X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156053110002

Well Details

Well ID: 1156053110002
Loading map...
Location: 00/10-31-115-05W6/2
Location Alias: 00/10-31-15-05 W6M
Location Alias 2: 00/10-31-115-05 W6/02
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 31
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 10-31-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0033349
License Date: 1967-12-28
License Status: Suspension
Spud Date: 1967-12-31
Final Drill Date: 1968-01-29
Well Total Depth: 1569.10 m
Surface Hole Latitude: 59.033585
Surface Hole Longitude: -118.839703

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-12-28 Obtained License
1968-01-20 Drill Stem Test Performed
1968-01-22 Drill Stem Test Performed
1968-01-24 Production Casing Operation Performed
1968-01-29 Finished Drilling
1968-01-29 Well Mode changed to Drilled and Cased
1968-01-30 Drill Stem Test Performed
1968-01-31 Perforation Treatment Performed - Cement Plug
1968-01-31 Perforation Treatment Performed - Open-Hole Completion
1968-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-12-20 Perforation Treatment Performed - Open-Hole Completion
1971-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-01-12 Perforation Treatment Performed - Cement Squeeze
1977-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-01-13 Perforation Treatment Performed - Jet Perforation
1986-01-20 Perforation Treatment Performed - Open-Hole Completion
1986-01-23 Perforation Treatment Performed - Jet Perforation
1986-01-23 Well Log Performed
1986-01-24 Well Log Performed
1986-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-26 Perforation Treatment Performed - Remedial Casing
1986-01-26 Well Log Performed
1986-12-09 Well Log Performed
1989-11-06 Perforation Treatment Performed - Jet Perforation
1989-11-06 Well Log Performed
1989-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-08 Well Log Performed
1989-11-09 Perforation Treatment Performed - Cement Squeeze
1989-11-09 Perforation Treatment Performed - Jet Perforation
1989-11-09 Well Log Performed
1989-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-11 Perforation Treatment Performed - Jet Perforation
1989-11-11 Well Log Performed
1989-11-12 Perforation Treatment Performed - Acid Wash - No Pressure
1989-11-12 Perforation Treatment Performed - Remedial Casing
1994-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-23 Plug Back Performed
1994-12-03 Perforation Treatment Performed - Jet Perforation
1994-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-12-01 Well Began Production
1996-12-01 Well Fluid changed to Gas
1996-12-01 Well Mode changed to Flowing
1997-12-11 Well Fluid changed to Gas
1997-12-11 Well Mode changed to Abandoned Zone
1997-12-12 Well Log Performed
1997-12-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-01-31 Cement Plug 1517.90 1569.10 0
1986-01-20 Open Hole/Barefoot Completion 1507.20 1563.40 13
1986-01-23 Perforation 1295.20 1295.80 13
1986-01-25 Acid Treatment 1295.20 1295.80 0
1986-01-26 Remedial Casing Cementing 1295.20 1295.80 0
1989-11-06 Perforation 1281.00 1282.00 13
1989-11-08 Acid Treatment 1281.00 1282.00 0
1989-11-09 Cement Squeeze 1281.00 1282.00 0
1989-11-09 Perforation 293.00 293.30 80
1989-11-10 Acid Treatment 293.00 293.30 0
1989-11-11 Perforation 283.00 283.30 80
1968-01-31 Open Hole/Barefoot Completion 1507.20 1517.90 0
1989-11-12 Acid Wash 283.00 293.30 0
1989-11-12 Remedial Casing Cementing 283.00 293.30 0
1994-06-23 Packing Device Capped w/Cement 1494.00 1502.00 0
1994-12-03 Perforation 1367.30 1368.50 13
1994-12-03 Perforation 1371.60 1374.60 13
1994-12-05 Acid Treatment 1367.30 1374.60 0
1968-02-10 Acid Treatment 1507.20 1517.90 0
1969-12-20 Open Hole/Barefoot Completion 1507.20 1569.10 0
1969-12-20 Acid Treatment 1555.10 1569.10 0
1971-06-27 Acid Treatment 1507.20 1569.10 0
1977-01-12 Cement Squeeze 1507.20 1569.10 0
1977-01-13 Perforation 1495.70 1504.80 3
1977-01-13 Acid Treatment 1495.70 1504.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 181 0.0 0.0 0.0
1997 3421 0.0 0.0 0.0
1998 572 0.0 0.0 0.0

For data sources see[5]

References