X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156053204000

Well Details

Well ID: 1156053204000
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 00/04-32-115-05W6/0
Location Alias: 00/04-32-15-05 W6M
Location Alias 2: 00/04-32-115-05 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 32
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 4-32-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0042001
License Date: 1972-01-27
License Status: Suspension
Spud Date: 1972-02-24
Final Drill Date: 1972-03-12
Well Total Depth: 1559.10 m
Surface Hole Latitude: 59.024663
Surface Hole Longitude: -118.824402

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-01-27 Obtained License
1972-03-09 Liner Casing Operation Performed
1972-03-12 Finished Drilling
1972-03-12 Well Mode changed to Drilled and Cased
1972-03-26 Perforation Treatment Performed - Jet Perforation
1972-03-26 Well Log Performed
1972-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-03-27 Well Began Production
1972-03-27 Well Fluid changed to Crude Oil
1972-03-27 Well Mode changed to Flowing
1972-04-04 Well Fluid changed to Crude Oil
1972-04-04 Well Mode changed to Pumping
1988-11-02 Perforation Treatment Performed - Jet Perforation
1988-11-02 Well Log Performed
1988-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-06 Plug Back Performed
1994-02-06 Well Fluid changed to Crude Oil
1994-02-06 Well Mode changed to Abandoned Zone
1997-02-20 Well Log Performed
1997-02-21 Perforation Treatment Performed - Jet Perforation
1997-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-22 Well Log Performed
1997-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-23 Perforation Treatment Performed - Jet Perforation
1997-02-23 Plug Back Performed
1997-02-24 Perforation Treatment Performed - Remedial Casing
1997-02-25 Perforation Treatment Performed - Jet Perforation
2005-04-11 Perforation Treatment Performed - Cement Squeeze
2005-04-15 Perforation Treatment Performed - Jet Perforation
2005-04-17 Perforation Treatment Performed - Cement Squeeze
2005-04-21 Perforation Treatment Performed - Jet Perforation
2005-04-26 Well Log Performed
2005-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-27 Plug Back Performed
2005-04-27 Well Log Performed
2005-04-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-28 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-03-26 Perforation 1485.00 1490.80 7
1997-02-21 Perforation 1364.20 1365.50 13
1997-02-22 Acid Treatment 1359.50 1365.50 0
1997-02-23 Packing Device Capped w/Cement 1327.00 1335.00 0
1997-02-23 Perforation 377.00 377.50 13
1997-02-24 Remedial Casing Cementing 377.00 377.50 0
1997-02-25 Perforation 1275.20 1276.50 13
1997-02-25 Perforation 1270.40 1272.80 13
2005-04-11 Cement Squeeze 1270.40 1276.50 0
2005-04-15 Perforation 1359.50 1360.00 13
2005-04-15 Perforation 1360.60 1361.90 13
1972-03-26 Perforation 1493.50 1498.10 7
2005-04-15 Perforation 1362.40 1363.10 13
2005-04-15 Perforation 1364.20 1365.30 13
2005-04-17 Cement Squeeze 1359.50 1365.30 0
2005-04-21 Perforation 1473.70 1481.30 13
2005-04-21 Perforation 1485.00 1490.80 7
2005-04-21 Perforation 1493.50 1498.10 7
2005-04-27 Packing Device Capped w/Cement 1410.00 1466.00 0
2005-04-28 Packing Device Capped w/Cement 1342.00 1350.00 0
2005-04-28 Packing Device Capped w/Cement 1252.00 1260.00 0
1972-03-27 Acid Treatment 1485.00 1498.10 0
1988-11-02 Perforation 1473.70 1481.30 13
1988-11-03 Acid Treatment 1473.70 1481.30 0
1994-02-06 Packing Device Capped w/Cement 1460.00 1468.00 0
1997-02-21 Perforation 1359.50 1360.00 13
1997-02-21 Perforation 1360.60 1361.90 13
1997-02-21 Perforation 1362.40 1363.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 5099 0.0 0.0 0.0
1973 3055 0.0 0.0 0.0
1974 3365 0.0 0.0 0.0
1975 1588 0.0 0.0 0.0
1976 1784 0.0 0.0 0.0
1977 2202 0.0 0.0 0.0
1978 2503 0.0 0.0 0.0
1979 3957 0.0 0.0 0.0
1980 3849 0.0 0.0 0.0
1981 3880 0.0 0.0 0.0
1982 5950 0.0 0.0 0.0
1983 5522 0.0 0.0 0.0
1984 8083 0.0 0.0 0.0
1985 6709 0.0 0.0 0.0
1986 6980 0.0 0.0 0.0
1987 8028 0.0 0.0 0.0
1988 7538 0.0 0.0 0.0
1989 8283 0.0 0.0 0.0
1990 7764 0.0 0.0 0.0
1991 7868 0.0 0.0 0.0
1992 7962 0.0 0.0 0.0
1993 1104 0.0 0.0 0.0

For data sources see[5]

References

BESbswy