X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156052912000

Well Details

Well ID: 1156052912000
Loading map...
Location: 00/12-29-115-05W6/0
Location Alias: 00/12-29-15-05 W6M
Location Alias 2: 00/12-29-115-05 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 29
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 12-29-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0041997
License Date: 1972-01-27
License Status: Suspension
Spud Date: 1972-02-01
Final Drill Date: 1972-02-17
Well Total Depth: 1539.20 m
Surface Hole Latitude: 59.016182
Surface Hole Longitude: -118.819584

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-01-27 Obtained License
1972-02-13 Liner Casing Operation Performed
1972-02-16 Drill Stem Test Performed
1972-02-17 Finished Drilling
1972-02-17 Lost Circulation Occurred
1972-02-17 Perforation Treatment Performed - Open-Hole Completion
1972-02-17 Well Mode changed to Drilled and Cased
1972-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-28 Well Began Production
1972-02-28 Well Fluid changed to Crude Oil
1972-02-28 Well Mode changed to Flowing
1972-03-24 Well Fluid changed to Crude Oil
1972-03-24 Well Mode changed to Pumping
1974-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-05-01 Well Fluid changed to Crude Oil
1977-05-01 Well Mode changed to Suspended
1977-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-08-31 Perforation Treatment Performed - Jet Perforation
1977-08-31 Well Fluid changed to Crude Oil
1977-08-31 Well Mode changed to Abandoned Zone
1982-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-19 Perforation Treatment Performed - Cement Squeeze
1982-07-24 Perforation Treatment Performed - Open-Hole Completion
1982-09-13 Perforation Treatment Performed - Cement Plug
1982-09-13 Perforation Treatment Performed - Cement Squeeze
1982-09-20 Perforation Treatment Performed - Open-Hole Completion
1982-09-21 Perforation Treatment Performed - Jet Perforation
1984-03-01 Well Fluid changed to Crude Oil
1984-03-01 Well Mode changed to Flowing
1984-08-11 Perforation Treatment Performed - Cement Squeeze
1984-08-12 Well Log Performed
1984-08-13 Perforation Treatment Performed - Jet Perforation
1984-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-20 Well Fluid changed to Crude Oil
1986-04-20 Well Mode changed to Suspended
1987-10-23 Well Fluid changed to Crude Oil
1987-10-23 Well Mode changed to Pumping
1994-02-27 Perforation Treatment Performed - Cement Squeeze
1994-02-27 Perforation Treatment Performed - Jet Perforation
1994-02-27 Plug Back Performed
1994-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-01 Well Fluid changed to Crude Oil
1995-03-01 Well Mode changed to Suspended
1998-06-20 Well Log Performed
1998-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-21 Perforation Treatment Performed - Jet Perforation
1998-06-21 Plug Back Performed
1998-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-22 Well Log Performed
1998-06-23 Perforation Treatment Performed - Jet Perforation
1998-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-03 Well Log Performed
1998-07-04 Perforation Treatment Performed - Jet Perforation
1998-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-03-28 Perforation Treatment Performed - Cement Squeeze
2005-03-28 Plug Back Performed
2005-03-28 Well Log Performed
2005-03-30 Perforation Treatment Performed - Cement Squeeze
2005-03-30 Plug Back Performed
2005-04-04 Perforation Treatment Performed - Jet Perforation
2005-04-08 Well Log Performed
2005-04-13 Well Log Performed
2005-04-14 Perforation Treatment Performed - Open-Hole Completion
2005-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-04-15 Perforation Treatment Performed - Jet Perforation
2005-04-21 Perforation Treatment Performed - Jet Perforation
2005-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-07-16 Well Began Injection
2005-07-16 Well Fluid changed to Water
2005-07-16 Well Type changed to Injection
2008-04-06 Perforation Treatment Performed - Jet Perforation
2008-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-04-08 Perforation Treatment Performed - Jet Perforation
2008-04-09 Perforation Treatment Performed - Jet Perforation
2008-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-01 Well Fluid changed to Water
2011-07-01 Well Mode changed to Suspended
2011-07-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-02-17 Open Hole/Barefoot Completion 1452.70 1539.20 0
1982-07-24 Open Hole/Barefoot Completion 1452.70 1539.20 0
1982-09-13 Cement Squeeze 1452.70 1533.20 0
1982-09-13 Cement Plug 1536.00 1539.00 0
1982-09-20 Open Hole/Barefoot Completion 1533.00 1536.00 0
1982-09-21 Perforation 1474.00 1477.00 7
1982-09-21 Perforation 1483.00 1485.00 7
1984-08-11 Cement Squeeze 1474.00 1477.00 0
1984-08-13 Perforation 1474.00 1477.00 3
1984-08-14 Acid Treatment 1474.00 1477.00 0
1994-02-27 Cement Squeeze 1474.00 1485.00 0
1972-02-27 Acid Treatment 1452.70 1477.40 0
1994-02-27 Perforation 1465.00 1467.00 13
1994-02-28 Acid Treatment 1465.00 1467.00 0
1998-06-21 Packing Device Capped w/Cement 1447.00 1455.00 0
1998-06-21 Perforation 1344.70 1352.00 13
1998-06-22 Acid Treatment 1344.70 1352.00 0
1998-06-23 Perforation 1269.40 1273.80 13
1998-06-24 Acid Treatment 1269.40 1273.80 0
1998-07-04 Perforation 1281.00 1282.50 13
1998-07-04 Perforation 1283.50 1285.00 13
1998-07-13 Acid Treatment 1281.00 1285.00 0
1974-07-03 Acid Treatment 1452.70 1472.50 0
2005-03-28 Cement Squeeze 1269.40 1285.00 0
2005-03-30 Cement Squeeze 1344.70 1352.00 0
2005-04-04 Perforation 1465.00 1467.00 13
2005-04-14 Open Hole/Barefoot Completion 1533.20 1539.20 0
2005-04-15 Perforation 1465.00 1467.00 13
2005-04-15 Perforation 1469.40 1471.90 13
2005-04-15 Acid Treatment 1465.00 1471.90 0
2005-04-21 Perforation 1474.00 1477.00 13
2005-04-23 Acid Treatment 1465.00 1477.00 0
2008-04-06 Perforation 1508.00 1511.30 13
1975-10-28 Acid Treatment 1452.70 1472.50 0
2008-04-07 Acid Treatment 1508.00 1511.30 0
2008-04-08 Perforation 1503.30 1506.50 13
2008-04-08 Acid Treatment 1503.30 1506.50 0
2008-04-09 Perforation 1498.30 1502.10 13
2008-04-10 Acid Treatment 1498.30 1502.10 0
1977-08-26 Packing Device Capped w/Cement 1432.60 1432.60 0
1977-08-31 Perforation 1357.60 1360.60 7
1977-08-31 Perforation 1361.20 1363.10 7
1982-07-19 Acid Treatment 1357.60 1363.10 0
1982-07-19 Cement Squeeze 1357.60 1363.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 5696 0.0 0.0 0.0
1973 6832 0.0 0.0 0.0
1974 7941 0.0 0.0 0.0
1975 7472 0.0 0.0 0.0
1976 6295 0.0 0.0 0.0
1977 1878 0.0 0.0 0.0
1984 832 0.0 0.0 0.0
1985 3328 0.0 0.0 0.0
1986 1714 0.0 0.0 0.0
1987 1610 0.0 0.0 0.0
1988 1860 0.0 0.0 0.0
1993 24 0.0 0.0 0.0
1994 4309 0.0 0.0 0.0
1995 528 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1972-02-17 Lost Circulation 1508.70 1508.70

For data sources see[6]

References