890 | 0.0 | 0.0 | 0.0 |
| 2012 | 8389 | 0.0 | 0.0 | 0.0 |
| 2013 | 8221 | 0.0 | 0.0 | 0.0 |
| 2014 | 7245 | 0.0 | 0.0 | 0.0 |
| 2015 | 3938 | 0.0 | 0.0 | 0.0 |
| 2016 | 7330 | 0.0 | 0.0 | 0.0 |
| 2017 | 8435 | 0.0 | 0.0 | 0.0 |
| 2018 | 8009 | 0.0 | 0.0 | 0.0 |
| 2019 | 2491 | 0.0 | 0.0 | 0.0 |
For data sources see[5]