X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156052205003

Well Details

Well ID: 1156052205003
Loading map...
Location: 00/05-22-115-05W6/3
Location Alias: 00/05-22-15-05 W6M
Location Alias 2: 00/05-22-115-05 W6/03
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 22
County/Municipality: Mackenzie County
Well Name: ACL ET AL VIRGO 5-22-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0114123
License Date: 1985-03-28
License Status: Abandoned
Spud Date: 1985-05-26
Final Drill Date: 1985-06-28
Well Total Depth: 1638.00 m
Surface Hole Latitude: 58.999964
Surface Hole Longitude: -118.765152

For data sources see[1][2]

Well History

Date Event
1985-03-28 Obtained License
1985-05-28 Surface Casing Operation Performed
1985-06-04 Well Log Performed
1985-06-14 Direction Drilling Operation Performed - Deviate
1985-06-23 Well Log Performed
1985-06-24 Intermediate Casing Operation Performed
1985-06-26 Lost Circulation Occurred
1985-06-28 Finished Drilling
1985-06-28 Well Log Performed
1985-06-28 Well Mode changed to Drilled and Cased
1985-06-30 Drill Stem Test Performed
1985-07-01 Plug Back Performed
1985-07-02 Liner Casing Operation Performed
1985-07-03 Rig Released
1985-07-21 Well Log Performed
1985-07-22 Well Log Performed
1985-07-24 Perforation Treatment Performed - Jet Perforation
1985-09-03 Well Log Performed
1986-03-20 Perforation Treatment Performed - Cement Squeeze
1986-03-20 Plug Back Performed
1986-03-21 Perforation Treatment Performed - Jet Perforation
1986-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-03-25 Plug Back Performed
1986-03-26 Perforation Treatment Performed - Jet Perforation
1986-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-28 Perforation Treatment Performed - Jet Perforation
1993-05-04 Well Log Performed
1993-05-05 Perforation Treatment Performed - Cement Squeeze
1993-05-05 Well Log Performed
1993-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-06 Perforation Treatment Performed - Jet Perforation
1996-03-19 Well Log Performed
1996-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-20 Well Log Performed
1996-03-21 Perforation Treatment Performed - Jet Perforation
1996-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-29 Well Began Production
1996-04-29 Well Fluid changed to Gas
1996-04-29 Well Mode changed to Flowing
1997-02-15 Perforation Treatment Performed - Jet Perforation
1997-02-15 Well Log Performed
1997-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-29 Well Fluid changed to Gas
1998-01-29 Well Mode changed to Suspended
2002-03-08 Well Fluid changed to Gas
2002-03-08 Well Mode changed to Flowing
2008-07-14 Perforation Treatment Performed - Cement Plug
2008-07-14 Plug Back Performed
2008-07-14 Well Fluid changed to Gas
2008-07-14 Well Mode changed to Abandoned Zone
2008-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-15 Plug Back Performed
2008-07-24 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-06-14 990.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-07-24 Perforation 1503.00 1506.00 13
1993-05-05 Cement Squeeze 1470.00 1480.00 0
1993-05-06 Perforation 1459.50 1461.50 13
1993-05-06 Perforation 1464.50 1468.00 13
1993-05-06 Acid Treatment 1459.50 1468.00 0
1996-03-20 Packing Device Capped w/Cement 1433.00 1441.00 0
1996-03-21 Perforation 1252.00 1260.00 14
1996-03-22 Acid Treatment 1252.00 1260.00 0
1997-02-15 Perforation 1337.70 1345.20 14
1997-02-17 Acid Treatment 1337.70 1345.20 0
2008-07-14 Cement Plug 1320.30 1368.00 0
1986-03-20 Cement Squeeze 1503.00 1506.00 0
2008-07-15 Packing Device Capped w/Cement 1230.00 1238.00 0
1986-03-21 Perforation 1519.50 1523.00 13
1986-03-24 Acid Treatment 1519.50 1523.00 0
1986-03-25 Packing Device Capped w/Cement 1501.00 1501.00 0
1986-03-26 Perforation 1492.00 1496.00 13
1986-03-27 Acid Treatment 1492.00 1496.00 0
1988-08-28 Perforation 1470.00 1480.00 13
1988-08-28 Acid Treatment 1470.00 1480.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3815 0.0 0.0 0.0
1997 2546 0.0 0.0 0.0
2002 5207 0.0 0.0 0.0
2003 3458 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-06-26 Lost Circulation 1530.00 1530.00

For data sources see[7]

References