If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1156052802000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.011109,"lon":-118.77635,"icon":""}]} |
Location: 00/02-28-115-05W6/0 | |
Location Alias: 00/02-28-15-05 W6M | |
Location Alias 2: 00/02-28-115-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 115 | |
Meridian: 6 | |
Range: 05 | |
Section: 28 | |
County/Municipality: Mackenzie County | |
Well Name: ACL VIRGO 2-28-115-5 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0035751 | |
License Date: 1969-02-05 | |
License Status: Abandoned | |
Spud Date: 1969-02-14 | |
Final Drill Date: 1969-03-06 | |
Well Total Depth: 1535.90 m | |
Surface Hole Latitude: 59.011109 | |
Surface Hole Longitude: -118.776350 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1969-02-05 | Obtained License |
1969-02-23 | Drill Stem Test Performed |
1969-02-25 | Drill Stem Test Performed |
1969-02-28 | Drill Stem Test Performed |
1969-03-02 | Intermediate Casing Operation Performed |
1969-03-06 | Finished Drilling |
1969-03-06 | Well Mode changed to Drilled and Cased |
1969-03-07 | Well Log Performed |
1969-03-08 | Drill Stem Test Performed |
1969-03-09 | Perforation Treatment Performed - Open-Hole Completion |
1969-03-15 | Perforation Treatment Performed - Jet Perforation |
1969-03-18 | Well Began Production |
1969-03-18 | Well Fluid changed to Crude Oil |
1969-03-18 | Well Mode changed to Flowing |
1974-01-30 | Well Fluid changed to Crude Oil |
1974-01-30 | Well Mode changed to Pumping |
1977-10-01 | Well Fluid changed to Crude Oil |
1977-10-01 | Well Mode changed to Suspended |
1978-09-20 | Well Fluid changed to Crude Oil |
1978-09-20 | Well Mode changed to Pumping |
1980-09-15 | Well Fluid changed to Crude Oil |
1980-09-15 | Well Mode changed to Suspended |
1996-02-09 | Well Log Performed |
1996-02-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-02-10 | Perforation Treatment Performed - Jet Perforation |
1996-02-10 | Plug Back Performed |
1996-02-10 | Well Fluid changed to Crude Oil |
1996-02-10 | Well Mode changed to Abandoned Zone |
1996-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-06-15 | Well Log Performed |
2005-06-16 | Perforation Treatment Performed - Jet Perforation |
2005-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-08-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-28 | Plug Back Performed |
2011-08-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-29 | Plug Back Performed |
2011-08-29 | Well Log Performed |
2011-08-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-30 | Well Log Performed |
2011-08-31 | Perforation Treatment Performed - Jet Perforation |
2011-09-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-09-03 | Perforation Treatment Performed - Remedial Casing |
2011-09-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-09-04 | Perforation Treatment Performed - Jet Perforation |
2011-09-11 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1969-03-09 | Open Hole/Barefoot Completion | 1481.00 | 1493.50 | 0 |
2005-06-17 | Acid Treatment | 1335.50 | 1337.50 | 0 |
2011-08-28 | Packing Device Capped w/Cement | 1321.00 | 1330.00 | 0 |
2011-08-29 | Packing Device Capped w/Cement | 1237.00 | 1245.00 | 0 |
2011-08-30 | Packing Device Capped w/Cement | 1087.00 | 1095.00 | 0 |
2011-08-31 | Perforation | 636.50 | 637.50 | 17 |
2011-09-03 | Packing Device Capped w/Cement | 616.00 | 625.00 | 0 |
2011-09-03 | Remedial Casing Cementing | 636.50 | 637.50 | 0 |
2011-09-04 | Packing Device Capped w/Cement | 272.00 | 280.00 | 0 |
2011-09-04 | Perforation | 286.00 | 287.00 | 17 |
1969-03-15 | Perforation | 1466.70 | 1469.10 | 13 |
1969-03-15 | Perforation | 1475.50 | 1478.30 | 13 |
1996-02-10 | Packing Device Capped w/Cement | 1442.00 | 1450.00 | 0 |
1996-02-10 | Perforation | 1254.50 | 1258.70 | 14 |
1996-02-10 | Perforation | 1267.90 | 1269.10 | 14 |
1996-02-10 | Perforation | 1270.90 | 1271.90 | 14 |
1996-02-21 | Acid Treatment | 1254.50 | 1271.90 | 0 |
2005-06-16 | Perforation | 1335.50 | 1337.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1969 | 5657 | 0.0 | 0.0 | 0.0 |
1970 | 5944 | 0.0 | 0.0 | 0.0 |
1971 | 3302 | 0.0 | 0.0 | 0.0 |
1972 | 3504 | 0.0 | 0.0 | 0.0 |
1973 | 6551 | 0.0 | 0.0 | 0.0 |
1974 | 3828 | 0.0 | 0.0 | 0.0 |
1975 | 4200 | 0.0 | 0.0 | 0.0 |
1976 | 4931 | 0.0 | 0.0 | 0.0 |
1977 | 4272 | 0.0 | 0.0 | 0.0 |
1978 | 2677 | 0.0 | 0.0 | 0.0 |
1979 | 4176 | 0.0 | 0.0 | 0.0 |
1980 | 3640 | 0.0 | 0.0 | 0.0 |
For data sources see[5]