1156052912002

Well Details

Well ID: 1156052912002
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 00/12-29-115-05W6/2
Location Alias: 00/12-29-15-05 W6M
Location Alias 2: 00/12-29-115-05 W6/02
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 29
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 12-29-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0041997
License Date: 1972-01-27
License Status: Suspension
Spud Date: 1972-02-01
Final Drill Date: 1972-02-17
Well Total Depth: 1539.20 m
Surface Hole Latitude: 59.016182
Surface Hole Longitude: -118.819584

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-01-27 Obtained License
1972-02-13 Liner Casing Operation Performed
1972-02-16 Drill Stem Test Performed
1972-02-17 Finished Drilling
1972-02-17 Lost Circulation Occurred
1972-02-17 Perforation Treatment Performed - Open-Hole Completion
1972-02-17 Well Mode changed to Drilled and Cased
1972-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-08-31 Perforation Treatment Performed - Jet Perforation
1982-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-19 Perforation Treatment Performed - Cement Squeeze
1982-07-24 Perforation Treatment Performed - Open-Hole Completion
1982-09-13 Perforation Treatment Performed - Cement Plug
1982-09-13 Perforation Treatment Performed - Cement Squeeze
1982-09-20 Perforation Treatment Performed - Open-Hole Completion
1982-09-21 Perforation Treatment Performed - Jet Perforation
1982-12-01 Well Began Injection
1982-12-01 Well Fluid changed to Water
1982-12-01 Well Type changed to Injection
1984-08-11 Perforation Treatment Performed - Cement Squeeze
1984-08-12 Well Log Performed
1984-08-13 Perforation Treatment Performed - Jet Perforation
1984-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-01 Well Fluid changed to Water
1986-10-01 Well Mode changed to Suspended
1986-10-01 Well Type changed to Injection
1990-05-01 Well Fluid changed to Water
1990-05-01 Well Type changed to Injection
1991-12-01 Well Fluid changed to Water
1991-12-01 Well Mode changed to Suspended
1991-12-01 Well Type changed to Injection
1992-05-01 Well Fluid changed to Water
1992-05-01 Well Type changed to Injection
1992-06-30 Well Fluid changed to Water
1992-06-30 Well Mode changed to Suspended
1992-06-30 Well Type changed to Injection
1994-02-27 Perforation Treatment Performed - Cement Squeeze
1994-02-27 Perforation Treatment Performed - Jet Perforation
1994-02-27 Plug Back Performed
1994-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-20 Well Log Performed
1998-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-21 Perforation Treatment Performed - Jet Perforation
1998-06-21 Plug Back Performed
1998-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-22 Well Log Performed
1998-06-23 Perforation Treatment Performed - Jet Perforation
1998-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-03 Well Log Performed
1998-07-04 Perforation Treatment Performed - Jet Perforation
1998-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-03-28 Perforation Treatment Performed - Cement Squeeze
2005-03-28 Plug Back Performed
2005-03-28 Well Log Performed
2005-03-30 Perforation Treatment Performed - Cement Squeeze
2005-03-30 Plug Back Performed
2005-04-04 Perforation Treatment Performed - Jet Perforation
2005-04-08 Well Log Performed
2005-04-13 Well Log Performed
2005-04-14 Perforation Treatment Performed - Open-Hole Completion
2005-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-04-15 Perforation Treatment Performed - Jet Perforation
2005-04-21 Perforation Treatment Performed - Jet Perforation
2005-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-05-21 Well Began Production
2005-05-21 Well Fluid changed to Crude Oil
2005-05-21 Well Mode changed to Pumping
2008-04-06 Perforation Treatment Performed - Jet Perforation
2008-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-04-08 Perforation Treatment Performed - Jet Perforation
2008-04-09 Perforation Treatment Performed - Jet Perforation
2008-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-04-30 Well Fluid changed to Crude Oil
2008-04-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-02-17 Open Hole/Barefoot Completion 1452.70 1539.20 0
1982-07-24 Open Hole/Barefoot Completion 1452.70 1539.20 0
1982-09-13 Cement Squeeze 1452.70 1533.20 0
1982-09-13 Cement Plug 1536.00 1539.00 0
1982-09-20 Open Hole/Barefoot Completion 1533.00 1536.00 0
1982-09-21 Perforation 1474.00 1477.00 7
1982-09-21 Perforation 1483.00 1485.00 7
1984-08-11 Cement Squeeze 1474.00 1477.00 0
1984-08-13 Perforation 1474.00 1477.00 3
1984-08-14 Acid Treatment 1474.00 1477.00 0
1994-02-27 Cement Squeeze 1474.00 1485.00 0
1972-02-27 Acid Treatment 1452.70 1477.40 0
1994-02-27 Perforation 1465.00 1467.00 13
1994-02-28 Acid Treatment 1465.00 1467.00 0
1998-06-21 Packing Device Capped w/Cement 1447.00 1455.00 0
1998-06-21 Perforation 1344.70 1352.00 13
1998-06-22 Acid Treatment 1344.70 1352.00 0
1998-06-23 Perforation 1269.40 1273.80 13
1998-06-24 Acid Treatment 1269.40 1273.80 0
1998-07-04 Perforation 1281.00 1282.50 13
1998-07-04 Perforation 1283.50 1285.00 13
1998-07-13 Acid Treatment 1281.00 1285.00 0
1974-07-03 Acid Treatment 1452.70 1472.50 0
2005-03-28 Cement Squeeze 1269.40 1285.00 0
2005-03-30 Cement Squeeze 1344.70 1352.00 0
2005-04-04 Perforation 1465.00 1467.00 13
2005-04-14 Open Hole/Barefoot Completion 1533.20 1539.20 0
2005-04-15 Perforation 1465.00 1467.00 13
2005-04-15 Perforation 1469.40 1471.90 13
2005-04-15 Acid Treatment 1465.00 1471.90 0
2005-04-21 Perforation 1474.00 1477.00 13
2005-04-23 Acid Treatment 1465.00 1477.00 0
2008-04-06 Perforation 1508.00 1511.30 13
1975-10-28 Acid Treatment 1452.70 1472.50 0
2008-04-07 Acid Treatment 1508.00 1511.30 0
2008-04-08 Perforation 1503.30 1506.50 13
2008-04-08 Acid Treatment 1503.30 1506.50 0
2008-04-09 Perforation 1498.30 1502.10 13
2008-04-10 Acid Treatment 1498.30 1502.10 0
1977-08-26 Packing Device Capped w/Cement 1432.60 1432.60 0
1977-08-31 Perforation 1357.60 1360.60 7
1977-08-31 Perforation 1361.20 1363.10 7
1982-07-19 Acid Treatment 1357.60 1363.10 0
1982-07-19 Cement Squeeze 1357.60 1363.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
2005 3740 0.0 0.0 0.0
2006 8672 0.0 0.0 0.0
2007 8208 0.0 0.0 0.0
2008 2375 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1972-02-17 Lost Circulation 1508.70 1508.70

For data sources see[6]

References